Infrastructure Damage Report : देवीपुरा सौड मोटर मार्ग

9831 - निर्माण खण्ड रामनगर - Nanital

4

Total Damage Spots

₹ 53.39 Lakhs

Total Estimated Cost

0

Completed

4

Pending

Status Wise Distribution
Cost Analysis
देवीपुरा सौड मोटर मार्ग DivSegmentID:9831 Closure Report Closure Images

EE Office: निर्माण खण्ड रामनगर

District: Nanital

Segment ID: 6702, EE Segment ID: 9831

Pics Count: 6

Damage Spots Details
Spot #1 - ID:690 , Baghni 12.925

09-08-2025

Provisions (प्रावधानों की सूची)
  1. Wire Crete 3 layer X 21m length Cost 1.80 Lakh
  2. Plum T/wall 3 layer X 20m length Cost 5.18 Lakh
  3. R/Wall 20.0 m X 3.67 Height Cost 5.80 Lakh
  4. Causeway 15.00mX 6.00 m Cost 2.11 Lakh

Remark: आगणन गठित।

₹ 14.89 Lakh
Estimation Done
Fund:Unknown
Spot #2 - ID:1187 , Devipura 0.530

11-08-2025

Provisions (प्रावधानों की सूची)
  1. R/Wall 25.00 m X 4.50 m Cost 7.5 Lakh
  2. Wire Crete 40.00m X 4.5 m Cost 9.00 Lakh

Remark: R/wall & B/wall

₹ 16.50 Lakh
Identified
Fund:Unknown
Spot #3 - ID:1188 , Riyad 6.500

11-08-2025

Provisions (प्रावधानों की सूची)
  1. B/Wall 20.00 m X 5.00 m Cost 7.0 Lakh

Remark: Protection

₹ 7.00 Lakh
Identified
Fund:Unknown
Spot #4 - ID:1194 , Dumela 8.500

30-09-2025

Provisions (प्रावधानों की सूची)
  1. R/wall 35.00 m X 4.500 m Cost 10 Lakh
  2. Re-surfacing 35.00 m X 3.75 m Cost 5 Lakh

Remark: R/wall & re-surfacing

₹ 15.00 Lakh
Identified
Fund:Unknown

All Damage Spots

ID Date Location Cost (₹) Status Yojana
690 09-08-2025 Baghni 14.89 Estimation Done SRMD
1187 11-08-2025 Devipura 16.50 Identified Not Decided
1188 11-08-2025 Riyad 7.00 Identified Not Decided
1194 30-09-2025 Dumela 15.00 Identified Not Decided