| 1 |
1 |
2026-07-20 16:48:50 |
2026-07-20 18:48:50
|
2026-07-20 18:36:27 |
1 hours 47 mins |
Opened |
Bhavya Kamboj ,AE ,65005208 |
0.40 |
0.85 |
Slip/ Landslide
|
|
|
|
|
-
|
|
|
52969 |
| 2 |
1 |
2026-07-30 12:15:46 |
2026-07-30 15:15:00
|
2026-07-30 14:24:12 |
2 hours 8 mins |
Opened |
Bhavya Kamboj ,AE ,65005208 |
0.25 |
0.60 |
Sinking, Fludding
|
|
|
The muddy stretch of the road was repaired by laying stone aggregate, restoring smooth traffic flow. |
|
-
|
|
|
58459 |
| 3 |
1 |
2026-07-31 11:04:49 |
2026-07-31 17:04:00
|
2026-07-31 16:30:21 |
5 hours 25 mins |
Opened |
Bhavya Kamboj ,AE ,65005208 |
0.20 |
0.50 |
Sinking, Fludding
|
|
|
Aggregates were spread and leveled with a JCB to ensure smooth traffic flow in the muddy or marshy area. |
|
-
|
|
|
58912 |
| 4 |
1 |
2026-08-06 06:39:07 |
2026-08-06 17:02:00
|
2026-08-06 16:48:19 |
10 hours 9 mins |
Opened |
Bhavya Kamboj ,AE ,65005208 |
1.50 |
2.45 |
Slip/ Landslide, Washout, Sinking
|
|
|
|
|
|
30.598610000000 |
77.788024000000 |
61496 |