ककरालीगेट ठुलीगाढ़ भैरवमन्दिर राज्य मार्ग (ID: 5682) , प्रान्तीय खण्ड चम्पावत , Champawat

# KM Closed On Tentative Date Opened On Response Time Open Type Informed By Initial cost Restoration Cost Damage Type Location Chainages Remark PiC geo location lat lng
1 1 2025-06-18 00:20:05 2025-06-21 12:20:05 2025-06-18 08:42:31 8 hours 22 mins Opened Mr Laxman Singh ,Assistant Engineer Civil ,360020144 2.50 5.00 Slip/ Landslide Road is closed due to heavy slips with heavy boulders and muck at batnagar between 7.80km to 8.50km 29.120200000000 80.159800000000
2 8 2025-06-18 00:56:46 2025-06-21 11:56:46 2025-06-21 09:49:09 3 days 8 hours Opened Mr Laxman Singh ,Assistant Engineer Civil ,360020144 2.50 5.00 Slip/ Landslide SH 108 closed at batnagar km 8 , due to heavy slips with heavy boulders and muck, by 12.50 am today tentative opening time 12.50 am on 21.06.25 29.120200000000 80.159800000000
3 9 2025-06-18 00:57:12 2025-06-21 12:57:12 2025-06-21 09:49:22 3 days 8 hours Opened Mr Laxman Singh ,Assistant Engineer Civil ,360020144 0.50 25.00 Retaining Wall Damage Causey and retaining wall damadged due to heavy slips with heavy boulders and muck at km 9 on purnagiri road SH 108 29.123900000000 80.161800000000
4 9 2025-06-22 12:19:21 2025-06-22 17:19:00 2025-06-22 15:10:49 2 hours 51 mins Opened Mr Laxman Singh ,Assistant Engineer Civil ,360020144 0.50 0.50 Slip/ Landslide Road blocked due to flow of water and muck on the road due to heavy rainfall between km 8 and km 9. -
5 9 2025-06-25 07:39:16 2025-06-25 10:39:16 2025-06-25 09:34:04 1 hours 54 mins Opened Mr Laxman Singh ,Assistant Engineer Civil ,360020144 0.05 0.25 Slip/ Landslide Road blocked due to heavy slip and boulders -
6 9 2025-06-25 13:14:40 2025-06-25 14:14:40 2025-06-25 15:04:11 1 hours 49 mins Opened Mr Laxman Singh ,Assistant Engineer Civil ,360020144 0.10 0.50 Slip/ Landslide Block due to slip and boulders -
7 9 2025-06-28 05:50:30 2025-06-28 10:50:30 5 hours 0 mins Mr Laxman Singh ,Assistant Engineer Civil ,360020144 0.20 2.00 Slip/ Landslide Road closed due to heavy slip and boulders. -
8 10 2025-06-25 07:39:16 2025-06-25 10:39:16 2025-06-25 09:34:36 1 hours 55 mins Opened Mr Laxman Singh ,Assistant Engineer Civil ,360020144 0.05 0.25 Slip/ Landslide Road blocked due to heavy slip and boulders -
Total: 6.40 38.50

Current Road KM Closures (as on 28 Jun 2025)

KM Tentative Opening Date Status
9 2025-06-28 10:50:30 Closed
Road is closed at KM 9 (tentative: 2025-06-28 10:50:30).

Proposed to be open up to: Sat 28 Jun 2025 10:50 (3 hours 14 minutes 9 seconds from now from now)