Infrastructure Damage Report : लम्बगांव मोटना रजाखेत घनसाली सेन्दुल राज्य मार्ग

5496 - प्रान्तीय खण्ड नई टिहरी - Tehri

11

Total Damage Spots

₹ 140.17 Lakhs

Total Estimated Cost

0

Completed

11

Pending

Status Wise Distribution
Cost Analysis
लम्बगांव मोटना रजाखेत घनसाली सेन्दुल राज्य मार्ग DivSegmentID:5496 Closure Report Closure Images

EE Office: प्रान्तीय खण्ड नई टिहरी

District: Tehri

Segment ID: 61, EE Segment ID: 5496

Pics Count: 19

Damage Spots Details
Spot #1 - ID:2888 , Mayunda, Chainage 50.300 - 50.310 , Damaged Length 0.01 KM

03-07-2025

Provisions (प्रावधानों की सूची)

1- Random Rubble Masonary laid dry in R/wall

Remark: Existing R/wall is damaged causing danger to road safety, hence re- construction of R/Wall is required to ensure road safety and also to prevent further damage to road formation.

₹ 1.00 Lakh
Identified
Fund:Unknown
Spot #2 - ID:2916 , Munda, Chainage 51.550 - 51.560 , Damaged Length 0.01 KM

03-07-2025

Provisions (प्रावधानों की सूची)

Random Rubble Masonary laid dry in retaining wall,

Remark: NA

₹ 1.50 Lakh
Identified
Fund:Unknown
Spot #3 - ID:3750 , sarpul, Chainage 56.100 - 56.120 , Damaged Length 0.02 KM

03-07-2025

Provisions (प्रावधानों की सूची)

Banded R/wall

Remark: NA

₹ 5.00 Lakh
Identified
Fund:Unknown
Spot #4 - ID:3757 , sarpul, Chainage 56.300 - 56.315 , Damaged Length 0.015 KM

03-07-2025

Provisions (प्रावधानों की सूची)

Bended R/wall

Remark: NA

₹ 3.50 Lakh
Identified
Fund:Unknown
Spot #5 - ID:386 , Motna, Chainage 16.600 - 16.625 , Damaged Length 0.025 KM

14-08-2025

Provisions (प्रावधानों की सूची)

1-R Wall with plum concrete,R R 1:6,also hill side cutting in inner side.

Remark: R wall damaged.road washout.and continued land slide occur

₹ 15.00 Lakh
Identified
Fund:Unknown
Spot #6 - ID:3735 , meyunda, Chainage 54.400 - 54.425 , Damaged Length 0.025 KM

14-08-2025

Provisions (प्रावधानों की सूची)

RR banded wall

Remark: Due to heavy rains during current Monsoon existing R/Wall has been damaged and available road formation width currently is only around 1.500-2.00 Mtr. Since the hill slope in valley side is comprised of very soft soil and would not sustain long without retaining structure, Re-Construction of R/Wall is very essential for safe and uninterrupted plying of traffic.

₹ 4.00 Lakh
Identified
Fund:Unknown
Spot #7 - ID:3742 , pipola, Chainage 53.900 - 53.915 , Damaged Length 0.015 KM

14-08-2025

Provisions (प्रावधानों की सूची)

Gabions/ RR dry

Remark: Road formation has been sunk due to settlement of hill slope. Gabions are needs to be placed at multiple locations to protect further settlement of hill slope.

₹ 4.00 Lakh
Identified
Fund:Unknown
Spot #8 - ID:1675 , Motna, Chainage 16.500 - 16.560 , Damaged Length 0.06 KM

15-08-2025

Provisions (प्रावधानों की सूची)

1.plum concrete work. 2.retaining wall RR1:6 3.stone filling

Remark: NA

₹ 59.17 Lakh
Identified
Fund:Unknown
Spot #9 - ID:1755 , motna, Chainage 16.500

15-08-2025

Provisions (प्रावधानों की सूची)

1-R.R. Stone masonary in 1:6 2-Plum concrete

Remark: 1-Huge land slide and road wash out 2-R.wall washout

₹ 0.00 Lakh
Identified
Fund:Unknown
Spot #10 - ID:16 , 700m before motna village, Chainage 15.500 - 15.530 , Damaged Length 0.03 KM

18-08-2025

Provisions (प्रावधानों की सूची)
  1. Breast wall 20 m long needs to be repaired
  2. 25X7m retaining wall needs to be constructed.
  3. 30 m surfacing needed.

Remark: NA

₹ 35.00 Lakh
Identified
Fund:Unknown
Spot #11 - ID:17 , meyunda, Chainage 54.00 - 54.050 , Damaged Length 0.05 KM

18-08-2025

Provisions (प्रावधानों की सूची)
  1. 14X5m retaining wall needs to be constructed.

Remark: Due to heavy rains during current Monsoon existing R/Wall has been damaged and available road formation width currently is only around 1.500-2.00 Mtr. Since the hill slope in valley side is comprised of very soft soil and would not sustain long without retaining structure, Re-Construction of R/Wall is very essential for safe and uninterrupted plying of traffic.

₹ 12.00 Lakh
Identified
Fund:Unknown

All Damage Spots

ID Date Location Cost (₹ Lakh) Chainages Status Yojana
2888 03-07-2025 Mayunda 1.00 50.300 to 50.310 0.010000000000005 Identified Not Decided
2916 03-07-2025 Munda 1.50 51.550 to 51.560 0.010000000000005 Identified Not Decided
3750 03-07-2025 sarpul 5.00 56.100 to 56.120 0.019999999999996 Identified Not Decided
3757 03-07-2025 sarpul 3.50 56.300 to 56.315 0.015000000000001 Identified Not Decided
386 14-08-2025 Motna 15.00 16.600 to 16.625 0.024999999999999 Identified Not Decided
3735 14-08-2025 meyunda 4.00 54.400 to 54.425 0.024999999999999 Identified Not Decided
3742 14-08-2025 pipola 4.00 53.900 to 53.915 0.015000000000001 Identified Not Decided
1675 15-08-2025 Motna 59.17 16.500 to 16.560 0.059999999999999 Identified Not Decided
1755 15-08-2025 motna 0.00 Identified Not Decided
16 18-08-2025 700m before motna village 35.00 15.500 to 15.530 0.029999999999999 Identified Not Decided
17 18-08-2025 meyunda 12.00 54.00 to 54.050 0.049999999999997 Identified SDRF