6983 - प्रान्तीय खण्ड रानीखेत - Almora
Total Damage Spots
Total Estimated Cost
Completed
Pending
EE Office: प्रान्तीय खण्ड रानीखेत
District: Almora
Segment ID: 6851, EE Segment ID: 6983
Pics Count: 69
09-07-2025
RWALL LxH=14 m x 10 m
Remark: Estimate has been forwarded via eDPR No. 6655 dated 28.08.2025 विभागाध्यक्ष कार्यालय के पत्रांक 5029/26 बजट (बाढ़ एवं भूस्खलन)/2025-26 दिनांक 18.03.2026 द्वारा स्वीकृत।
15-07-2025
Retaining wall damaged 18 × 4 m
Remark: .
07-08-2025
Retaining Wall 6×3
Remark: .
12-08-2025
Retaining wall damaged 12 × 3 m
Remark: .
12-08-2025
Retaining wall damaged 7 × 4 m
Remark: .
15-08-2025
Retaining Wall 12×4
Remark: .
29-08-2025
Rwall 5 m x 6.5 m
Remark: Estimation done under NON SDRF
30-08-2025
R Wall Damage 10.5m* 3.70 m
Remark: .
30-08-2025
RWALL DAMAGE 6.70 m x 5.00 m
Remark: .
30-08-2025
Rwall 9.00 m x 2.5 m
Remark: .
30-08-2025
RWALL DAMAGE 10.50 m x 3.70 m
Remark: .
31-08-2025
RWALL 8 m x 5 m
Remark: Estimate has been forwarded via eDPR No. 5411 dated 23.09.2025
31-08-2025
Causeway Surface Damaged 4m x 2.5 m
Remark: Estimate has been forwarded via eDPR No. 5411 dated 23.09.2025
31-08-2025
Bwall washed out.
To safeguard hill side: Plum 2 x 21 m x 1.5 m x 1.5 m Gabion 2 x 7 (3 mx 1 m x 1 m)
Needed
Remark: Road width is reduced. Estimate has been forwarded via eDPR No. 5411 dated 23.09.2025
31-08-2025
RWALL 6.80 m x 4.5 m
Remark: Estimate has been forwarded via eDPR No. 5411 dated 23.09.2025
31-08-2025
RWALL 6.50 m x 3.5 m
Remark: Estimate has been forwarded via eDPR No. 5411 dated 23.09.2025
31-08-2025
RWALL 6.50 m x 3.8 m
Remark: Estimate has been forwarded via eDPR No. 5411 dated 23.09.2025
31-08-2025
RWALL 4.50 m x 1.5 m
Remark: Estimate has been forwarded via eDPR No. 5411 dated 23.09.2025
31-08-2025
RWALL 6.1 m x 4.5 m
Remark: Estimate has been forwarded via eDPR No. 5411 dated 23.09.2025
31-08-2025
RWALL 4.5 m x 2.9 m
Remark: Estimate has been forwarded via eDPR No. 5411 dated 23.09.2025
31-08-2025
Retaining Wall 7.5 m x 2.00 m
Remark: Estimate has been forwarded via eDPR No. 5411 dated 23.09.2025
31-08-2025
Retaining Wall 6.5 m x 4.5 m
Remark: Estimate has been forwarded via eDPR No. 5411 dated 23.09.2025
31-08-2025
Retaining Wall 10.5 m x 7.5 m
Remark: Estimate has been forwarded via eDPR No. 5411 dated 23.09.2025
31-08-2025
Retaining Wall 19.5 m x 7.5 m
Remark: Estimate has been forwarded via eDPR No. 5411 dated 23.09.2025 The retaining wall has been further damaged due to rainfall on 15 th July 2026
03-09-2025
Edge settlement (L-10.00 mtr, H-1.50 mtr) Reconstruction of RR Dry wall
Remark: Actual Km of road is 39
07-09-2025
Reconstruction of New RCC Bridge required. For Road opening for traffic Restoration work of cost 30.00 lac (approx.) is required.
Remark: Entered wrong data in road by mistake
09-09-2025
R/Wall damaged (L-15.00 mtr, H-6.00 mtr) Reconstruction of damaged R/wall with toe wall RR 1:6 & banded wall.
Remark: Actual km of road is 47.00
09-09-2025
R/Wall damaged (L-40.00 mtr, H-2.50 mtr) Reconstruction of RR Dry wall
Remark: Actual km of road is 42
12-09-2025
Rwall damage 6m by 7m
Remark: Estimate has been forwarded via eDPR No. 5411 dated 23.09.2025
15-09-2025
Rwall damage 5m by 4m
Remark: Estimate has been forwarded via eDPR No. 5411 dated 23.09.2025
22-09-2025
RWall 10 m x 5.50 m
KM 86 HM 2-4
Detail of Measurement S.No. Particular (item of work) No Length Width H/D Quantity Unit 1 Mis 1-2 Excavation in foundation for retaining, breast walls etc, in all types of soils and rocks including all lead, lift and disposal of surplus material as per direction of engineer - in - charge, as per drawing and technical specifications Clause 305.1 of MORD Specifiction KM 86 HM 2-4 R/wall 1 X 1/3 10.00 2.43 5.50 44.55
Total 44.55 cum
2 Mis 1-3 Random Rubble Stone Masonry laid Dry, in breast walls, retaining walls, etc. including supply of all material, labour, T&P and royaltiies etc. complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 of MORD Specifiction KM 86 HM 2-4 R/wall 1 X 3 2.53 (0.8+2.23)/2 4.30 49.45 Total 49.45 cum
3 Mis 1-4 Random Rubble Stone Masonry laid in 1:6 cement and sand mortar, in breast walls, retaining walls, parapets, scuppers, etc. including supply of all material, labour, T&P and royaltiies etc. complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 of MORD Specifiction KM 86 HM 2-4 R/wall 1 X 1 10.00 (0.6+2.43)/2 5.50 83.33 (- RR DRY) -49.45 Net 33.88
Total 33.88 cum
4 Mis 1-5 Hand Packed stone filling in back of wallls including cost of all materials,royality, T&P etc. complete as per direction of Engineer-in- charge. (As per PWD Uttarakhand specifications) KM 86 HM 2-4 R/wall 1 X 1 10.00 (0+0.6)/2 5.00 15.00 Total 15.00 cum
Remark: .
29-09-2025
R/Wall Damage 7.50 m x 6.00 m
Remark: Event date is 29.08.2025. its not updating
29-09-2025
R/Wall Damage 5.50 m x 4.50 m
Remark: Event date is 29.08.2025 its not updating.
01-07-2026
Retaining wall damage 12 m x 8 m
S.N Particular (item of work) No Length Width H/D Quantity Unit 1 Excavation in foundation for retaining, breast walls etc, in all types of soils and rocks including all lead, lift and disposal of surplus material as per direction of engineer - in - charge, as per drawing and technical specifications Clause 305.1 of MORD Specifiction KM 83 HM 4-6 R/wall 1 X 1/3 12.00 2.27 5.00 45.40 KM 83 HM 4-6 Plum 2 X 1/2 7.00 1.50 1.50 15.75
Total 61.15 cum
2 Random Rubble Stone Masonry laid Dry, in breast walls, retaining walls, etc. including supply of all material, labour, T&P and royaltiies etc. complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 of MORD Specifiction KM 83 HM 4-6 R/wall 1 X 4 2.25 (0.8+2.07)/2 3.80 49.08
Total 49.08 cum
3 Random Rubble Stone Masonry laid in 1:6 cement and sand mortar, in breast walls, retaining walls, parapets, scuppers, etc. including supply of all material, labour, T&P and royaltiies etc. complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 of MORD Specifiction KM 83 HM 4-6 R/wall 1 X 1 12.00 (0.6+2.27)/2 5.00 86.10 (- RR DRY) -49.08 Net 37.02 Total 37.02 cum 4 Hand Packed stone filling in back of wallls including cost of all materials,royality, T&P etc. complete as per direction of Engineer-in- charge. (As per PWD Uttarakhand specifications) KM 83 HM 4-6 R/wall 1 X 1 12.00 (0+0.6)/2 4.50 16.20 Total 16.20 cum 5 Cement plum Masonry with 40% plum & 60% 1:3:6 cement concrete including supply of all material, labour, T&P etc. required for proper completion of the work. as per drawings and technical specifications Clause 802, 803, 1202 & 1203 of MORD Specifiction KM 83 HM 4-6 Plum 2 X 1 7.00 1.50 1.50 31.50
Total 31.50 cum
Remark: Retaining Wall damaged. Estimation Done in SDRF
15-07-2026
Culvert Abutment Wall Damaged
DOM S.N Particular (item of work) No Length Width H/D Quantity Unit 1 Excavation in foundation for retaining, breast walls etc, in all types of soils and rocks including all lead, lift and disposal of surplus material as per direction of engineer - in - charge, as per drawing and technical specifications Clause 305.1 of MORD Specifiction KM 95 HM 8-10 A/wall 1 X 1/3 2.00 0.50 0.50 0.17 KM 95 HM 8-10 Toe Wall 2 X 1/2 5.20 1.30 2.00 13.52
Total 13.69 cum
2 Random Rubble Stone Masonry laid in 1:6 cement and sand mortar, in breast walls, retaining walls, parapets, scuppers, etc. including supply of all material, labour, T&P and royaltiies etc. complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 of MORD Specifiction KM 95 HM 8-10 Toe Wall 1 X 1 5.20 (0.6+1.4)/2 2.20 11.44 KM 95 HM 8-10 A/wall 1 X 2 2.00 (0.6+1.3)/2 2.00 7.60
Total 19.04 cum
3 Random Rubble Stone Masonry laid Dry, in breast walls, retaining walls, etc. including supply of all material, labour, T&P and royaltiies etc. complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 of MORD Specifiction KM 95 HM 8-10 Kharanja 1 X 1 4.20 (4.2+2)/2 1.00 6.51
Total 6.51 cum
4 Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 P.C.C grade M 10 Nominal mix 1:3:6 KM 95 HM 8-10 M10 Base 1 X 1 4.40 2.00 0.20 1.76
Total 1.76 cum
5 Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications PCC Grade M25 using batching plant transit mixer & manual placing KM 95 HM 8-10 M10 Base 1 X 1 1.00 2.00 0.04 0.08
Total 0.08 cum
6 Hand Packed stone filling in back of wallls including cost of all materials,royality, T&P etc. complete as per direction of Engineer-in- charge. (As per PWD Uttarakhand specifications) KM 95 HM 8-10 A/wall 1 X 1 2.00 (0+0.6)/2 2.00 1.20 Total 1.20 cum
BOQ
S.N. Particular Quantity Unit Rate Per Amount 1 Excavation in foundation for retaining, breast walls etc, in all types of soils and rocks including all lead, lift and disposal of surplus material as per direction of engineer - in - charge, as per drawing and technical specifications Clause 305.1 of MORD Specifiction 13.69 Cum 2 Random Rubble Stone Masonry laid in 1:6 cement and sand mortar, in breast walls, retaining walls, parapets, scuppers, etc. including supply of all material, labour, T&P and royaltiies etc. complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 of MORD Specifiction 19.04 Cum 3902.70 Cum 74307.41 3 Random Rubble Stone Masonry laid Dry, in breast walls, retaining walls, etc. including supply of all material, labour, T&P and royaltiies etc. complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 of MORD Specifiction 6.51 Cum 2157.20 Cum 14043.37 4 Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 P.C.C grade M 10 Nominal mix 1:3:6 1.76 Cum 5977.40 Cum 10520.22 5 Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications PCC Grade M25 using batching plant transit mixer & manual placing 0.08 Cum 9132.00 Cum 730.56 6 Hand Packed stone filling in back of wallls including cost of all materials,royality, T&P etc. complete as per direction of Engineer-in- charge. (As per PWD Uttarakhand specifications) 1.20 Cum 1039.00 Cum 1246.80 Total- 106334.59
Add 18 % GST 19140.21 Total in Figures 125474.72 Say in Lacs 1.25
Remark: Estimation done in NON SDRF via 1958/4C Dated 08.09.2026
15-07-2026
Retaining Wall Damaged: Length 5 m Height: 4.10 m
Remark: Estimation done in NON SDRF via 1958/4C Dated 08.09.2026
15-07-2026
Retaining Wall Damaged: 5m x 4.10 m
S.No. Particular (item of work) No Length Width H/D Quantity Unit 1 Mis 1-2 Excavation in foundation for retaining, breast walls etc, in all types of soils and rocks including all lead, lift and disposal of surplus material as per direction of engineer - in - charge, as per drawing and technical specifications Clause 305.1 of MORD Specifiction KM 101 HM 2-4 R/wall 1 X 1/3 5.00 1.97 4.10 13.46
Total 13.46 cum
2 Mis 1-3 Random Rubble Stone Masonry laid Dry, in breast walls, retaining walls, etc. including supply of all material, labour, T&P and royaltiies etc. complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 of MORD Specifiction KM 101 HM 2-4 R/wall 1 X 2 1.60 (0.8+1.77)/2 2.90 11.92 Total 11.92 cum 3 Mis 1-4 Random Rubble Stone Masonry laid in 1:6 cement and sand mortar, in breast walls, retaining walls, parapets, scuppers, etc. including supply of all material, labour, T&P and royaltiies etc. complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 of MORD Specifiction KM 101 HM 2-4 R/wall 1 X 1 5.00 (0.6+1.97)/2 4.10 26.34 (- RR DRY) -11.92 Net 14.42
Total 14.42
4 Mis 1-5 Hand Packed stone filling in back of wallls including cost of all materials,royality, T&P etc. complete as per direction of Engineer-in- charge. (As per PWD Uttarakhand specifications) KM 101 HM 2-4 R/wall 1 X 1 5.00 (0+0.6)/2 3.60 5.40 Total 5.40 cum
Remark: Estimation done in NON SDRF via 1958/4C Dated 08.09.2026
10-08-2026
Retaining Wall and Khud Side slip 16 m * 9 m
**Detail of Measurement ** S.No. Particular (item of work) No Length Width H/D Quantity Unit 1 Mis 1-2 Excavation in foundation for retaining, breast walls etc, in all types of soils and rocks including all lead, lift and disposal of surplus material as per direction of engineer - in - charge, as per drawing and technical specifications Clause 305.1 of MORD Specifiction KM 96 HM 2-4 R/wall 1 X 1/3 16.00 2.27 5.00 60.53 KM 96 HM 2-4 Toe Wall 3 X 1/2 16.00 1.50 1.50 54.00 Total 114.53 cum 2 Mis 1-3 Random Rubble Stone Masonry laid Dry, in breast walls, retaining walls, etc. including supply of all material, labour, T&P and royaltiies etc. complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 of MORD Specifiction KM 96 HM 2-4 R/wall 1 X 5 2.48 (0.8+2.07)/2 3.80 67.62 Total 67.62 cum 3 Mis 1-4 Random Rubble Stone Masonry laid in 1:6 cement and sand mortar, in breast walls, retaining walls, parapets, scuppers, etc. including supply of all material, labour, T&P and royaltiies etc. complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 of MORD Specifiction KM 96 HM 2-4 R/wall 1 X 1 16.00 (0.6+2.27)/2 5.00 114.80 (- RR DRY) -67.62 Net 47.18
Total 47.18
4 Mis 1-5 Hand Packed stone filling in back of wallls including cost of all materials,royality, T&P etc. complete as per direction of Engineer-in- charge. (As per PWD Uttarakhand specifications) KM 96 HM 2-4 R/wall 1 X 1 16.00 (0+0.6)/2 4.50 21.60 Total 21.60 cum 5 Mis 2-1 Cement plum Masonry with 40% plum & 60% 1:3:6 cement concrete including supply of all material, labour, T&P etc. required for proper completion of the work. as per drawings and technical specifications Clause 802, 803, 1202 & 1203 of MORD Specifiction KM 96 HM 2-4 Toe Wall 3 X 1 16.00 1.50 1.50 108.00 Total 108.00 cum
Remark: Khud side sliding lead to Retaining wall damage. Estimation done via eDPR ID: 14716
17-08-2026
Scupper damaged , Reconstruction of RCC Scupper required.
07-09-2026
R/Wall Damage 9 m by 6.5 m
S.No. Particular (item of work) No Length Width H/D Quantity Unit 1 Mis 1-2 Excavation in foundation for retaining, breast walls etc, in all types of soils and rocks including all lead, lift and disposal of surplus material as per direction of engineer - in - charge, as per drawing and technical specifications Clause 305.1 of MORD Specifiction KM 96 HM 6-8 R/wall 1 X 1/3 9.00 2.77 (5.10+2.20)/2 30.33
Total 30.33 cum
2 Mis 1-4 Random Rubble Stone Masonry laid in 1:6 cement and sand mortar, in breast walls, retaining walls, parapets, scuppers, etc. including supply of all material, labour, T&P and royaltiies etc. complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 of MORD Specifiction KM 96 HM 6-8 R/wall 1 X 1 9.00 (0.6+2.77)/2 6.50 98.57 Total 98.57 cum 3 Mis 1-5 Hand Packed stone filling in back of wallls including cost of all materials,royality, T&P etc. complete as per direction of Engineer-in- charge. (As per PWD Uttarakhand specifications) KM 96 HM 6-8 R/wall 1 X 1 9.00 (0+0.6)/2 6.30 17.01 Total 17.01 cum
Remark: Estimation Done via EDPR ID 15407
19-09-2026
Retaining wall damage 7.50 m* 5m
Remark: .
| ID | Date | Location | Cost (₹ Lakh) | Chainages | Status | Yojana |
|---|---|---|---|---|---|---|
| 804 | 09-07-2025 | 6983-SH 14-KM 95 HM 6-8 | 8.56 | 60.650 to 60.664 0.014000000000003 | Completed | SRMD |
| 1816 | 15-07-2025 | Bhatrojkhan | 4.00 | 28.400 to 28.418 0.018000000000001 | Identified | Not Decided |
| 5752 | 07-08-2025 | Ghatti | 0.60 | Identified | Not Decided | |
| 5751 | 12-08-2025 | Bhatrojkhan | 1.18 | Identified | Not Decided | |
| 5750 | 12-08-2025 | Bhatrojkhan | 1.05 | Identified | Not Decided | |
| 5753 | 15-08-2025 | Ghatti | 1.80 | Identified | Not Decided | |
| 1114 | 29-08-2025 | 6983-KRM KM 91 HM 2-4/ Kumeria | 2.00 | 56.250 to 56.255 0.0050000000000026 | Estimation Done | Not Decided |
| 1336 | 30-08-2025 | 6983 KM 98 HM 0-2 / KUMERIA | 2.00 | 63.100 to 63.111 0.010999999999996 | Identified | Not Decided |
| 1123 | 30-08-2025 | 6983-KRM KM 97 HM 4-6 (B) / KUMERIA | 2.50 | 62.550 to 62.557 0.007000000000005 | Estimation Done | Not Decided |
| 1117 | 30-08-2025 | 6983-KRM KM 97 HM 4-6 (A) / KUMERIA | 0.80 | 62.450 to 62.459 0.0090000000000003 | Estimation Done | Not Decided |
| 1127 | 30-08-2025 | KUMERIA | 1.50 | Identified | Not Decided | |
| 2111 | 31-08-2025 | 6983-KM 96 HM 0-2/ BEND NEAR MANDIR | 2.50 | 61.100 to 61.108 0.0079999999999956 | Estimation Done | SRMD |
| 2188 | 31-08-2025 | 6983- KM 91 HM 8-10 / SORAL | 0.10 | 56.950 to 56.954 0.0039999999999978 | Estimation Done | SRMD |
| 2152 | 31-08-2025 | 6983-KM 89 HM 0-2/ between Totam and Saural before HP Bend | 4.00 | 54.100 to 54.121 0.021000000000001 | Estimation Done | SRMD |
| 2100 | 31-08-2025 | 6983-KM 95 HM 0-2/ GHUGHTIDHAR | 1.50 | 60.100 to 60.107 0.0069999999999979 | Estimation Done | SRMD |
| 2082 | 31-08-2025 | 6983-KM 94 HM 6-8/ GHUGHTIDHAR | 1.00 | 59.750 to 59.757 0.0069999999999979 | Estimation Done | SRMD |
| 2069 | 31-08-2025 | 6983-KM 94 HM 6-8/ GHUGHTIDHAR | 1.00 | 59.650 to 59.657 0.0069999999999979 | Estimation Done | SRMD |
| 2047 | 31-08-2025 | 6983-KM 93 HM 8-10 / SAURAL | 0.30 | 58.890 to 58.895 0.0050000000000026 | Estimation Done | SRMD |
| 2038 | 31-08-2025 | 6983-KM 93 HM 4-6 / SAURAL | 1.50 | 58.550 to 58.556 0.0060000000000002 | Estimation Done | SRMD |
| 2029 | 31-08-2025 | 6983-KM 93 HM 4-6 / SAURAL | 0.50 | 58.460 to 58.465 0.0050000000000026 | Estimation Done | SRMD |
| 2015 | 31-08-2025 | 6983-KM 92 HM 0-2 / SAURAL | 0.50 | 57.100 to 57.108 0.0079999999999956 | Estimation Done | SRMD |
| 2012 | 31-08-2025 | 6983-KM 91 HM 6-8 / SAURAL | 2.00 | 56.650 to 56.657 0.0069999999999979 | Estimation Done | SRMD |
| 2000 | 31-08-2025 | 6983-KM 91 HM 4-6 / SAURAL | 5.12 | 56.500 to 56.511 0.011000000000003 | Estimation Done | SRMD |
| 1983 | 31-08-2025 | 6983-KM 74 HM 2-4 / Chaurighatti 2307 | 10.02 | 39.100 to 39.120 0.019999999999996 | Estimation Done | SDRF |
| 4806 | 03-09-2025 | SH-14(6983) kM 39 Tarikhet 38.700-38.800 | 0.50 | 38.700 to 38.710 0.009999999999998 | Identified | Not Decided |
| 3723 | 07-09-2025 | SH-14 near Tarikhet | 0.00 | 40.000 to 40.015 0.015000000000001 | Identified | Not Decided |
| 4800 | 09-09-2025 | SH-14 (6983) Soni (46.950-47.00) | 4.50 | 12.950 to 12.965 0.015000000000001 | Identified | Not Decided |
| 4803 | 09-09-2025 | SH-14 (6983) Tarikhet KM 42 (41.900-42.00) | 2.60 | 7.900 to 7.940 0.04 | Identified | Not Decided |
| 4670 | 12-09-2025 | 6983 - KM 76 HM 6-8 /Chaurighatti | 2.00 | 41.650 to 41.656 0.0060000000000002 | Estimation Done | SRMD |
| 4686 | 15-09-2025 | 6983 KM 77 HM 2-4/ Panwadhokhan | 1.30 | 43.250 to 43.255 0.0050000000000026 | Estimation Done | SRMD |
| 5775 | 22-09-2025 | 6983-KM 86 HM 2-4 | 3.21 | 51.250 to 51.260 0.009999999999998 | Identified | Not Decided |
| 1102 | 29-09-2025 | 6983-KRM 75 HM 6-8 / Chorighatti | 2.70 | 40.650 to 40.658 0.0080000000000027 | Identified | Not Decided |
| 1106 | 29-09-2025 | 6983 KM 84 HM 8-10 / CHAURIGHATTI | 1.50 | 49.860 to 49.866 0.0060000000000002 | Identified | Not Decided |
| 6518 | 01-07-2026 | 6983-KRM SH-14 / KM 83 HM 4-6/ Dabhra Saural 2307 | 4.97 | 48.423 to 48.430 0.0069999999999979 | Estimation Done | SDRF |
| 6686 | 15-07-2026 | 6983-KRM-SH14-KM 95 HM 8-10/Kumeria 2307 | 1.25 | Estimation Done | SDRF | |
| 6689 | 15-07-2026 | 6983-KRM-SH 14- KM 97 HM 2-4/KUMERIA 2307 | 1.10 | 62.300 to 62.305 0.0050000000000026 | Estimation Done | SDRF |
| 6691 | 15-07-2026 | 6983-KRM-SH 14- KM 101 HM 2-4/ Muhan 2307 | 1.10 | 66.350 to 66.355 0.0050000000000097 | Estimation Done | SDRF |
| 7122 | 10-08-2026 | 6983/ KRM-SH 14 KM 96 HM 2-4 /Kumeria 2307 | 9.92 | 61.340 to 61.356 0.015999999999998 | Estimation Done | SRMD |
| 8311 | 17-08-2026 | Sauni | 4.50 | Identified | Not Decided | |
| 8259 | 07-09-2026 | 6983/ KRM-SH 14 KM 96 HM 6-8 /Kumeria 2307 | 4.89 | Estimation Done | SRMD | |
| 8674 | 19-09-2026 | 6983/ KRM-SH 14 KM 81 HM 0-2 /Saural 2307 | 2.10 | 46.900 to 46.908 0.0080000000000027 | Estimation Done | Not Decided |
Try adjusting your filters to see more results