जाख अक्सोडा मोटर मार्ग (ID: 5042) , नि0ख0 पाबौ , Pauri

# KM Closed On Tentative Date Opened On Response Time Open Type Informed By Initial cost Restoration Cost Damage Type Location Chainages Remark PiC geo location lat lng ID
1 3 2025-07-07 09:25:28 2025-07-07 12:25:28 2025-07-07 15:34:08 6 hours 8 mins Opened Ravindra Singh Bisht ,Junior Engineer Technical ,570064290 0.03 0.03 Slip/ Landslide Partially Closed at various places - 6920
2 4 2025-07-07 09:25:28 2025-07-07 12:25:28 2025-07-07 15:34:20 6 hours 8 mins Opened Ravindra Singh Bisht ,Junior Engineer Technical ,570064290 0.03 0.03 Slip/ Landslide Partially Closed at various places - 6921
3 5 2025-07-07 09:25:28 2025-07-07 12:25:28 2025-07-07 15:34:29 6 hours 9 mins Opened Ravindra Singh Bisht ,Junior Engineer Technical ,570064290 0.03 0.03 Slip/ Landslide Partially Closed at various places - 6922
4 5 2025-08-04 14:28:31 2025-08-04 21:28:31 2025-08-05 12:26:57 21 hours 58 mins Opened Ravindra Singh Bisht ,Junior Engineer Technical ,570064290 0.20 0.20 Slip/ Landslide - 15245
5 6 2025-07-21 09:33:57 2025-07-21 16:33:57 2025-07-23 12:57:11 2 days 3 hours Opened Ashok Kumar ,AE ,42009024 0.10 0.10 Slip/ Landslide JCB, after 4.00 hours reach this point - 11109
6 2 2025-08-14 12:36:02 2025-08-14 12:36:02 2025-08-14 12:36:50 0 mins 48 secs Opened Ravindra Singh Bisht ,Junior Engineer Technical ,570064290 2.00 20.00 Slip/ Landslide, Scupper/ Culvert Damage, Sinking, Retaining Wall Damage दीवारें एवं स्कपर क्षतिग्रस्त। - 21747
7 2 2025-08-20 09:13:53 2025-08-20 09:13:53 2025-08-21 11:27:01 1 days 2 hours Opened Ravindra Singh Bisht ,Junior Engineer Technical ,570064290 0.50 0.50 Slip/ Landslide - 25040
Total: 2.89 20.89

Current Road KM Closures (as on 28 Aug 2025)

KM Tentative Opening Date Status
Road is open.

is opened for Traffic