Infrastructure Damage Report : Rataura bridge

5529 - निर्माण खण्ड नैनीताल - Nanital

1

Total Damage Spots

₹ 125.00 Lakhs

Total Estimated Cost

0

Completed

1

Pending

Status Wise Distribution
Cost Analysis

EE Office: निर्माण खण्ड नैनीताल

District: Nanital

Segment ID: 82, EE Segment ID: 5529

Pics Count: 0

Damage Spots Details
Spot #1 - ID:8102

01-09-2026

Provisions (प्रावधानों की सूची)

1 Excavation in foundation for retaining, breast walls etc, in all types of soils and rocks including all lead, lift and disposal of surplus material as per direction of engineer - in - charge, as per drawing and technical specifications Clause 305.1 of MORD Specifiction For CC Plum 1 x 20 6.00 3.00 3.00 1080.00 Cum Total 1080.00 Cum Say 1080.00 Cum 2 Cement plum Masonry with 40% plum & 60% 1:3:6 cement concrete including supply of all material, labour, T&P etc. required for proper completion of the work. as per drawings and technical specifications Clause 802, 803, 1202 & 1203 of MORD Specifiction For CC Plum 1st Row 1 x 20 6.00 3.00 3.00 1080.00 Cum For CC Plum 2nd Row 1 x 15 6.00 3.00 3.00 810.00 Cum Total 1890.00 Cum Say 1890.00 Cum 3 Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 (For height upto 5 m) R.C.C. grade M 25 Jacketing Detail Left Abutment 1.0 x 1 10.00 0.50 5.00 25.00 Cum R.C.C Wall 1.0 x 1 30.00 1.00 15.00 450.00 Cum Total 25.00 Cum Say 25.00 Cum 4 Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 (The reinforcement steel shall be procured from original (primary) steel producers as per clause no. 2011.3.1 of MORD specifications (First revision’2014) and IS 1786:2008 clause no. 1.6) Jacketing Detail Left Abutment 1 x 50 2.50 7.47 Kg/Rm 933.75 Kg R.C.C Wall 2 x 150 15.00 0.88 Kg/Rm 3960.00 Kg 2 x 75 30.00 0.88 Kg/Rm 3960.00 Kg Total 8853.75 Kg Say 8853.75 Kg

1 Excavation in foundation for retaining, breast walls etc, in all types of soils and rocks including all lead, lift and disposal of surplus material as per direction of engineer - in - charge, as per drawing and technical specifications Clause 305.1 of MORD Specifiction 1080.00 Cu.m 404.60 Cu.m 436968.00 2 Cement plum Masonry with 40% plum & 60% 1:3:6 cement concrete including supply of all material, labour, T&P etc. required for proper completion of the work. as per drawings and technical specifications Clause 802, 803, 1202 & 1203 of MORD Specifiction 1890.00 Cum 4015.90 Cum 7590051.00 3 Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 (For height upto 5 m) R.C.C. grade M 25 25.00 Cu.m 7580.70 Cu.m 189517.50 4 Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 (The reinforcement steel shall be procured from original (primary) steel producers as per clause no. 2011.3.1 of MORD specifications (First revision’2014) and IS 1786:2008 clause no. 1.6) 8853.75 Kg 65.81 Kg 582638.73 TOTAL 8799175.23 GST 18% 1583851.54 TOTAL 10383026.77 103.83 lac.

₹ 125.00 Lakh
Identified
Fund:Unknown