जाखणीखाल खोलगढी से वरील होते हुये झिंवाली मुंगराली मोटर मार्ग (ID: 2450) , प्रान्तीय खण्ड नई टिहरी , Tehri

# KM Closed On Tentative Date Opened On Response Time Open Type Informed By Initial cost Restoration Cost Damage Type Location Chainages Remark PiC geo location lat lng
1 2 2025-06-05 08:08:31 2025-06-05 17:08:31 2025-06-05 17:26:46 9 hours 18 mins Opened Mr Ashok Chauhan ,Assistant Engineer Civil ,42270213M01347 0.04 0.00 Slip/ Landslide Cleansing of slip and debris from rain water accumulated at different places -
2 3 2025-06-05 08:08:31 2025-06-05 17:08:31 2025-06-05 16:36:12 8 hours 27 mins Opened Mr Ashok Chauhan ,Assistant Engineer Civil ,42270213M01347 0.04 0.00 Slip/ Landslide Cleansing of slip and debris from rain water accumulated at different places -
3 4 2025-06-05 08:08:31 2025-06-05 17:08:31 2025-06-05 13:57:32 5 hours 49 mins Opened Mr Ashok Chauhan ,Assistant Engineer Civil ,42270213M01347 0.04 0.00 Slip/ Landslide Cleansing of slip and debris from rain water accumulated at different places -
4 4 2025-06-27 07:42:03 2025-06-27 12:42:03 2025-06-27 12:35:53 4 hours 53 mins Opened Satish Chandra Bhatt ,Assistant Engineer Civil ,61006224 0.06 0.02 Slip/ Landslide Motna JCB moved to site -
5 5 2025-06-05 08:08:31 2025-06-05 17:08:31 2025-06-05 13:06:54 4 hours 58 mins Opened Mr Ashok Chauhan ,Assistant Engineer Civil ,42270213M01347 0.04 0.00 Slip/ Landslide Cleansing of slip and debris from rain water accumulated at different places -
Total: 0.22 0.02

Current Road KM Closures (as on 28 Jun 2025)

KM Tentative Opening Date Status
Road is open.

is opened for Traffic