Infrastructure Damage Report : सोनी दयोड़ाखाल सिलोर कुनस्यारी तिपोला बडेत कफड़ा मोटर मार्ग

7554 - प्रान्तीय खण्ड रानीखेत - Almora

7

Total Damage Spots

₹ 24.50 Lakhs

Total Estimated Cost

0

Completed

7

Pending

Status Wise Distribution
Cost Analysis
सोनी दयोड़ाखाल सिलोर कुनस्यारी तिपोला बडेत कफड़ा मोटर मार्ग DivSegmentID:7554 Closure Report Closure Images

EE Office: प्रान्तीय खण्ड रानीखेत

District: Almora

Segment ID: 5726, EE Segment ID: 7554

Pics Count: 7

Damage Spots Details
Spot #1 - ID:2476 , (7554) MDR km 10(8-10), Dyodakhal, Chainage 9.800 - 10.000 , Damaged Length 0.2 KM

24-08-2025

Provisions (प्रावधानों की सूची)

R/wall damaged. protection work with RR 1:6 R/wall required.

Remark: photo attached

₹ 4.50 Lakh
Identified
Fund:Unknown
Spot #2 - ID:2497 , (7554) MDR Km 5(8-10), Dubhna, Chainage 4.875

24-08-2025

Provisions (प्रावधानों की सूची)

R/wall damaged.(L-15M ,H-2.50) RR Dry R/wall required.

Remark: Photo attached

₹ 1.50 Lakh
Identified
Fund:Unknown
Spot #3 - ID:2506 , (7554) MDR Km 3(2-4), Devlikhet, Chainage 2.250 - 2.275 , Damaged Length 0.025 KM

24-08-2025

Provisions (प्रावधानों की सूची)

Scupper damaged Reconstruction of RCC scupper required.

Remark: photo attached

₹ 3.50 Lakh
Identified
Fund:Unknown
Spot #4 - ID:2514 , (7554) MDR km 3(8-10), Devlikhet, Chainage 2.850 - 2.900 , Damaged Length 0.05 KM

24-08-2025

Provisions (प्रावधानों की सूची)

Scupper damaged Reconstruction of new RCC scupper required.

Remark: photo attached

₹ 3.50 Lakh
Identified
Fund:Unknown
Spot #5 - ID:2518 , (7554) MDR Km 6(6-8) Sanri, Chainage 5.700 - 5.725 , Damaged Length 0.025 KM

24-08-2025

Provisions (प्रावधानों की सूची)

damaged scupper Reconstruction of new RCC scupper required

Remark: photo attached

₹ 4.00 Lakh
Identified
Fund:Unknown
Spot #6 - ID:2564 , (7554) MDR KM 20(6-8) Dyoda, Chainage 19.650 - 19.675 , Damaged Length 0.025 KM

24-08-2025

Provisions (प्रावधानों की सूची)

damaged scupper Reconstruction of new RCC scupper required

Remark: photo attached

₹ 3.50 Lakh
Identified
Fund:Unknown
Spot #7 - ID:2458 , (7554) MDR KM 13 Saloni band, Chainage 12.325

03-09-2025

Provisions (प्रावधानों की सूची)

Edge settlement (L-20.00M, H-3.00 M) protection work with plum concrete and RR 1:6 R/wall required.

Remark: photo attached

₹ 4.00 Lakh
Identified
Fund:Unknown

All Damage Spots

ID Date Location Cost (₹ Lakh) Chainages Status Yojana
2476 24-08-2025 (7554) MDR km 10(8-10), Dyodakhal 4.50 9.800 to 10.000 0.2 Identified Not Decided
2497 24-08-2025 (7554) MDR Km 5(8-10), Dubhna 1.50 Identified Not Decided
2506 24-08-2025 (7554) MDR Km 3(2-4), Devlikhet 3.50 2.250 to 2.275 0.025 Identified Not Decided
2514 24-08-2025 (7554) MDR km 3(8-10), Devlikhet 3.50 2.850 to 2.900 0.05 Identified Not Decided
2518 24-08-2025 (7554) MDR Km 6(6-8) Sanri 4.00 5.700 to 5.725 0.024999999999999 Identified Not Decided
2564 24-08-2025 (7554) MDR KM 20(6-8) Dyoda 3.50 19.650 to 19.675 0.025000000000002 Identified Not Decided
2458 03-09-2025 (7554) MDR KM 13 Saloni band 4.00 Identified Not Decided