1
24
2025-06-02 23:58:38
2025-06-03 02:58:00
2025-06-03 11:36:50
11 hours 38 mins
Opened
Rajendra Kumar ,Assistant Engineer Civil ,410011677
0.05
0.00
Slip/ Landslide
मार्ग यातायात हेतु खुला है।
30.532683000000
77.886960000000
4
2
24
2025-06-27 12:30:48
2025-06-27 14:30:48
2025-06-27 20:59:27
8 hours 28 mins
Opened
Rajendra Kumar ,Assistant Engineer Civil ,410011677
0.05
0.06
Slip/ Landslide
Road partially closed by Running boulders and slip
-
2341
3
24
2025-08-06 10:50:53
2025-08-06 11:50:00
2025-08-06 12:20:57
1 hours 30 mins
Opened
Rajendra Kumar ,Assistant Engineer Civil ,410011677
0.50
0.70
Slip/ Landslide
Road closed by Running slip. Expected time of opening 01 hour
-
16556
4
24
2025-08-08 10:11:56
2025-08-08 19:11:00
2025-08-08 21:08:45
10 hours 56 mins
Opened
Rajendra Kumar ,Assistant Engineer Civil ,410011677
0.08
0.10
Slip/ Landslide
Road closed by Running slip and boulders. Road open to light vehicles
-
18317
5
24
2025-09-16 09:21:40
2025-09-16 14:21:40
2025-09-16 18:13:36
8 hours 51 mins
Opened
Rajendra Kumar ,Assistant Engineer Civil ,410011677
0.05
0.06
Slip/ Landslide
Road closed by Running slip and boulders two jcb diployed
-
38113
6
27
2025-06-06 07:08:40
2025-06-06 09:08:40
2025-06-06 09:47:48
2 hours 39 mins
Opened
Rajendra Kumar ,Assistant Engineer Civil ,410011677
0.02
0.03
Slip/ Landslide
Partially closed
-
91
7
27
2025-06-07 09:56:51
2025-06-07 12:56:51
2025-06-07 13:21:42
3 hours 24 mins
Opened
Rajendra Kumar ,Assistant Engineer Civil ,410011677
0.05
0.08
Slip/ Landslide
Road closed by Running boulders & slip
30.529135000000
77.885996000000
139
8
27
2025-06-10 05:15:52
2025-06-10 09:15:52
2025-06-10 08:01:58
2 hours 46 mins
Opened
Rajendra Kumar ,Assistant Engineer Civil ,410011677
0.05
0.07
Slip/ Landslide
Road closed by Running boulders & slip
-
159
9
27
2025-06-12 08:47:33
2025-06-12 10:47:33
2025-06-12 11:01:44
2 hours 14 mins
Opened
Rajendra Kumar ,Assistant Engineer Civil ,410011677
0.05
0.08
Slip/ Landslide
Road closed by Running boulders & slip
-
184
10
27
2025-06-15 04:39:49
2025-06-15 08:39:49
2025-06-15 07:43:06
3 hours 3 mins
Opened
Rajendra Kumar ,Assistant Engineer Civil ,410011677
0.08
0.10
Slip/ Landslide
Road closed by Running boulders & slip
39.529135000000
77.885996000000
324
11
27
2025-06-18 10:25:26
2025-06-18 11:25:26
2025-06-18 10:54:56
29 mins 30 secs
Opened
Rajendra Kumar ,Assistant Engineer Civil ,410011677
0.05
0.08
Slip/ Landslide
Road closed by Running boulders and slip
-
640
12
27
2025-06-20 07:15:22
2025-06-20 09:15:22
2025-06-20 09:31:20
2 hours 15 mins
Opened
Rajendra Kumar ,Assistant Engineer Civil ,410011677
0.08
0.08
Slip/ Landslide
Road closed by Running boulders and slip
-
816
13
27
2025-06-27 12:30:48
2025-06-27 14:30:48
2025-06-27 20:45:08
8 hours 14 mins
Opened
Rajendra Kumar ,Assistant Engineer Civil ,410011677
0.05
0.06
Slip/ Landslide
Road partially closed by Running boulders and slip
-
2344
14
27
2025-06-29 12:21:26
2025-06-29 15:21:26
2025-06-29 19:58:36
7 hours 37 mins
Opened
Rajendra Kumar ,Assistant Engineer Civil ,410011677
0.04
0.05
Slip/ Landslide
Road closed by Running boulders and slip
-
3444
15
27
2025-07-16 09:50:11
2025-07-16 12:50:11
2025-07-16 10:56:44
1 hours 6 mins
Opened
Rajendra Kumar ,Assistant Engineer Civil ,410011677
0.23
0.03
Slip/ Landslide
Road partially closed jcb diployed for slip clearance
-
9849
16
27
2025-09-13 08:34:36
2025-09-13 10:34:00
2025-09-15 16:42:17
2 days 8 hours
Opened
Rajendra Kumar ,Assistant Engineer Civil ,410011677
0.12
0.15
Slip/ Landslide
Road closed by Running slip and boulders two jcb diployed
-
37137
17
35
2025-06-17 10:02:41
2025-06-17 11:02:41
2025-06-17 10:17:58
15 mins 17 secs
Opened
Rajendra Kumar ,Assistant Engineer Civil ,410011677
0.05
0.07
Slip/ Landslide
Road closed by Running slip & boulders
-
526
18
35
2025-06-19 08:15:19
2025-06-19 08:15:19
2025-06-19 08:29:34
14 mins 15 secs
Opened
Mukesh Saklani ,Assistant Engineer Civil ,65006268
0.10
0.15
Slip/ Landslide
Landslide
-
709
19
35
2025-07-16 05:22:09
2025-07-16 08:22:09
2025-07-16 11:08:42
5 hours 46 mins
Opened
Mukesh Saklani ,Assistant Engineer Civil ,65006268
0.01
0.04
Slip/ Landslide
-
9778
20
35
2025-09-13 08:34:36
2025-09-13 10:34:36
2025-09-13 12:17:40
3 hours 43 mins
Opened
Rajendra Kumar ,Assistant Engineer Civil ,410011677
0.02
0.03
Slip/ Landslide
Road closed by Running slip and boulders
-
37145
21
26
2025-06-20 12:02:42
2025-06-20 13:02:42
2025-06-20 12:59:42
57 mins 0 secs
Opened
Rajendra Kumar ,Assistant Engineer Civil ,410011677
0.04
0.05
Slip/ Landslide
Road closed by Running boulders and slip
-
899
22
26
2025-06-23 11:48:38
2025-06-23 13:48:38
2025-06-23 13:47:06
1 hours 58 mins
Opened
Rajendra Kumar ,Assistant Engineer Civil ,410011677
0.60
0.70
Slip/ Landslide
Road closed by Running boulders and slip
-
1312
23
26
2025-06-24 11:22:02
2025-06-24 13:22:02
2025-06-24 14:39:05
3 hours 17 mins
Opened
Rajendra Kumar ,Assistant Engineer Civil ,410011677
0.80
0.10
Slip/ Landslide
Road closed by Running boulders and slip
-
1519
24
26
2025-06-25 10:37:23
2025-06-25 12:37:23
2025-06-25 14:04:57
3 hours 27 mins
Opened
Rajendra Kumar ,Assistant Engineer Civil ,410011677
0.08
0.10
Slip/ Landslide
Road closed by Running boulders and slip
-
1733
25
26
2025-06-25 15:23:58
2025-06-25 16:23:58
2025-06-25 16:49:09
1 hours 25 mins
Opened
Rajendra Kumar ,Assistant Engineer Civil ,410011677
0.06
0.08
Slip/ Landslide
Road closed by Running boulders and slip
-
1850
26
26
2025-06-26 11:53:43
2025-06-26 13:53:43
2025-06-26 14:13:32
2 hours 19 mins
Opened
Rajendra Kumar ,Assistant Engineer Civil ,410011677
0.08
0.10
Slip/ Landslide
Road closed by Running boulders slip
-
2091
27
26
2025-06-27 12:30:48
2025-06-27 14:30:48
2025-06-27 21:12:00
8 hours 41 mins
Opened
Rajendra Kumar ,Assistant Engineer Civil ,410011677
0.05
0.06
Slip/ Landslide
Road partially closed by Running boulders and slip
-
2343
28
26
2025-06-29 12:21:26
2025-06-29 15:21:26
2025-06-29 19:58:04
7 hours 36 mins
Opened
Rajendra Kumar ,Assistant Engineer Civil ,410011677
0.04
0.05
Slip/ Landslide
Road closed by Running boulders and slip
-
3443
29
26
2025-06-29 20:12:52
2025-06-29 23:12:52
2025-06-30 11:13:43
15 hours 0 mins
Opened
Rajendra Kumar ,Assistant Engineer Civil ,410011677
0.12
0.15
Slip/ Landslide
Road closed by Running boulders and slip
-
3857
30
26
2025-06-30 12:26:48
2025-06-30 14:26:48
2025-07-01 15:44:14
1 days 3 hours
Opened
Rajendra Kumar ,Assistant Engineer Civil ,410011677
0.15
0.17
Slip/ Landslide
Road closed by Running boulders and slip
-
4403
31
26
2025-07-01 20:55:05
2025-07-01 23:55:05
2025-07-02 12:16:19
15 hours 21 mins
Opened
Rajendra Kumar ,Assistant Engineer Civil ,410011677
0.28
0.32
Slip/ Landslide
Road closed by Running boulders and slip. Two jcb diployed
-
5274
32
26
2025-07-03 15:56:28
2025-07-03 17:56:00
2025-07-03 17:36:58
1 hours 40 mins
Opened
Rajendra Kumar ,Assistant Engineer Civil ,410011677
0.07
0.08
Slip/ Landslide
Road closed by Running boulders and slip
30.529148000000
77.885907000000
5995
33
26
2025-07-04 08:34:01
2025-07-04 15:34:00
2025-07-04 15:20:10
6 hours 46 mins
Opened
Rajendra Kumar ,Assistant Engineer Civil ,410011677
0.15
0.17
Slip/ Landslide
Road closed by Running boulders and slip
30.529177000000
77.885916000000
6139
34
26
2025-07-04 20:11:28
2025-07-05 14:30:00
2025-07-05 14:20:51
18 hours 9 mins
Opened
Rajendra Kumar ,Assistant Engineer Civil ,410011677
0.25
0.28
Slip/ Landslide
Road closed by Running boulders and slip continuously. Two jcb diployed
-
6448
35
26
2025-07-06 06:39:43
2025-07-07 14:44:00
2025-07-07 14:47:21
1 days 8 hours
Opened
Rajendra Kumar ,Assistant Engineer Civil ,410011677
0.55
0.60
Slip/ Landslide
Boulders are continuously falling from the hill side. The work of opening the route has been stopped for safety reasons.
-
6743
36
26
2025-07-11 11:34:55
2025-07-11 14:34:00
2025-07-11 15:31:44
3 hours 56 mins
Opened
Rajendra Kumar ,Assistant Engineer Civil ,410011677
0.15
0.17
Slip/ Landslide
Road closed by Running boulders and slip
-
8622
37
26
2025-07-12 07:42:01
2025-07-12 13:42:00
2025-07-12 13:30:46
5 hours 48 mins
Opened
Rajendra Kumar ,Assistant Engineer Civil ,410011677
0.15
0.20
Slip/ Landslide
Road closed by Running boulders and slip
-
8843
38
26
2025-07-16 09:50:11
2025-07-16 12:50:11
2025-07-16 10:53:58
1 hours 3 mins
Opened
Rajendra Kumar ,Assistant Engineer Civil ,410011677
0.23
0.03
Slip/ Landslide
Road partially closed jcb diployed for slip clearance
-
9848
39
26
2025-07-16 12:03:18
2025-07-16 19:03:00
2025-07-16 19:05:32
7 hours 2 mins
Opened
Rajendra Kumar ,Assistant Engineer Civil ,410011677
0.80
0.10
Slip/ Landslide
Road closed by Running boulders and the jcb diployed
-
9894
40
26
2025-07-17 06:13:14
2025-07-17 18:15:00
2025-07-17 20:26:11
14 hours 12 mins
Opened
Rajendra Kumar ,Assistant Engineer Civil ,410011677
0.12
0.15
Slip/ Landslide
Road closed by Running boulders and slip jcb diployed
-
9995
41
26
2025-07-18 07:11:39
2025-07-18 10:11:39
2025-07-18 10:55:57
3 hours 44 mins
Opened
Rajendra Kumar ,Assistant Engineer Civil ,410011677
0.12
0.15
Slip/ Landslide
Road closed by very boulders. JCB with breaker deploy for opening road.
-
10353
42
26
2025-08-04 07:31:14
2025-08-04 13:31:00
2025-08-04 13:57:34
6 hours 26 mins
Opened
Rajendra Kumar ,Assistant Engineer Civil ,410011677
0.17
0.25
Slip/ Landslide, Retaining Wall Damage
Road closed by very heavy running boulders and slip continuously. Jcb diployed for opening road. Problem opening because rain continuously.
-
14861
43
26
2025-08-04 15:16:18
2025-08-04 20:16:00
2025-08-04 20:51:16
5 hours 34 mins
Opened
Rajendra Kumar ,Assistant Engineer Civil ,410011677
0.12
0.15
Slip/ Landslide, Retaining Wall Damage
The road has been closed again due to continuous boulders and slips. JCB has been deployed to open the road.
-
15191
44
26
2025-08-05 07:02:45
2025-08-05 13:02:00
2025-08-05 15:32:05
8 hours 29 mins
Opened
Rajendra Kumar ,Assistant Engineer Civil ,410011677
0.12
0.15
Slip/ Landslide
Due to continuous falling of boulders, the deployed JCB is facing delay in opening the road.
-
15418
45
26
2025-08-06 07:47:11
2025-08-06 19:47:00
2025-08-06 20:08:30
12 hours 21 mins
Opened
Rajendra Kumar ,Assistant Engineer Civil ,410011677
0.15
0.20
Slip/ Landslide
Road closed by shooting boulders and slip continuously. 2 JCB deploy for opening road.
-
16260
46
26
2025-08-07 08:51:56
2025-08-07 12:51:00
2025-08-07 13:49:26
4 hours 57 mins
Opened
Rajendra Kumar ,Assistant Engineer Civil ,410011677
0.18
0.25
Slip/ Landslide
Road closed by shooting border and slip continuously
-
17628
47
26
2025-08-08 09:05:00
2025-08-08 19:05:00
2025-08-08 21:08:19
12 hours 3 mins
Opened
Rajendra Kumar ,Assistant Engineer Civil ,410011677
0.05
0.07
Slip/ Landslide
Road closed by Running slip and boulders. The road has been closed again due to heavy rains. JCB machines are continuously trying to open the road.
-
18303
48
26
2025-08-09 09:35:24
2025-08-09 13:35:00
2025-08-09 14:41:02
5 hours 5 mins
Opened
Rajendra Kumar ,Assistant Engineer Civil ,410011677
0.10
0.15
Slip/ Landslide
Road closed by Running slip and boulders
-
18870
49
26
2025-08-11 09:34:01
2025-08-12 14:34:00
2025-08-12 12:25:40
1 days 2 hours
Opened
Rajendra Kumar ,Assistant Engineer Civil ,410011677
0.18
0.20
Slip/ Landslide
Road closed by Running slip and boulders. Due to continuous heavy rainfall, the line land slides due to which JCB is facing difficulty in opening the route.
-
19473
50
26
2025-08-14 09:47:35
2025-08-14 11:47:00
2025-08-14 11:02:28
1 hours 14 mins
Opened
Rajendra Kumar ,Assistant Engineer Civil ,410011677
0.18
0.20
Slip/ Landslide
Road closed by Running slip and boulders. Miner slip 4 -5 palace
-
21451
51
26
2025-08-17 09:42:28
2025-08-17 14:42:28
2025-08-17 11:50:29
2 hours 8 mins
Opened
Rajendra Kumar ,Assistant Engineer Civil ,410011677
0.18
0.22
Slip/ Landslide
Road closed by Running slip and boulders
-
23138
52
26
2025-08-30 07:47:33
2025-08-30 16:47:00
2025-08-30 18:16:43
10 hours 29 mins
Opened
Rajendra Kumar ,Assistant Engineer Civil ,410011677
0.25
0.30
Slip/ Landslide
Road closed by Running slip and heavy boulders
-
29708
53
26
2025-08-31 07:36:34
2025-08-31 14:15:00
2025-08-31 19:51:26
12 hours 14 mins
Opened
Rajendra Kumar ,Assistant Engineer Civil ,410011677
0.28
0.30
Slip/ Landslide
Road closed by Running slip and boulders. Also breaker deployed for breaking very heavy boulders
-
30152
54
26
2025-09-01 10:17:11
2025-09-01 15:17:00
2025-09-01 17:36:57
7 hours 19 mins
Opened
Rajendra Kumar ,Assistant Engineer Civil ,410011677
0.25
0.28
Slip/ Landslide
Road closed by Running slip and heavy shooting boulders because Continuously heavy rains 01 poke lane for breaking very heavy boulders one JCB clearance of slip.
-
30763
55
26
2025-09-02 08:49:19
2025-09-02 17:49:00
2025-09-02 17:35:25
8 hours 46 mins
Opened
Rajendra Kumar ,Assistant Engineer Civil ,410011677
0.18
0.20
Slip/ Landslide
Road closed by Running slip and boulders
-
31735
56
26
2025-09-03 08:47:07
2025-09-03 16:47:00
2025-09-03 16:45:27
7 hours 58 mins
Opened
Rajendra Kumar ,Assistant Engineer Civil ,410011677
0.15
0.18
Slip/ Landslide
Road closed by Running slip and boulders
-
32871
57
26
2025-09-13 08:34:36
2025-09-15 18:34:00
2025-09-15 16:42:37
2 days 8 hours
Opened
Rajendra Kumar ,Assistant Engineer Civil ,410011677
0.18
0.20
Slip/ Landslide
Road closed by Running slip and boulders
-
37136
58
26
2025-09-16 09:21:40
2025-09-16 14:21:40
2025-09-16 18:14:06
8 hours 52 mins
Opened
Rajendra Kumar ,Assistant Engineer Civil ,410011677
0.05
0.06
Slip/ Landslide
Road closed by Running slip and boulders two jcb diployed
-
38115
59
23
2025-06-27 12:30:48
2025-06-27 14:30:48
2025-06-27 20:31:33
8 hours 0 mins
Opened
Rajendra Kumar ,Assistant Engineer Civil ,410011677
0.05
0.06
Slip/ Landslide
Road partially closed by Running boulders and slip
-
2340
60
25
2025-06-27 12:30:48
2025-06-27 14:30:48
2025-06-27 20:56:45
8 hours 25 mins
Opened
Rajendra Kumar ,Assistant Engineer Civil ,410011677
0.05
0.06
Slip/ Landslide
Road partially closed by Running boulders and slip
-
2342
61
25
2025-09-16 09:21:40
2025-09-16 14:21:40
2025-09-16 18:13:48
8 hours 52 mins
Opened
Rajendra Kumar ,Assistant Engineer Civil ,410011677
0.05
0.06
Slip/ Landslide
Road closed by Running slip and boulders two jcb diployed
-
38114
62
28
2025-06-29 12:21:26
2025-06-29 15:21:26
2025-06-29 19:58:57
7 hours 37 mins
Opened
Rajendra Kumar ,Assistant Engineer Civil ,410011677
0.04
0.05
Slip/ Landslide
Road closed by Running boulders and slip
-
3445
63
28
2025-07-16 09:50:11
2025-07-16 12:50:00
2025-07-16 10:59:04
1 hours 8 mins
Opened
Rajendra Kumar ,Assistant Engineer Civil ,410011677
0.23
0.03
Slip/ Landslide
Road partially closed jcb diployed for slip clearance
-
9850
64
28
2025-09-13 08:34:36
2025-09-13 10:34:36
2025-09-13 11:19:41
2 hours 45 mins
Opened
Rajendra Kumar ,Assistant Engineer Civil ,410011677
0.02
0.03
Slip/ Landslide
Road closed by Running slip and boulders
-
37138
65
29
2025-06-29 12:21:26
2025-06-29 15:21:26
2025-06-29 20:09:34
7 hours 48 mins
Opened
Rajendra Kumar ,Assistant Engineer Civil ,410011677
0.04
0.05
Slip/ Landslide
Road closed by Running boulders and slip
-
3446
66
29
2025-07-16 09:50:11
2025-07-16 12:50:00
2025-07-16 10:57:54
1 hours 7 mins
Opened
Rajendra Kumar ,Assistant Engineer Civil ,410011677
0.23
0.03
Slip/ Landslide
Road partially closed jcb diployed for slip clearance
-
9851
67
29
2025-08-06 10:55:51
2025-08-06 11:55:00
2025-08-06 12:21:10
1 hours 25 mins
Opened
Rajendra Kumar ,Assistant Engineer Civil ,410011677
0.50
0.70
Slip/ Landslide
Road closed by Running slip Near boshaan
-
16578
68
29
2025-09-13 08:34:36
2025-09-13 10:34:36
2025-09-13 11:20:18
2 hours 45 mins
Opened
Rajendra Kumar ,Assistant Engineer Civil ,410011677
0.02
0.03
Slip/ Landslide
Road closed by Running slip and boulders
-
37139
69
38
2025-06-30 06:00:24
2025-06-30 08:00:24
2025-06-30 10:00:42
4 hours 0 mins
Opened
Mukesh Saklani ,Assistant Engineer Civil ,65006268
0.10
0.10
Slip/ Landslide
30.520204000000
77.954370000000
3887
70
38
2025-07-16 05:22:09
2025-07-16 08:22:09
2025-07-16 11:09:42
5 hours 47 mins
Opened
Mukesh Saklani ,Assistant Engineer Civil ,65006268
0.01
0.04
Slip/ Landslide
-
9781
71
38
2025-08-04 20:55:59
2025-08-04 20:55:59
2025-08-04 21:30:38
34 mins 39 secs
Opened
Mukesh Saklani ,Assistant Engineer Civil ,65006268
0.10
0.10
Slip/ Landslide
-
15400
72
38
2025-08-06 06:55:12
2025-08-06 07:55:12
2025-08-06 08:50:04
1 hours 54 mins
Opened
Mukesh Saklani ,Assistant Engineer Civil ,65006268
0.20
0.20
Slip/ Landslide
-
16126
73
38
2025-08-11 07:47:59
2025-08-11 07:47:59
2025-08-11 10:17:04
2 hours 29 mins
Opened
Mukesh Saklani ,Assistant Engineer Civil ,65006268
0.10
0.10
Slip/ Landslide
-
19364
74
38
2025-08-15 17:46:24
2025-08-15 18:46:24
2025-08-15 18:57:37
1 hours 11 mins
Opened
Mukesh Saklani ,Assistant Engineer Civil ,65006268
0.10
0.10
Slip/ Landslide
-
22510
75
38
2025-09-13 08:34:36
2025-09-13 10:34:36
2025-09-13 13:00:05
4 hours 25 mins
Opened
Rajendra Kumar ,Assistant Engineer Civil ,410011677
0.02
0.03
Slip/ Landslide
Road closed by Running slip and boulders
-
37148
76
36
2025-07-16 05:22:09
2025-07-16 08:22:09
2025-07-16 11:09:07
5 hours 46 mins
Opened
Mukesh Saklani ,Assistant Engineer Civil ,65006268
0.01
0.04
Slip/ Landslide
-
9779
77
36
2025-09-13 08:34:36
2025-09-13 10:34:36
2025-09-13 12:18:17
3 hours 43 mins
Opened
Rajendra Kumar ,Assistant Engineer Civil ,410011677
0.02
0.03
Slip/ Landslide
Road closed by Running slip and boulders
-
37146
78
37
2025-07-16 05:22:09
2025-07-16 08:22:09
2025-07-16 11:09:30
5 hours 47 mins
Opened
Mukesh Saklani ,Assistant Engineer Civil ,65006268
0.01
0.04
Slip/ Landslide
-
9780
79
37
2025-09-13 08:34:36
2025-09-13 10:34:36
2025-09-13 12:59:24
4 hours 24 mins
Opened
Rajendra Kumar ,Assistant Engineer Civil ,410011677
0.02
0.03
Slip/ Landslide
Road closed by Running slip and boulders
-
37147
80
30
2025-08-01 10:05:54
2025-08-01 15:05:00
2025-08-01 14:42:14
4 hours 36 mins
Opened
Rajendra Kumar ,Assistant Engineer Civil ,410011677
5.00
7.00
Sinking, Retaining Wall Damage
15 m long Retaining wall damaged. R/wall size 15.50x7.00m
Inner side cutting work in progress progress for widening
-
14231
81
30
2025-09-13 08:34:36
2025-09-13 10:34:36
2025-09-13 11:21:15
2 hours 46 mins
Opened
Rajendra Kumar ,Assistant Engineer Civil ,410011677
0.02
0.03
Slip/ Landslide
Road closed by Running slip and boulders
-
37140
82
39
2025-09-01 15:35:14
2025-09-01 15:35:14
2025-09-01 15:46:08
10 mins 54 secs
Opened
Mukesh Saklani ,Assistant Engineer Civil ,65006268
0.10
3.00
Slip/ Landslide, Retaining Wall Damage
Retaining wall (7mx4m) damaged due to landslide.
-
31341
83
39
2025-09-13 08:34:36
2025-09-13 10:34:36
2025-09-13 14:26:35
5 hours 51 mins
Opened
Rajendra Kumar ,Assistant Engineer Civil ,410011677
0.02
0.03
Slip/ Landslide
Road closed by Running slip and boulders
-
37149
84
31
2025-09-13 08:34:36
2025-09-13 10:34:36
2025-09-13 11:21:38
2 hours 47 mins
Opened
Rajendra Kumar ,Assistant Engineer Civil ,410011677
0.02
0.03
Slip/ Landslide
Road closed by Running slip and boulders
-
37141
85
32
2025-09-13 08:34:36
2025-09-13 10:34:36
2025-09-13 11:18:30
2 hours 43 mins
Opened
Rajendra Kumar ,Assistant Engineer Civil ,410011677
0.02
0.03
Slip/ Landslide
Road closed by Running slip and boulders
-
37142
86
33
2025-09-13 08:34:36
2025-09-13 10:34:36
2025-09-13 11:17:34
2 hours 42 mins
Opened
Rajendra Kumar ,Assistant Engineer Civil ,410011677
0.02
0.03
Slip/ Landslide
Road closed by Running slip and boulders
-
37143
87
34
2025-09-13 08:34:36
2025-09-13 10:34:36
2025-09-13 12:17:02
3 hours 42 mins
Opened
Rajendra Kumar ,Assistant Engineer Civil ,410011677
0.02
0.03
Slip/ Landslide
Road closed by Running slip and boulders
-
37144
88
40
2025-09-13 08:34:36
2025-09-13 10:34:36
2025-09-13 14:27:04
5 hours 52 mins
Opened
Rajendra Kumar ,Assistant Engineer Civil ,410011677
0.02
0.03
Slip/ Landslide
Road closed by Running slip and boulders
-
37150
89
41
2025-09-13 08:34:36
2025-09-13 10:34:36
2025-09-13 14:27:37
5 hours 53 mins
Opened
Rajendra Kumar ,Assistant Engineer Civil ,410011677
0.02
0.03
Slip/ Landslide
Road closed by Running slip and boulders
-
37151