2620 - अस्थाई खण्ड घनसाली - Tehri
Total Damage Spots
Total Estimated Cost
Completed
Pending
EE Office: अस्थाई खण्ड घनसाली
District: Tehri
Segment ID: 4076, EE Segment ID: 2620
Pics Count: 28
16-08-2025
Plum wall - (20.00x1.00x1.00m) +(20.00x1.00x1.00m) gabions - (3.00x1.00x1.00m) in 13 nos. in 3 layers
Remark: मोटर मार्ग की चौड़ाई कम होने के कारण यातायात के सुचारु रूप से संचालन में कठिनाइयों का सामना करना पड रहा है एवं मोटर मार्ग जोखिमपूर्ण हो गया है तथा दुर्घटना की संभावना बनी रहती है | अतः दीवार निर्माण करवाया जाना अति आवश्यक है |
19-08-2025
Plum wall - (15.00x1.00x1.00m) +(10.00x1.00x1.00m) gabions - (3.00x1.00x1.00m) in 8 nos. in 3 layers R.R. Dry - (20.00x0.75x0.90)
Remark: मोटर मार्ग की चौड़ाई कम होने के कारण यातायात के सुचारु रूप से संचालन में कठिनाइयों का सामना करना पड रहा है एवं मोटर मार्ग जोखिमपूर्ण हो गया है तथा दुर्घटना की संभावना बनी रहती है | अतः दीवार निर्माण करवाया जाना अति आवश्यक है |
19-08-2025
Bended wall - (22.30x(2.30+0.60)x5.00m)
Remark: मोटर मार्ग की चौड़ाई कम होने के कारण यातायात के सुचारु रूप से संचालन में कठिनाइयों का सामना करना पड रहा है एवं मोटर मार्ग जोखिमपूर्ण हो गया है तथा दुर्घटना की संभावना बनी रहती है | अतः दीवार निर्माण करवाया जाना अति आवश्यक है |
19-08-2025
PCC 1:3:6 - 6.85X3.60X0.20 STONE MESONRY IN SUBSTRUCTURE 1:5 MORTAR P. C. C. GRADE M20 1:2:4 R. C. C M 25 HYSD BAR REINFORCEMENT H. P. STONE FIlling WEEP HOLES
Remark: Damage scupper due to monsoon heavy rain.
20-08-2025
Bended wall - (10.00x(2.20+0.60)x4.80m) 1:6 wall - (19.00x(0.90+0.60)x2.30m)
Remark: मोटर मार्ग की चौड़ाई कम होने के कारण यातायात के सुचारु रूप से संचालन में कठिनाइयों का सामना करना पड रहा है एवं मोटर मार्ग जोखिमपूर्ण हो गया है तथा दुर्घटना की संभावना बनी रहती है | अतः दीवार निर्माण करवाया जाना अति आवश्यक है |
21-08-2025
Plum wall - (12.50x1.00x1.00m) in 2 nos. + (15.50x1.00x1.00m) in 2 nos. gabions - (3.00x1.00x1.00m) in 10 nos. in 3layers+ (3.00x1.00x1.00m) in 8 nos. in 2 layers R.R. Dry wall H.P. Stone filling
Remark: मोटर मार्ग की चौड़ाई कम होने के कारण यातायात के सुचारु रूप से संचालन में कठिनाइयों का सामना करना पड रहा है एवं मोटर मार्ग जोखिमपूर्ण हो गया है तथा दुर्घटना की संभावना बनी रहती है | अतः दीवार निर्माण करवाया जाना अति आवश्यक है |
21-08-2025
Plum wall gabions Hume pipe scupper
Remark: मोटर मार्ग की चौड़ाई कम होने के कारण यातायात के सुचारु रूप से संचालन में कठिनाइयों का सामना करना पड रहा है एवं मोटर मार्ग जोखिमपूर्ण हो गया है तथा दुर्घटना की संभावना बनी रहती है | अतः दीवार निर्माण करवाया जाना अति आवश्यक है |
12-09-2025
R.R. DRY R.R. 1:6 HP STONE FILLING
21-07-2026
Plum conc. - 24.00x1.50x1.50 m Gabions - 3.00x1.00x1.00 in 8 Nos. H.P. Stone filling
Remark: Breast wall damaged
29-07-2026
Plum concrete - 12.00x1.45x1.20 m R.R. 1:6 in bended wall - 12.00 m R.R. Dry in Bended wall - 12.00 m H.P. Stone filling
Remark: R.wall damaged .
01-08-2026
NA
Remark: The entire area is experiencing significant ground subsidence (sink-down), resulting in severe distress and complete failure of the road pavement. Due to continuous settlement, extensive cracks and deformation have developed, making the road unsafe for vehicular movement. Consequently, the road has been completely damaged, and traffic has been closed until further stabilization and restoration works are carried out.
01-08-2026
NA
Remark: The affected road section is experiencing continuous slope failure, resulting in extensive damage to the carriageway. Owing to the unstable hill slope and persistent sliding, vehicular movement has been suspended as a precautionary measure. Traffic will be resumed after complete clearance of debris and stabilization of the affected area.
03-08-2026
R.R. DRY H.P. STONE FILLING
Remark: Breast wall is damaged due to heavy rain
28-08-2026
Remark: Gram panchayat building wall is damaged in newly constructed motor road
| ID | Date | Location | Cost (₹ Lakh) | Chainages | Status | Yojana |
|---|---|---|---|---|---|---|
| 1198 | 16-08-2025 | Tingarh | 6.99 | 6.075 to 6.100 0.024999999999999 | Estimation Done | SDRF |
| 1186 | 19-08-2025 | toli tingarh | 4.40 | 5.800 to 5.825 0.025 | Estimation Done | SDRF |
| 1208 | 19-08-2025 | jakhana | 6.19 | 7.400 to 7.425 0.024999999999999 | Estimation Done | SDRF |
| 6370 | 19-08-2025 | Vinakkhal | 4.13 | 2.875 to 2.880 0.0049999999999999 | Estimation Done | SDRF |
| 1212 | 20-08-2025 | jakhana | 4.55 | 8.375 to 8.400 0.025 | Estimation Done | SDRF |
| 1181 | 21-08-2025 | Tingarh | 11.68 | 5.575 to 5.625 0.05 | Estimation Done | SDRF |
| 1204 | 21-08-2025 | TINGARH JAKHANA | 32.00 | 6.300 to 6.400 0.1 | Estimation Done | SDRF |
| 6419 | 12-09-2025 | vinakkhal | 2.12 | Identified | Not Decided | |
| 6817 | 21-07-2026 | Vinakkhal | 3.90 | 2.650 to 2.675 0.025 | Identified | Not Decided |
| 7001 | 29-07-2026 | Jakhana | 6.00 | Identified | Not Decided | |
| 7014 | 01-08-2026 | Vinakkhal | 15.00 | Identified | Not Decided | |
| 7015 | 01-08-2026 | Jakhana | 32.00 | Identified | Not Decided | |
| 7319 | 03-08-2026 | Vinakkhal | 3.00 | Identified | Not Decided | |
| 8334 | 28-08-2026 | Dalla | 4.70 | 2.650 to 2.675 0.025 | Estimation Done | SDRF |