Infrastructure Damage Report : मसौन काण्डी द्वारगढ मोटर मार्ग

2848 - अस्थाई खण्ड थत्यूड़ - Tehri

15

Total Damage Spots

₹ 38.62 Lakhs

Total Estimated Cost

0

Completed

15

Pending

Status Wise Distribution
Cost Analysis
मसौन काण्डी द्वारगढ मोटर मार्ग DivSegmentID:2848 Closure Report Closure Images

EE Office: अस्थाई खण्ड थत्यूड़

District: Tehri

Segment ID: 4419, EE Segment ID: 2848

Pics Count: 15

Damage Spots Details
Spot #1 - ID:630 , Kheda, Chainage 12.900 - 12.915 , Damaged Length 0.015 KM

16-06-2025

Provisions (प्रावधानों की सूची)

Excavation Plum RR dry etc

Remark: PROTECTION WORK

₹ 3.63 Lakh
Sanctioned
Fund:Unknown
Spot #2 - ID:627 , Pab, Chainage 3.700 - 3.720 , Damaged Length 0.02 KM

29-06-2025

Provisions (प्रावधानों की सूची)

Excavation Gabions RR dry etc

Remark: PROTECTION WORK

₹ 2.50 Lakh
Estimation Done
Fund:Unknown
Spot #3 - ID:628 , Jedwar, Chainage 6.100 - 6.115 , Damaged Length 0.015 KM

29-06-2025

Provisions (प्रावधानों की सूची)

Excavation Plum Gabions RR dry etc

Remark: PROTECTION WORK

₹ 3.00 Lakh
Estimation Done
Fund:Unknown
Spot #4 - ID:629 , jedwar, Chainage 6.900 - 6.915 , Damaged Length 0.015 KM

30-06-2025

Provisions (प्रावधानों की सूची)

Excavation Plum Gabions RR dry etc

Remark: PROTECTION WORK

₹ 3.10 Lakh
Estimation Done
Fund:Unknown
Spot #5 - ID:712 , jedwar, Chainage 9.100 - 9.130 , Damaged Length 0.03 KM

30-06-2025

Provisions (प्रावधानों की सूची)
  1. PCC 1:2:4 for causeway
  2. Gabions
  3. causeway front wall as RR 1:6 CM R/wall

Remark: PROTECTION WORK

₹ 4.80 Lakh
Estimation Done
Fund:Unknown
Spot #6 - ID:3413 , KHEDA, Chainage 15.200 - 15.215 , Damaged Length 0.015 KM

11-07-2025

Provisions (प्रावधानों की सूची)

excavation,BENDED R/W

Remark: PROTECTION WORK

₹ 0.97 Lakh
Estimation Done
Fund:Unknown
Spot #7 - ID:5120 , PAB, Chainage 3.420 - 3.435 , Damaged Length 0.015 KM

12-09-2025

Provisions (प्रावधानों की सूची)

Plum toe wall & Bended retaining wall

Remark: NA

₹ 6.00 Lakh
Identified
Fund:Unknown
Spot #8 - ID:5121 , kHEDA, Chainage 14.960 - 14.975 , Damaged Length 0.015 KM

12-09-2025

Provisions (प्रावधानों की सूची)

Plum toe wall & Gabions

Remark: NA

₹ 1.50 Lakh
Estimation Done
Fund:Unknown
Spot #9 - ID:5123 , kHEDA, Chainage 15.450 - 15.465 , Damaged Length 0.015 KM

12-09-2025

Provisions (प्रावधानों की सूची)

Plum toe wall & Gabions

Remark: NA

₹ 0.97 Lakh
Estimation Done
Fund:Unknown
Spot #10 - ID:7530 , Near Kheda village, Chainage 15.180 - 15.192 , Damaged Length 0.012 KM

04-06-2026

Provisions (प्रावधानों की सूची)

1- Cement plum Masonry with 40% plum & 60% 1:3:6 cement concrete. 2- Providing and Laying of Mechanically Woven Double Twisted Hexagonal shaped Gabions of galvanized steel, of size 3mX1mX1m. 3- Random Rubble Stone Masonry laid Dry. 4- Hand Packed stone filling in back of walls.

Remark: Required Reconstruction of R/wall

₹ 2.19 Lakh
Estimation Done
Fund:Unknown
Spot #11 - ID:7548 , Near Tyada Tok, Chainage 15.900 - 15.915 , Damaged Length 0.015 KM

04-06-2026

Provisions (प्रावधानों की सूची)

1- Cement plum Masonry with 40% plum & 60% 1:3:6 cement concrete. 2- Providing and Laying of Mechanically Woven Double Twisted Hexagonal shaped Gabions of galvanized steel, of size 3mX1mX1m. 3- Random Rubble Stone Masonry laid Dry. 4- Hand Packed stone filling in back of walls.

Remark: Required reconstruction of R/wall

₹ 2.61 Lakh
Estimation Done
Fund:Unknown
Spot #12 - ID:8129 , Tyade Tok, Chainage 16.100 - 16.109 , Damaged Length 0.009 KM

04-06-2026

Provisions (प्रावधानों की सूची)

1- Providing and Laying of Mechanically Woven Double Twisted Hexagonal shaped Gabions of galvanized steel, of size 3mX1mX1m. 2- Random Rubble Stone Masonry laid Dry. 3- Hand Packed stone filling in back of walls. 4- Cement plum Masonry with 40% plum & 60% 1:3:6 cement concrete

Remark: reconstruction of R/wall

₹ 1.97 Lakh
Estimation Done
Fund:Unknown
Spot #13 - ID:8127 , Kheda village, Chainage 14.100 - 14.109 , Damaged Length 0.009 KM

09-07-2026

Provisions (प्रावधानों की सूची)

1- Providing and Laying of Mechanically Woven Double Twisted Hexagonal shaped Gabions of galvanized steel, of size 3mX1mX1m. 2- Random Rubble Stone Masonry laid Dry. 3- Hand Packed stone filling in back of walls. 4- Cement plum Masonry with 40% plum & 60% 1:3:6 cement concrete.

Remark: required reconstruction of R/wall

₹ 2.02 Lakh
Estimation Done
Fund:Unknown
Spot #14 - ID:8128 , kheda Village, Chainage 13.050 - 13.068 , Damaged Length 0.018 KM

09-07-2026

Provisions (प्रावधानों की सूची)

1- Providing and Laying of Mechanically Woven Double Twisted Hexagonal shaped Gabions of galvanized steel, of size 3mX1mX1m. 2- Random Rubble Stone Masonry laid Dry. 3- Hand Packed stone filling in back of walls.

Remark: required reconstruction of r/wall

₹ 1.83 Lakh
Estimation Done
Fund:Unknown
Spot #15 - ID:8130 , near Kheda village, Chainage 13.450 - 13.465 , Damaged Length 0.015 KM

09-07-2026

Provisions (प्रावधानों की सूची)

1- Providing and Laying of Mechanically Woven Double Twisted Hexagonal shaped Gabions of galvanized steel, of size 3mX1mX1m. 2- Random Rubble Stone Masonry laid Dry. 3- Hand Packed stone filling in back of walls.

Remark: reconstruction of r/wall (Corrected Chainage is 12.450 to 12.465)

₹ 1.53 Lakh
Estimation Done
Fund:Unknown

All Damage Spots

ID Date Location Cost (₹ Lakh) Chainages Status Yojana
630 16-06-2025 Kheda 3.63 12.900 to 12.915 0.014999999999999 Sanctioned SDRF
627 29-06-2025 Pab 2.50 3.700 to 3.720 0.02 Estimation Done SDRF
628 29-06-2025 Jedwar 3.00 6.100 to 6.115 0.015000000000001 Estimation Done SDRF
629 30-06-2025 jedwar 3.10 6.900 to 6.915 0.015 Estimation Done SDRF
712 30-06-2025 jedwar 4.80 9.100 to 9.130 0.030000000000001 Estimation Done SDMF
3413 11-07-2025 KHEDA 0.97 15.200 to 15.215 0.015000000000001 Estimation Done SRMD
5120 12-09-2025 PAB 6.00 3.420 to 3.435 0.015 Identified Not Decided
5121 12-09-2025 kHEDA 1.50 14.960 to 14.975 0.014999999999999 Estimation Done SRMD
5123 12-09-2025 kHEDA 0.97 15.450 to 15.465 0.015000000000001 Estimation Done SRMD
7530 04-06-2026 Near Kheda village 2.19 15.180 to 15.192 0.012 Estimation Done SDRF
7548 04-06-2026 Near Tyada Tok 2.61 15.900 to 15.915 0.014999999999999 Estimation Done SDRF
8129 04-06-2026 Tyade Tok 1.97 16.100 to 16.109 0.0090000000000003 Estimation Done SDRF
8127 09-07-2026 Kheda village 2.02 14.100 to 14.109 0.0090000000000003 Estimation Done SDRF
8128 09-07-2026 kheda Village 1.83 13.050 to 13.068 0.017999999999999 Estimation Done SDRF
8130 09-07-2026 near Kheda village 1.53 13.450 to 13.465 0.015000000000001 Estimation Done SDRF