Infrastructure Damage Report : जीरोब्रिज चौपडा सैण पिपोला मोटर मार्ग

2403 - प्रान्तीय खण्ड नई टिहरी - Tehri

3

Total Damage Spots

₹ 20.55 Lakhs

Total Estimated Cost

0

Completed

3

Pending

Status Wise Distribution
Cost Analysis
जीरोब्रिज चौपडा सैण पिपोला मोटर मार्ग DivSegmentID:2403 Closure Report Closure Images

EE Office: प्रान्तीय खण्ड नई टिहरी

District: Tehri

Segment ID: 4326, EE Segment ID: 2403

Pics Count: 6

Damage Spots Details
Spot #1 - ID:805 , Fakwa Bridge, Chainage 2.8 - 2.816 , Damaged Length 0.016 KM

02-08-2025

Provisions (प्रावधानों की सूची)

Plum R R 1:6 RR dry HP stone filling

Remark: Retaining wall damaged due to heavy rain. 16m wall has been proposed.

₹ 6.09 Lakh
Estimation Done
Fund:Unknown
Spot #2 - ID:789 , Village- Chopra, Chainage 0.3 - 0.325 , Damaged Length 0.025 KM

12-08-2025

Provisions (प्रावधानों की सूची)

RR 1:6, RR dry HP stone filing PCC 1:2:4

Remark: Retaining wall of length 22m and varying height between 6-8m has to be constructed.

₹ 10.62 Lakh
Estimation Done
Fund:Unknown
Spot #3 - ID:803 , Khaliyana Nametok, Chainage 8.8 - 8.809 , Damaged Length 0.009 KM

20-08-2025

Provisions (प्रावधानों की सूची)

R R 1:6 RR dry HP stone filling

Remark: Slip occured due to heavy rain. Visible cracks on road. 9m wall has been proposed.

₹ 3.84 Lakh
Estimation Done
Fund:Unknown

All Damage Spots

ID Date Location Cost (₹ Lakh) Chainages Status Yojana
805 02-08-2025 Fakwa Bridge 6.09 2.8 to 2.816 0.016 Estimation Done Not Decided
789 12-08-2025 Village- Chopra 10.62 0.3 to 0.325 0.025 Estimation Done Not Decided
803 20-08-2025 Khaliyana Nametok 3.84 8.8 to 8.809 0.0089999999999986 Estimation Done Not Decided