Infrastructure Damage Report : चिमटाखाल भौनखाल भतरौजखान मोटर मार्ग

69 - प्रान्तीय खण्ड रानीखेत - Almora

12

Total Damage Spots

₹ 28.02 Lakhs

Total Estimated Cost

0

Completed

12

Pending

Status Wise Distribution
Cost Analysis
चिमटाखाल भौनखाल भतरौजखान मोटर मार्ग DivSegmentID:69 Closure Report Closure Images

EE Office: प्रान्तीय खण्ड रानीखेत

District: Almora

Segment ID: 246, EE Segment ID: 69

Pics Count: 20

Damage Spots Details
Spot #1 - ID:27 , CBB-69-KM 16 Causeway, Chainage 15.200 - 15.225 , Damaged Length 0.025 KM

23-06-2025

Provisions (प्रावधानों की सूची)

R/Wall damaged and washed out Length 25 m Height 9 m Portion of Causeway Washed out width 7 m

Remark: .

₹ 11.00 Lakh
Identified
Fund:Unknown
Spot #2 - ID:204 , CBB-69- KM 2 HM 4-6 / Chimtakhal, Chainage 1.450 - 1.455 , Damaged Length 0.005 KM

06-08-2025

Provisions (प्रावधानों की सूची)

Rwall damaged LxH= 6x4.5 m

  1. Excavation: 18.9 cum @400.8 = 7575.12
  2. RR DRY : 18.71 cum @2157.2 = 40361.212
  3. RR (1:6) : 7.2 cum @1039 = 7480.8
  4. HP Filling : 7.2 cum @1039 = 7480.8
  5. Total : 124651.03 +18% GST (22437.19) = 147088.22

Remark: .

₹ 1.47 Lakh
Identified
Fund:Unknown
Spot #3 - ID:29 , CBB-69-KM 18 HM 8-10 Vill. Ajoli, Chainage 17.800 - 17.813 , Damaged Length 0.013 KM

07-08-2025

Provisions (प्रावधानों की सूची)

R Wall Damaged L 13 m H 5 m Parapet Damaged

Detail of Measurement S.No. Particular (item of work) No Length Width H/D Quantity Unit 1 Mis 1-2 Excavation in foundation for retaining, breast walls etc, in all types of soils and rocks including all lead, lift and disposal of surplus material as per direction of engineer - in - charge, as per drawing and technical specifications Clause 305.1 of MORD Specifiction KM 18 HM 8-10 R/wall 1 X 1/3 13.00 2.27 5.00 49.18

							Total	49.18	cum

2 Mis 1-3 Random Rubble Stone Masonry laid Dry, in breast walls, retaining walls, etc. including supply of all material, labour, T&P and royaltiies etc. complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 of MORD Specifiction KM 18 HM 8-10 R/wall 1 X 5 1.88 (0.8+2.07)/2 3.80 51.26 Total 51.26 cum

3 Mis 1-4 Random Rubble Stone Masonry laid in 1:6 cement and sand mortar, in breast walls, retaining walls, parapets, scuppers, etc. including supply of all material, labour, T&P and royaltiies etc. complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 of MORD Specifiction KM 18 HM 8-10 R/wall 1 X 1 13.00 (0.6+2.27)/2 5.00 93.28 (- RR DRY) -51.26 Net 42.02

							Total	42.02	

4 Mis 1-5 Hand Packed stone filling in back of wallls including cost of all materials,royality, T&P etc. complete as per direction of Engineer-in- charge. (As per PWD Uttarakhand specifications) KM 18 HM 8-10 R/wall 1 X 1 13.00 (0+0.6)/2 4.50 17.55 Total 17.55 cum

Plum Parapet cost Rs 6602

Remark: .

₹ 3.75 Lakh
Identified
Fund:Unknown
Spot #4 - ID:206 , CBB-69-KM 4 HM 2-4, Chainage 3.260 - 3.262 , Damaged Length 0.002 KM

11-08-2025

Provisions (प्रावधानों की सूची)

Rwall damaged LxH= 3x6.00 m

  1. Excavation: 12.83 cum @400.8 = 5142.264
  2. RR DRY : 10.21 cum @3902.7 = 39846.567
  3. RR (1:6) : 3.6 cum @1039 = 3740.4
  4. HP Filling : 3.6 cum @1039 = 3740.4
  5. Toe Plum : 6.75 cum @4096.7 = 27652.725
  6. Total : 93682.7 +18% GST (16862.89) = 110545.59

Remark: .

₹ 1.11 Lakh
Identified
Fund:Unknown
Spot #5 - ID:211 , CBB-69-KM 27 HM 2-4 /Chaurighatti, Chainage 26.300 - 26.301 , Damaged Length 0.001 KM

21-08-2025

Provisions (प्रावधानों की सूची)

scupper slab damaged

Remark: .

₹ 1.00 Lakh
Identified
Fund:Unknown
Spot #6 - ID:460 , 9720 / Kath ki Nao KM 1 HM 4-6, Chainage 0.410 - 0.416 , Damaged Length 0.006 KM

21-08-2025

Provisions (प्रावधानों की सूची)

R/wall LxH=5.50 m x 3.00 m

Remark: The road is Kath ki Nao to Ajolitalli VR (9720) Estimate has been forwarded via eDPR No. 7457 dated 23.09.2025

₹ 0.56 Lakh
Estimation Done
Fund:Unknown
Spot #7 - ID:208 , CBB-69-KM 9 HM 4-6, Chainage 8.550 - 8.555 , Damaged Length 0.005 KM

22-08-2025

Provisions (प्रावधानों की सूची)

Rwall damaged LxH= 6x3.00 m

  1. Excavation: 9.6 cum @400.8 = 3847.68
  2. RR DRY : 19.8 cum @2157.2 = 42712.56
  3. HP Filling : 5.04 cum @1039 = 5236.56
  4. Total : 51796.8 +18% GST (9323.424) = 61120.224

Remark: .

₹ 0.61 Lakh
Identified
Fund:Unknown
Spot #8 - ID:209 , CBB-69-KM 9 HM 6-8, Chainage 8.750 - 8.755 , Damaged Length 0.005 KM

22-08-2025

Provisions (प्रावधानों की सूची)

Rwall damaged LxH= 6 x 5.50 m scupper damaged

  1. Excavation: 26.73 cum @400.8 = 10713.384
  2. RR DRY : 27.36 cum @2157.2 = 59020.992
  3. RR (1:6) : 9 cum @1039 = 9351
  4. HP Filling : 9 cum @1039 = 9351
  5. Total : 167442.504 +18% GST (30139.65) = 197582.15

Remark: .

₹ 1.98 Lakh
Identified
Fund:Unknown
Spot #9 - ID:1007 , 69-KM 21 / Harda, Chainage 20.100 - 20.116 , Damaged Length 0.016 KM

28-08-2025

Provisions (प्रावधानों की सूची)

Landslide @16 m Length

Remark: The landslide has occurred on the hill side of the road, due to which the buildings are at risk.

₹ 5.00 Lakh
Identified
Fund:Unknown
Spot #10 - ID:4671 , 69- CBB - KM 25 HM 4-6 Tolyo, Chainage 24.660 - 24.662 , Damaged Length 0.002 KM

12-09-2025

Provisions (प्रावधानों की सूची)

Rwall damage 2m by 2m

Detail of Measurement S.No. Particular (item of work) No Length Width H/D Quantity Unit 1 Mis 1-2 Excavation in foundation for retaining, breast walls etc, in all types of soils and rocks including all lead, lift and disposal of surplus material as per direction of engineer - in - charge, as per drawing and technical specifications Clause 305.1 of MORD Specifiction KM 25 HM 4-6 R/wall 1 X 1/3 2.00 1.27 2.00 1.69

							Total	1.69	cum

2 Mis 1-3 Random Rubble Stone Masonry laid Dry, in breast walls, retaining walls, etc. including supply of all material, labour, T&P and royaltiies etc. complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 of MORD Specifiction KM 25 HM 4-6 R/wall 1 X 1 2.00 (0.6+1.27)/2 2.00 3.74 Total 3.74 cum

3 Mis 1-5 Hand Packed stone filling in back of wallls including cost of all materials,royality, T&P etc. complete as per direction of Engineer-in- charge. (As per PWD Uttarakhand specifications) KM 25 HM 4-6 R/wall 1 X 1 2.00 (0+0.6)/2 1.80 1.08 Total 1.08 cum

Remark: .

₹ 0.12 Lakh
Identified
Fund:Unknown
Spot #11 - ID:6968 , 69/ CBB - KM 3 HM 4-6 / Chimtakhal 2307, Chainage 2.540 - 2.547 , Damaged Length 0.007 KM

30-07-2026

Provisions (प्रावधानों की सूची)

Retaining Wall below Causeway damaged: 7 m x 3 m

  1. Excavation: 11.2 cum @400.8 = 4488.96
  2. RR DRY : 23.1 cum @2157.2 = 49831.32
  3. HP Filling : 5.88 cum @1039 = 6109.32
  4. Total : 60429.6 +18% GST (10877.328) = 71306.93

Details of Measurement 1 Mis 1-2 Excavation in foundation for retaining, breast walls etc, in all types of soils and rocks including all lead, lift and disposal of surplus material as per direction of engineer - in - charge, as per drawing and technical specifications Clause 305.1 of MORD Specifiction KM 3 HM 2-4 R/wall 1 X 1/3 7.00 1.60 3.00 11.20

							Total	11.20	cum

2 Mis 1-3 Random Rubble Stone Masonry laid Dry, in breast walls, retaining walls, etc. including supply of all material, labour, T&P and royaltiies etc. complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 of MORD Specifiction KM 3 HM 2-4 R/wall 1 X 1 7.00 (0.6+1.6)/2 3.00 23.10 Total 23.10 cum 3 Mis 1-5 Hand Packed stone filling in back of wallls including cost of all materials,royality, T&P etc. complete as per direction of Engineer-in- charge. (As per PWD Uttarakhand specifications) KM 3 HM 2-4 R/wall 1 X 1 7.00 (0+0.6)/2 2.80 5.88 Total 5.88 cum

Remark: .

₹ 0.72 Lakh
Estimation Done
Fund:Unknown
Spot #12 - ID:8675 , 69/ CBB - KM 12 HM 8-10 / Chimtakhal 2307, Chainage 11.950

20-09-2026

Provisions (प्रावधानों की सूची)

Breast Wall damage

Remark: .

₹ 0.70 Lakh
Identified
Fund:Unknown

All Damage Spots

ID Date Location Cost (₹ Lakh) Chainages Status Yojana
27 23-06-2025 CBB-69-KM 16 Causeway 11.00 15.200 to 15.225 0.025 Identified Not Decided
204 06-08-2025 CBB-69- KM 2 HM 4-6 / Chimtakhal 1.47 1.450 to 1.455 0.0050000000000001 Identified Not Decided
29 07-08-2025 CBB-69-KM 18 HM 8-10 Vill. Ajoli 3.75 17.800 to 17.813 0.012999999999998 Identified Not Decided
206 11-08-2025 CBB-69-KM 4 HM 2-4 1.11 3.260 to 3.262 0.0020000000000002 Identified Not Decided
211 21-08-2025 CBB-69-KM 27 HM 2-4 /Chaurighatti 1.00 26.300 to 26.301 0.00099999999999767 Identified Not Decided
460 21-08-2025 9720 / Kath ki Nao KM 1 HM 4-6 0.56 0.410 to 0.416 0.006 Estimation Done SRMD
208 22-08-2025 CBB-69-KM 9 HM 4-6 0.61 8.550 to 8.555 0.004999999999999 Identified Not Decided
209 22-08-2025 CBB-69-KM 9 HM 6-8 1.98 8.750 to 8.755 0.0050000000000008 Identified Not Decided
1007 28-08-2025 69-KM 21 / Harda 5.00 20.100 to 20.116 0.015999999999998 Identified Not Decided
4671 12-09-2025 69- CBB - KM 25 HM 4-6 Tolyo 0.12 24.660 to 24.662 0.0019999999999989 Identified Not Decided
6968 30-07-2026 69/ CBB - KM 3 HM 4-6 / Chimtakhal 2307 0.72 2.540 to 2.547 0.0070000000000001 Estimation Done Not Decided
8675 20-09-2026 69/ CBB - KM 12 HM 8-10 / Chimtakhal 2307 0.70 Identified Not Decided