Infrastructure Damage Report : शहीद सहायक कमान्डेंट चारुचंद्र पाठक मोटर मार्ग

1238 - अस्थाई खण्ड बेरीनाग - Pithoragarh

3

Total Damage Spots

₹ 15.60 Lakhs

Total Estimated Cost

0

Completed

3

Pending

Status Wise Distribution
Cost Analysis
शहीद सहायक कमान्डेंट चारुचंद्र पाठक मोटर मार्ग DivSegmentID:1238 Closure Report Closure Images

EE Office: अस्थाई खण्ड बेरीनाग

District: Pithoragarh

Segment ID: 4000, EE Segment ID: 1238

Pics Count: 3

Damage Spots Details
Spot #1 - ID:4089 , Madoli duboli, Chainage 1.800 - 1.820 , Damaged Length 0.02 KM

02-06-2025

Provisions (प्रावधानों की सूची)

dimension length -21.20m and height-7.5m. plum concrete and 1:6masonary wall

Remark: Wing wall and abutments are damaged .

₹ 12.75 Lakh
Identified
Fund:Unknown
Spot #2 - ID:120 , madoli duboli, Chainage 3.200 - 3.210 , Damaged Length 0.01 KM

15-08-2025

Provisions (प्रावधानों की सूची)

dimension 12m length and 3.5 m height retaining wall

Remark: Retaining wall damaged.

₹ 1.25 Lakh
Identified
Fund:Unknown
Spot #3 - ID:4930 , near uprada pathak ., Chainage 3.400 - 3.415 , Damaged Length 0.015 KM

27-08-2025

Provisions (प्रावधानों की सूची)

length 10m & Height 4m

Remark: Retaining wall damaged.

₹ 1.60 Lakh
Identified
Fund:Unknown

All Damage Spots

ID Date Location Cost (₹ Lakh) Chainages Status Yojana
4089 02-06-2025 Madoli duboli 12.75 1.800 to 1.820 0.02 Identified SRMD
120 15-08-2025 madoli duboli 1.25 3.200 to 3.210 0.0099999999999998 Identified SRMD
4930 27-08-2025 near uprada pathak . 1.60 3.400 to 3.415 0.015 Identified SRMD