आमपाटा अडाना कफोलगांव मोटर मार्गं (ID: 2609) , निर्माण खण्ड नरेन्द्रनगर , Tehri

# KM Closed On Tentative Date Opened On Response Time Open Type Informed By Initial cost Restoration Cost Damage Type Location Chainages Remark PiC geo location lat lng ID
1 2 2025-08-07 11:36:04 2025-08-07 17:36:00 2025-08-07 17:40:39 6 hours 4 mins Opened Gambhir Singh Aswal ,AE ,410011239 0.06 0.00 Slip/ Landslide slip - 17788
2 2 2025-08-08 12:20:49 2025-08-08 12:21:00 2025-08-08 12:21:44 0 mins 55 secs Opened Balbir Singh Pundir ,Draftsman ,61004780 0.00 5.00 Retaining Wall Damage Retaining Wall Damage Length 16.50x5.10 meter. - 18480
3 2 2025-08-09 09:18:03 2025-08-09 14:40:00 2025-08-09 14:41:07 5 hours 23 mins Opened Gambhir Singh Aswal ,AE ,410011239 0.04 0.00 Slip/ Landslide Slip clearance - 18866
4 3 2025-08-07 11:36:04 2025-08-07 17:36:04 2025-08-07 17:40:52 6 hours 4 mins Opened Gambhir Singh Aswal ,AE ,410011239 0.06 0.00 Slip/ Landslide slip - 17789
5 3 2025-08-08 12:22:59 2025-08-08 12:23:00 2025-08-08 12:23:46 0 mins 47 secs Opened Balbir Singh Pundir ,Draftsman ,61004780 0.00 3.00 Retaining Wall Damage Retaining Wall Damage Length 10x5 meter. - 18482
6 3 2025-08-09 09:18:03 2025-08-09 14:40:00 2025-08-09 14:41:13 5 hours 23 mins Opened Gambhir Singh Aswal ,AE ,410011239 0.04 0.00 Slip/ Landslide Slip clearance - 18867
7 1 2025-08-08 12:18:30 2025-08-08 12:19:00 2025-08-08 12:19:11 0 mins 41 secs Opened Balbir Singh Pundir ,Draftsman ,61004780 0.00 4.00 Retaining Wall Damage Retaining Wall Damage Length 15x4.50 meter. - 18476
Total: 0.20 12.00

Current Road KM Closures (as on 28 Aug 2025)

KM Tentative Opening Date Status
Road is open.

is opened for Traffic