Infrastructure Damage Report : पाटीसैण तछवाड एकेश्वर मोटर मार्ग

4998 - नि0ख0 पाबौ - Pauri

5

Total Damage Spots

₹ 24.14 Lakhs

Total Estimated Cost

1

Completed

4

Pending

Status Wise Distribution
Cost Analysis
पाटीसैण तछवाड एकेश्वर मोटर मार्ग DivSegmentID:4998 Closure Report Closure Images

EE Office: नि0ख0 पाबौ

District: Pauri

Segment ID: 3445, EE Segment ID: 4998

Pics Count: 6

Damage Spots Details
Spot #1 - ID:1604 , JATOLI, Chainage 10.400 - 10.410 , Damaged Length 0.01 KM

22-08-2025

Provisions (प्रावधानों की सूची)
  1. EXAVATION
  2. RR DRY
  3. HP FILLING

Remark: कार्य पूर्ण।

₹ 1.40 Lakh
Completed
Fund:Unknown
Spot #2 - ID:6621 , Sakinda village, Chainage 5.800 - 5.900 , Damaged Length 0.1 KM

11-07-2026

Provisions (प्रावधानों की सूची)
  1. EXAVATION
  2. RR DRY
  3. plum
  4. RR STONE MASONARY 1:6
  5. HP FILLING

Remark: DUE TO HEAVY RAINFALL THE RETAINING WALL BUILT BEHIND THE HOUSE HAS COLLAPSED BECAUSE OF THIS THE HOUSE HAS BECOME UNSAFE AND CRACKS HAVE DEVELOPED IN IT , SO IT IS VERY NECESSARY TO RECONTRUCT THE RETAINING WALL.

₹ 7.08 Lakh
Estimation Done
Fund:Unknown
Spot #3 - ID:8007 , sakida, Chainage 5.800 - 5.950 , Damaged Length 0.15 KM

11-07-2026

Provisions (प्रावधानों की सूची)

EXCAVATION RR DRY HP STONE FILLING 1:6 stone masonary plum

Remark: due to heavy rainfall the retaining wall has collapsed and its recontruction is urgently required. There is a house located below which may be risk of damage.

₹ 6.65 Lakh
Estimation Done
Fund:Unknown
Spot #4 - ID:8006 , patisian, Chainage 0.600 - 0.625 , Damaged Length 0.025 KM

16-07-2026

Provisions (प्रावधानों की सूची)

EXCAVATION RR DRY HP STONE FILLING 1:6 stone masonary

Remark: due to heavy rainfall the retaining wall has collapsed . it is extremely urgent that the wall is reconstructed there is also a school situated above it which may be at risk of damage in the future if the wall is not repaired promptly

₹ 2.77 Lakh
Estimation Done
Fund:Unknown
Spot #5 - ID:8794 , PATISIAN, Chainage 0.200 - 0.400 , Damaged Length 0.2 KM

11-09-2026

Provisions (प्रावधानों की सूची)
  1. excavation 2.Gabions 3.RR Dry 4.HPS filling

Remark: DUE TO HEAVY RAINFALL RETAINING WALL HAVE BEEN DAMAGED AND ROAD HAD SINK DOWN FROM OUTER PORTION WHICH CREATE DIFFICULTY TO MOVING VEHICLE AND ALSO BECAME DANGER FOR LOCAL PEOPLES SO IT IS VERY NECCASSARY TO RECONSTRUCT WALL AS SOON AS

₹ 6.24 Lakh
Estimation Done
Fund:Unknown

All Damage Spots

ID Date Location Cost (₹ Lakh) Chainages Status Yojana
1604 22-08-2025 JATOLI 1.40 10.400 to 10.410 0.0099999999999998 Completed SDRF
6621 11-07-2026 Sakinda village 7.08 5.800 to 5.900 0.1 Estimation Done SDRF
8007 11-07-2026 sakida 6.65 5.800 to 5.950 0.15 Estimation Done SDRF
8006 16-07-2026 patisian 2.77 0.600 to 0.625 0.025 Estimation Done SDRF
8794 11-09-2026 PATISIAN 6.24 0.200 to 0.400 0.2 Estimation Done SDMF