चोसला चिल मोटर मार्ग (ID: 6066) , निर्माण खण्ड अल्मोडा , Almora

# KM Closed On Tentative Date Opened On Response Time Open Type Informed By Initial cost Restoration Cost Damage Type Location Chainages Remark PiC geo location lat lng ID
1 5 2025-06-23 09:19:44 2025-06-23 17:19:44 2025-06-23 16:19:57 7 hours 0 mins Opened Alok Kumar Oli ,Assistant Engineer Civil ,750022910 0.04 0.00 Slip/ Landslide road ke kai sthano me mal;wa aane se road ansik roop se band thi jise kholane hetu JCB machine bheji gai hai . - 1386
2 5 2025-07-04 08:12:22 2025-07-04 17:12:22 2025-07-04 17:43:11 9 hours 30 mins Opened Alok Kumar Oli ,Assistant Engineer Civil ,750022910 0.06 0.00 Slip/ Landslide marg ke kai sthano me malwa aane se mar aansik roop se band hai .marg kholne hetu JCB machine bhej di gai hai. - 6280
3 5 2025-07-09 07:57:57 2025-07-09 16:57:57 2025-07-09 16:37:05 8 hours 39 mins Opened Alok Kumar Oli ,Assistant Engineer Civil ,750022910 0.08 0.08 Slip/ Landslide The road is partially closed due to the arrival of Malwa at many places on the road and the drains on the road have been blocked. Water is flowing on the road.JCB machine has been sent to open the route. - 7521
4 5 2025-07-19 09:02:31 2025-07-19 18:02:31 2025-07-19 17:10:36 8 hours 8 mins Opened Alok Kumar Oli ,Assistant Engineer Civil ,750022910 0.08 0.08 Slip/ Landslide The road is partially closed and the drains are completely blocked due to the occurrence of Manwa at many places on the route. JCB machine has been sent to open the route. - 10679
5 5 2025-07-21 06:30:34 2025-07-21 13:30:34 2025-07-21 15:40:17 9 hours 9 mins Opened Alok Kumar Oli ,Assistant Engineer Civil ,750022910 0.03 0.00 Slip/ Landslide Road closed at km 3,4,6,8,9 - 10971
6 5 2025-07-27 08:56:45 2025-07-27 17:56:45 2025-07-27 16:46:57 7 hours 50 mins Opened Alok Kumar Oli ,Assistant Engineer Civil ,750022910 0.08 0.08 Slip/ Landslide The road is partially closed due to landslides at many places and the drains are completely blocked. JCB has been sent to open the road and drains. - 13284
7 5 2025-08-06 08:26:54 2025-08-06 12:26:54 2025-08-06 17:27:33 9 hours 0 mins Opened Alok Kumar Oli ,Assistant Engineer Civil ,750022910 0.04 0.00 Slip/ Landslide Road closed due to slip at km 4,6,8 (km 6 critical point) - 16211
8 5 2025-08-11 14:40:56 2025-08-11 19:40:56 2025-08-11 19:33:16 4 hours 52 mins Opened Alok Kumar Oli ,Assistant Engineer Civil ,750022910 0.07 0.00 Slip/ Landslide, Sinking, Fludding Road closed at km 5,6,7 (km 6,7 is critical sliding and sinking point) - 19954
9 5 2025-08-12 07:26:44 2025-08-12 12:26:44 2025-08-12 15:10:27 7 hours 43 mins Opened Alok Kumar Oli ,Assistant Engineer Civil ,750022910 0.06 5.00 Slip/ Landslide, Washout, Sinking, Fludding Road closed at km 5,6,7,8 due to slip, sinking and fludding. Km 6,7 is critical point - 20142
10 5 2025-08-14 09:26:39 2025-08-14 15:26:39 2025-08-15 17:41:10 1 days 8 hours Opened Alok Kumar Oli ,Assistant Engineer Civil ,750022910 0.05 6.25 Slip/ Landslide, Washout Road closed at km 5,6,7,8 closed due to slip and km 6,7 is critical point. Road sinking at km 6,7. - 21509
11 5 2025-08-16 08:27:45 2025-08-16 13:27:45 2025-08-16 19:11:06 10 hours 43 mins Opened Alok Kumar Oli ,Assistant Engineer Civil ,750022910 0.05 5.00 Slip/ Landslide, Washout Road closed at km 5,6,7,8 (km 6,7 critical sinking point) - 22591
12 5 2025-09-02 09:22:39 2025-09-02 13:22:39 2025-09-04 10:30:29 2 days 1 hours Opened Alok Kumar Oli ,Assistant Engineer Civil ,750022910 0.05 6.25 Slip/ Landslide Road closed due to slip and mud at km 5,6,7,8. - 31800
13 6 2025-06-23 09:19:44 2025-06-23 17:19:44 2025-06-23 16:20:02 7 hours 0 mins Opened Alok Kumar Oli ,Assistant Engineer Civil ,750022910 0.04 0.00 Slip/ Landslide road ke kai sthano me mal;wa aane se road ansik roop se band thi jise kholane hetu JCB machine bheji gai hai . - 1387
14 6 2025-07-04 08:12:22 2025-07-04 17:12:22 2025-07-04 17:43:17 9 hours 30 mins Opened Alok Kumar Oli ,Assistant Engineer Civil ,750022910 0.06 0.00 Slip/ Landslide marg ke kai sthano me malwa aane se mar aansik roop se band hai .marg kholne hetu JCB machine bhej di gai hai. - 6281
15 6 2025-07-09 07:57:57 2025-07-09 16:57:57 2025-07-09 16:37:14 8 hours 39 mins Opened Alok Kumar Oli ,Assistant Engineer Civil ,750022910 0.08 0.08 Slip/ Landslide The road is partially closed due to the arrival of Malwa at many places on the road and the drains on the road have been blocked. Water is flowing on the road.JCB machine has been sent to open the route. - 7522
16 6 2025-07-19 09:02:31 2025-07-19 18:02:31 2025-07-19 17:10:46 8 hours 8 mins Opened Alok Kumar Oli ,Assistant Engineer Civil ,750022910 0.08 0.08 Slip/ Landslide The road is partially closed and the drains are completely blocked due to the occurrence of Manwa at many places on the route. JCB machine has been sent to open the route. - 10680
17 6 2025-07-21 06:30:34 2025-07-21 13:30:34 2025-07-21 15:41:57 9 hours 11 mins Opened Alok Kumar Oli ,Assistant Engineer Civil ,750022910 0.03 0.00 Slip/ Landslide Road closed at km 3,4,6,8,9 - 10972
18 6 2025-07-27 08:56:45 2025-07-27 17:56:45 2025-07-27 16:48:00 7 hours 51 mins Opened Alok Kumar Oli ,Assistant Engineer Civil ,750022910 0.08 0.08 Slip/ Landslide The road is partially closed due to landslides at many places and the drains are completely blocked. JCB has been sent to open the road and drains. - 13285
19 6 2025-07-29 09:24:38 2025-07-29 14:24:00 2025-08-01 14:57:01 3 days 5 hours Opened Alok Kumar Oli ,Assistant Engineer Civil ,750022910 0.30 25.00 Slip/ Landslide, Fludding Road closed falling a tree km 6, km 6,7,8 closed due to land slide and malwa. - 13559
20 6 2025-08-06 08:26:54 2025-08-06 12:26:00 2025-08-08 10:09:07 2 days 1 hours Opened Alok Kumar Oli ,Assistant Engineer Civil ,750022910 0.10 25.00 Slip/ Landslide, Washout, Sinking Road closed due to slip at km 6,8 (km 6 critical point) km 6 60 m part of road washout and sinking. - 16212
21 6 2025-08-11 14:40:56 2025-08-11 19:40:56 2025-08-11 19:33:41 4 hours 52 mins Opened Alok Kumar Oli ,Assistant Engineer Civil ,750022910 0.07 0.00 Slip/ Landslide, Sinking, Fludding Road closed at km 5,6,7 (km 6,7 is critical sliding and sinking point) - 19955
22 6 2025-08-12 07:26:44 2025-08-12 12:26:44 2025-08-12 15:10:42 7 hours 43 mins Opened Alok Kumar Oli ,Assistant Engineer Civil ,750022910 0.06 5.00 Slip/ Landslide, Washout, Sinking, Fludding Road closed at km 5,6,7,8 due to slip, sinking and fludding. Km 6,7 is critical point - 20143
23 6 2025-08-14 09:26:39 2025-08-14 15:26:39 2025-08-15 17:41:30 1 days 8 hours Opened Alok Kumar Oli ,Assistant Engineer Civil ,750022910 0.05 6.25 Slip/ Landslide, Washout Road closed at km 5,6,7,8 closed due to slip and km 6,7 is critical point. Road sinking at km 6,7. - 21510
24 6 2025-08-16 08:27:45 2025-08-16 13:27:45 2025-08-16 19:11:27 10 hours 43 mins Opened Alok Kumar Oli ,Assistant Engineer Civil ,750022910 0.05 5.00 Slip/ Landslide, Washout Road closed at km 5,6,7,8 (km 6,7 critical sinking point) - 22592
25 6 2025-08-18 07:14:07 2025-08-18 12:14:07 2025-08-18 18:49:47 11 hours 35 mins Opened Alok Kumar Oli ,Assistant Engineer Civil ,750022910 0.06 6.25 Slip/ Landslide, Washout, Sinking Road closed at km 6,7,8,9 due to slip, land slide and sinking of road. - 23577
26 6 2025-08-21 09:36:30 2025-08-21 13:36:30 2025-08-21 16:58:59 7 hours 22 mins Opened Alok Kumar Oli ,Assistant Engineer Civil ,750022910 0.05 6.67 Slip/ Landslide, Sinking Road closed due to slip at km 6,7,8 - 25565
27 6 2025-08-23 08:14:52 2025-08-23 13:14:52 2025-08-24 13:23:16 1 days 5 hours Opened Alok Kumar Oli ,Assistant Engineer Civil ,750022910 0.05 8.33 Slip/ Landslide Road closed at km 6,7,8 due to slip - 26456
28 6 2025-08-27 07:52:06 2025-08-27 11:52:06 2025-08-27 16:25:31 8 hours 33 mins Opened Alok Kumar Oli ,Assistant Engineer Civil ,750022910 0.05 6.67 Slip/ Landslide, Washout, Sinking Road closed at km 6,7,8 due to slip and sinking of road. - 28217
29 6 2025-08-29 08:55:12 2025-08-29 13:55:12 2025-08-29 17:07:30 8 hours 12 mins Opened Alok Kumar Oli ,Assistant Engineer Civil ,750022910 0.05 6.25 Slip/ Landslide, Sinking Road closed at km 6,7,8,9 - 28915
30 6 2025-08-31 10:28:56 2025-08-31 15:28:56 2025-08-31 19:44:45 9 hours 15 mins Opened Alok Kumar Oli ,Assistant Engineer Civil ,750022910 0.07 8.33 Slip/ Landslide, Sinking Road closed at km 6,7,8 due to slip - 30289
31 6 2025-09-01 09:43:57 2025-09-01 13:43:00 2025-09-04 10:31:13 3 days 0 hours Opened Alok Kumar Oli ,Assistant Engineer Civil ,750022910 0.07 8.33 Slip/ Landslide, Sinking Road closed at km 6,7,8 - 30719
32 6 2025-09-12 09:17:03 2025-09-12 12:17:03 2025-09-12 15:17:10 6 hours 0 mins Opened Alok Kumar Oli ,Assistant Engineer Civil ,750022910 0.07 0.00 Slip/ Landslide, Sinking road closed due to slip - 36885
33 6 2025-09-13 08:11:41 2025-09-13 13:11:41 2025-09-13 15:41:20 7 hours 29 mins Opened Alok Kumar Oli ,Assistant Engineer Civil ,750022910 0.05 0.00 Slip/ Landslide, Sinking road closed due to slip - 37127
34 6 2025-09-14 15:47:02 2025-09-14 20:47:02 2025-09-14 20:56:44 5 hours 9 mins Opened Alok Kumar Oli ,Assistant Engineer Civil ,750022910 0.07 0.00 Slip/ Landslide, Sinking road closed due to slip - 37548
35 6 2025-10-06 10:59:28 2025-10-06 14:59:28 2025-10-07 10:46:24 23 hours 46 mins Opened Alok Kumar Oli ,Assistant Engineer Civil ,750022910 0.07 0.00 Slip/ Landslide Road closed due to slip - 40950
36 6 2025-10-07 12:07:50 2025-10-07 17:07:50 2025-10-08 10:15:47 22 hours 7 mins Opened Alok Kumar Oli ,Assistant Engineer Civil ,750022910 0.07 0.00 Slip/ Landslide Road closed due to slip and mud - 40985
37 7 2025-06-23 09:19:44 2025-06-23 17:19:44 2025-06-23 16:20:13 7 hours 0 mins Opened Alok Kumar Oli ,Assistant Engineer Civil ,750022910 0.04 0.00 Slip/ Landslide road ke kai sthano me mal;wa aane se road ansik roop se band thi jise kholane hetu JCB machine bheji gai hai . - 1388
38 7 2025-07-04 08:12:22 2025-07-04 17:12:22 2025-07-04 17:43:26 9 hours 31 mins Opened Alok Kumar Oli ,Assistant Engineer Civil ,750022910 0.06 0.00 Slip/ Landslide marg ke kai sthano me malwa aane se mar aansik roop se band hai .marg kholne hetu JCB machine bhej di gai hai. - 6282
39 7 2025-07-19 09:02:31 2025-07-19 18:02:31 2025-07-19 17:10:55 8 hours 8 mins Opened Alok Kumar Oli ,Assistant Engineer Civil ,750022910 0.08 0.08 Slip/ Landslide The road is partially closed and the drains are completely blocked due to the occurrence of Manwa at many places on the route. JCB machine has been sent to open the route. - 10681
40 7 2025-07-21 06:30:34 2025-07-21 13:30:34 2025-07-21 15:42:34 9 hours 12 mins Opened Alok Kumar Oli ,Assistant Engineer Civil ,750022910 0.03 0.00 Slip/ Landslide Road closed at km 3,4,6,8,9 - 10973
41 7 2025-07-27 08:50:17 2025-07-27 13:50:17 2025-07-27 16:48:39 7 hours 58 mins Opened Alok Kumar Oli ,Assistant Engineer Civil ,750022910 0.07 0.00 Scupper/ Culvert Damage, Fludding Road closed at km 7,8,9 due to slip and mud. - 13235
42 7 2025-07-29 09:24:38 2025-07-29 14:24:38 2025-08-06 17:30:14 8 days 8 hours Opened Alok Kumar Oli ,Assistant Engineer Civil ,750022910 0.06 0.00 Slip/ Landslide, Fludding Road closed falling a tree km 6, km 6,7,8 closed due to land slide and malwa. - 13560
43 7 2025-08-11 14:40:56 2025-08-11 19:40:56 2025-08-11 19:33:59 4 hours 53 mins Opened Alok Kumar Oli ,Assistant Engineer Civil ,750022910 0.07 0.00 Slip/ Landslide, Sinking, Fludding Road closed at km 5,6,7 (km 6,7 is critical sliding and sinking point) - 19956
44 7 2025-08-12 07:26:44 2025-08-12 12:26:44 2025-08-12 15:10:55 7 hours 44 mins Opened Alok Kumar Oli ,Assistant Engineer Civil ,750022910 0.06 5.00 Slip/ Landslide, Washout, Sinking, Fludding Road closed at km 5,6,7,8 due to slip, sinking and fludding. Km 6,7 is critical point - 20144
45 7 2025-08-14 09:26:39 2025-08-14 15:26:39 2025-08-15 17:41:45 1 days 8 hours Opened Alok Kumar Oli ,Assistant Engineer Civil ,750022910 0.05 6.25 Slip/ Landslide, Washout Road closed at km 5,6,7,8 closed due to slip and km 6,7 is critical point. Road sinking at km 6,7. - 21511
46 7 2025-08-16 08:27:45 2025-08-16 13:27:45 2025-08-16 19:11:47 10 hours 44 mins Opened Alok Kumar Oli ,Assistant Engineer Civil ,750022910 0.05 5.00 Slip/ Landslide, Washout Road closed at km 5,6,7,8 (km 6,7 critical sinking point) - 22593
47 7 2025-08-18 07:14:07 2025-08-18 12:14:07 2025-08-18 18:50:07 11 hours 36 mins Opened Alok Kumar Oli ,Assistant Engineer Civil ,750022910 0.06 6.25 Slip/ Landslide, Washout, Sinking Road closed at km 6,7,8,9 due to slip, land slide and sinking of road. - 23578
48 7 2025-08-21 09:36:30 2025-08-21 13:36:30 2025-08-21 16:59:20 7 hours 22 mins Opened Alok Kumar Oli ,Assistant Engineer Civil ,750022910 0.05 6.67 Slip/ Landslide, Sinking Road closed due to slip at km 6,7,8 - 25566
49 7 2025-08-23 08:14:52 2025-08-23 13:14:52 2025-08-24 13:27:53 1 days 5 hours Opened Alok Kumar Oli ,Assistant Engineer Civil ,750022910 0.05 8.33 Slip/ Landslide Road closed at km 6,7,8 due to slip - 26457
50 7 2025-08-27 07:52:06 2025-08-27 11:52:06 2025-08-27 16:26:09 8 hours 34 mins Opened Alok Kumar Oli ,Assistant Engineer Civil ,750022910 0.05 6.67 Slip/ Landslide, Washout, Sinking Road closed at km 6,7,8 due to slip and sinking of road. - 28218
51 7 2025-08-29 08:55:12 2025-08-29 13:55:12 2025-08-29 17:07:41 8 hours 12 mins Opened Alok Kumar Oli ,Assistant Engineer Civil ,750022910 0.05 6.25 Slip/ Landslide, Sinking Road closed at km 6,7,8,9 - 28916
52 7 2025-08-31 10:28:56 2025-08-31 15:28:56 2025-08-31 19:45:13 9 hours 16 mins Opened Alok Kumar Oli ,Assistant Engineer Civil ,750022910 0.07 8.33 Slip/ Landslide, Sinking Road closed at km 6,7,8 due to slip - 30290
53 7 2025-09-01 09:43:57 2025-09-01 13:43:57 2025-09-01 19:24:53 9 hours 40 mins Opened Alok Kumar Oli ,Assistant Engineer Civil ,750022910 0.07 8.33 Slip/ Landslide, Sinking Road closed at km 6,7,8 - 30720
54 7 2025-09-02 09:22:39 2025-09-02 13:22:39 2025-09-04 10:31:39 2 days 1 hours Opened Alok Kumar Oli ,Assistant Engineer Civil ,750022910 0.05 6.25 Slip/ Landslide Road closed due to slip and mud at km 5,6,7,8. - 31801
55 7 2025-09-12 09:17:03 2025-09-12 12:17:03 2025-09-12 15:17:20 6 hours 0 mins Opened Alok Kumar Oli ,Assistant Engineer Civil ,750022910 0.07 0.00 Slip/ Landslide, Sinking road closed due to slip - 36886
56 7 2025-09-13 08:11:41 2025-09-13 13:11:41 2025-09-13 15:41:42 7 hours 30 mins Opened Alok Kumar Oli ,Assistant Engineer Civil ,750022910 0.05 0.00 Slip/ Landslide, Sinking road closed due to slip - 37128
57 7 2025-09-14 15:47:02 2025-09-14 20:47:02 2025-09-14 20:57:07 5 hours 10 mins Opened Alok Kumar Oli ,Assistant Engineer Civil ,750022910 0.07 0.00 Slip/ Landslide, Sinking road closed due to slip - 37549
58 7 2025-10-06 10:59:28 2025-10-06 14:59:28 2025-10-07 10:46:47 23 hours 47 mins Opened Alok Kumar Oli ,Assistant Engineer Civil ,750022910 0.07 0.00 Slip/ Landslide Road closed due to slip - 40951
59 7 2025-10-07 12:07:50 2025-10-07 17:07:50 2025-10-08 10:16:06 22 hours 8 mins Opened Alok Kumar Oli ,Assistant Engineer Civil ,750022910 0.07 0.00 Slip/ Landslide Road closed due to slip and mud - 40986
60 8 2025-06-23 09:19:44 2025-06-23 17:19:44 2025-06-23 16:20:20 7 hours 0 mins Opened Alok Kumar Oli ,Assistant Engineer Civil ,750022910 0.04 0.00 Slip/ Landslide road ke kai sthano me mal;wa aane se road ansik roop se band thi jise kholane hetu JCB machine bheji gai hai . - 1389
61 8 2025-06-25 10:01:59 2025-06-25 16:01:59 2025-06-25 18:07:18 8 hours 5 mins Opened Alok Kumar Oli ,Assistant Engineer Civil ,750022910 0.05 0.21 Slip/ Landslide, Retaining Wall Damage Km 8,9,10,11 me slip aane se road closed. - 1728
62 8 2025-07-04 08:12:22 2025-07-04 17:12:22 2025-07-04 17:43:32 9 hours 31 mins Opened Alok Kumar Oli ,Assistant Engineer Civil ,750022910 0.06 0.00 Slip/ Landslide marg ke kai sthano me malwa aane se mar aansik roop se band hai .marg kholne hetu JCB machine bhej di gai hai. - 6283
63 8 2025-07-21 06:30:34 2025-07-21 13:30:34 2025-07-21 15:42:59 9 hours 12 mins Opened Alok Kumar Oli ,Assistant Engineer Civil ,750022910 0.03 0.00 Slip/ Landslide Road closed at km 3,4,6,8,9 - 10974
64 8 2025-07-27 08:50:17 2025-07-27 13:50:17 2025-07-27 16:49:15 7 hours 58 mins Opened Alok Kumar Oli ,Assistant Engineer Civil ,750022910 0.07 0.00 Scupper/ Culvert Damage, Fludding Road closed at km 7,8,9 due to slip and mud. - 13236
65 8 2025-07-29 09:24:38 2025-07-29 14:24:38 2025-08-01 14:58:55 3 days 5 hours Opened Alok Kumar Oli ,Assistant Engineer Civil ,750022910 0.06 0.00 Slip/ Landslide, Fludding Road closed falling a tree km 6, km 6,7,8 closed due to land slide and malwa. - 13561
66 8 2025-08-06 08:26:54 2025-08-06 12:26:54 2025-08-06 17:26:19 8 hours 59 mins Opened Alok Kumar Oli ,Assistant Engineer Civil ,750022910 0.04 0.00 Slip/ Landslide Road closed due to slip at km 4,6,8 (km 6 critical point) - 16213
67 8 2025-08-12 07:26:44 2025-08-12 12:26:44 2025-08-12 15:11:10 7 hours 44 mins Opened Alok Kumar Oli ,Assistant Engineer Civil ,750022910 0.06 5.00 Slip/ Landslide, Washout, Sinking, Fludding Road closed at km 5,6,7,8 due to slip, sinking and fludding. Km 6,7 is critical point - 20145
68 8 2025-08-14 09:26:39 2025-08-14 15:26:39 2025-08-15 17:42:02 1 days 8 hours Opened Alok Kumar Oli ,Assistant Engineer Civil ,750022910 0.05 6.25 Slip/ Landslide, Washout Road closed at km 5,6,7,8 closed due to slip and km 6,7 is critical point. Road sinking at km 6,7. - 21512
69 8 2025-08-16 08:27:45 2025-08-16 13:27:45 2025-08-16 19:12:05 10 hours 44 mins Opened Alok Kumar Oli ,Assistant Engineer Civil ,750022910 0.05 5.00 Slip/ Landslide, Washout Road closed at km 5,6,7,8 (km 6,7 critical sinking point) - 22594
70 8 2025-08-18 07:14:07 2025-08-18 12:14:07 2025-08-18 18:50:32 11 hours 36 mins Opened Alok Kumar Oli ,Assistant Engineer Civil ,750022910 0.06 6.25 Slip/ Landslide, Washout, Sinking Road closed at km 6,7,8,9 due to slip, land slide and sinking of road. - 23579
71 8 2025-08-21 09:36:30 2025-08-21 13:36:30 2025-08-21 16:59:38 7 hours 23 mins Opened Alok Kumar Oli ,Assistant Engineer Civil ,750022910 0.05 6.67 Slip/ Landslide, Sinking Road closed due to slip at km 6,7,8 - 25567
72 8 2025-08-23 08:14:52 2025-08-23 13:14:52 2025-08-24 13:37:56 1 days 5 hours Opened Alok Kumar Oli ,Assistant Engineer Civil ,750022910 0.05 8.33 Slip/ Landslide Road closed at km 6,7,8 due to slip - 26458
73 8 2025-08-27 07:52:06 2025-08-27 11:52:06 2025-08-27 16:25:50 8 hours 33 mins Opened Alok Kumar Oli ,Assistant Engineer Civil ,750022910 0.05 6.67 Slip/ Landslide, Washout, Sinking Road closed at km 6,7,8 due to slip and sinking of road. - 28219
74 8 2025-08-29 08:55:12 2025-08-29 13:55:12 2025-08-29 17:07:51 8 hours 12 mins Opened Alok Kumar Oli ,Assistant Engineer Civil ,750022910 0.05 6.25 Slip/ Landslide, Sinking Road closed at km 6,7,8,9 - 28917
75 8 2025-08-31 10:28:56 2025-08-31 15:28:56 2025-08-31 19:45:43 9 hours 16 mins Opened Alok Kumar Oli ,Assistant Engineer Civil ,750022910 0.07 8.33 Slip/ Landslide, Sinking Road closed at km 6,7,8 due to slip - 30291
76 8 2025-09-01 09:43:57 2025-09-01 13:43:57 2025-09-01 19:25:22 9 hours 41 mins Opened Alok Kumar Oli ,Assistant Engineer Civil ,750022910 0.07 8.33 Slip/ Landslide, Sinking Road closed at km 6,7,8 - 30721
77 8 2025-09-02 09:22:39 2025-09-02 13:22:39 2025-09-04 10:32:01 2 days 1 hours Opened Alok Kumar Oli ,Assistant Engineer Civil ,750022910 0.05 6.25 Slip/ Landslide Road closed due to slip and mud at km 5,6,7,8. - 31802
78 8 2025-09-12 09:17:03 2025-09-12 12:17:03 2025-09-12 15:17:29 6 hours 0 mins Opened Alok Kumar Oli ,Assistant Engineer Civil ,750022910 0.07 0.00 Slip/ Landslide, Sinking road closed due to slip - 36887
79 8 2025-09-13 08:11:41 2025-09-13 13:11:41 2025-09-13 15:42:12 7 hours 30 mins Opened Alok Kumar Oli ,Assistant Engineer Civil ,750022910 0.05 0.00 Slip/ Landslide, Sinking road closed due to slip - 37129
80 8 2025-09-14 15:47:02 2025-09-14 20:47:02 2025-09-14 20:57:35 5 hours 10 mins Opened Alok Kumar Oli ,Assistant Engineer Civil ,750022910 0.07 0.00 Slip/ Landslide, Sinking road closed due to slip - 37550
81 8 2025-10-06 10:59:28 2025-10-06 14:59:28 2025-10-07 10:47:11 23 hours 47 mins Opened Alok Kumar Oli ,Assistant Engineer Civil ,750022910 0.07 0.00 Slip/ Landslide Road closed due to slip - 40952
82 8 2025-10-07 12:07:50 2025-10-07 17:07:50 2025-10-08 10:16:26 22 hours 8 mins Opened Alok Kumar Oli ,Assistant Engineer Civil ,750022910 0.07 0.00 Slip/ Landslide Road closed due to slip and mud - 40987
83 9 2025-06-25 10:01:59 2025-06-25 16:01:59 2025-06-25 18:07:45 8 hours 5 mins Opened Alok Kumar Oli ,Assistant Engineer Civil ,750022910 0.05 0.21 Slip/ Landslide, Retaining Wall Damage Km 8,9,10,11 me slip aane se road closed. - 1729
84 9 2025-07-21 06:30:34 2025-07-21 13:30:34 2025-07-21 15:39:33 9 hours 8 mins Opened Alok Kumar Oli ,Assistant Engineer Civil ,750022910 0.03 0.00 Slip/ Landslide Road closed at km 3,4,6,8,9 - 10975
85 9 2025-07-27 08:50:17 2025-07-27 13:50:17 2025-07-27 16:47:43 7 hours 57 mins Opened Alok Kumar Oli ,Assistant Engineer Civil ,750022910 0.07 0.00 Scupper/ Culvert Damage, Fludding Road closed at km 7,8,9 due to slip and mud. - 13237
86 9 2025-07-29 09:24:38 2025-07-29 14:24:38 2025-08-01 14:56:07 3 days 5 hours Opened Alok Kumar Oli ,Assistant Engineer Civil ,750022910 0.06 0.00 Slip/ Landslide, Fludding Road closed falling a tree km 6, km 6,7,8 closed due to land slide and malwa. - 13562
87 9 2025-08-18 07:14:07 2025-08-18 12:14:07 2025-08-18 18:50:50 11 hours 36 mins Opened Alok Kumar Oli ,Assistant Engineer Civil ,750022910 0.06 6.25 Slip/ Landslide, Washout, Sinking Road closed at km 6,7,8,9 due to slip, land slide and sinking of road. - 23580
88 9 2025-08-29 08:55:12 2025-08-29 13:55:12 2025-08-29 17:08:00 8 hours 12 mins Opened Alok Kumar Oli ,Assistant Engineer Civil ,750022910 0.05 6.25 Slip/ Landslide, Sinking Road closed at km 6,7,8,9 - 28918
89 9 2025-09-04 07:45:29 2025-09-04 18:45:29 2025-09-05 09:51:43 1 days 2 hours Opened Alok Kumar Oli ,Assistant Engineer Civil ,750022910 0.04 0.04 Slip/ Landslide The road is partially closed due to landslides at many places and the drains are completely blocked. JCB has been sent to open the road - 33743
90 9 2025-09-13 08:11:41 2025-09-13 13:11:41 2025-09-13 15:42:35 7 hours 30 mins Opened Alok Kumar Oli ,Assistant Engineer Civil ,750022910 0.05 0.00 Slip/ Landslide, Sinking road closed due to slip - 37130
91 10 2025-06-25 10:01:59 2025-06-25 16:01:59 2025-06-25 18:08:08 8 hours 6 mins Opened Alok Kumar Oli ,Assistant Engineer Civil ,750022910 0.05 0.21 Slip/ Landslide, Retaining Wall Damage Km 8,9,10,11 me slip aane se road closed. - 1730
92 10 2025-09-04 07:45:29 2025-09-04 18:45:29 2025-09-05 09:51:59 1 days 2 hours Opened Alok Kumar Oli ,Assistant Engineer Civil ,750022910 0.04 0.04 Slip/ Landslide The road is partially closed due to landslides at many places and the drains are completely blocked. JCB has been sent to open the road - 33744
93 11 2025-06-25 10:01:59 2025-06-25 16:01:59 2025-06-25 18:08:34 8 hours 6 mins Opened Alok Kumar Oli ,Assistant Engineer Civil ,750022910 0.05 0.21 Slip/ Landslide, Retaining Wall Damage Km 8,9,10,11 me slip aane se road closed. - 1731
94 11 2025-09-04 07:45:29 2025-09-04 18:45:29 2025-09-05 09:52:15 1 days 2 hours Opened Alok Kumar Oli ,Assistant Engineer Civil ,750022910 0.04 0.04 Slip/ Landslide The road is partially closed due to landslides at many places and the drains are completely blocked. JCB has been sent to open the road - 33745
95 4 2025-07-09 07:57:57 2025-07-09 16:57:57 2025-07-09 16:36:55 8 hours 38 mins Opened Alok Kumar Oli ,Assistant Engineer Civil ,750022910 0.08 0.08 Slip/ Landslide The road is partially closed due to the arrival of Malwa at many places on the road and the drains on the road have been blocked. Water is flowing on the road.JCB machine has been sent to open the route. - 7520
96 4 2025-07-21 06:30:34 2025-07-21 13:30:34 2025-07-21 15:37:21 9 hours 6 mins Opened Alok Kumar Oli ,Assistant Engineer Civil ,750022910 0.03 0.00 Slip/ Landslide Road closed at km 3,4,6,8,9 - 10970
97 4 2025-09-03 08:14:00 2025-09-03 13:14:00 2025-09-03 20:09:24 11 hours 55 mins Opened Alok Kumar Oli ,Assistant Engineer Civil ,750022910 0.03 4.17 Slip/ Landslide, Washout, Sinking Road closed at km 3,4,5,6,7,8 - 32820
98 3 2025-09-03 08:14:00 2025-09-03 13:14:00 2025-09-03 20:09:08 11 hours 55 mins Opened Alok Kumar Oli ,Assistant Engineer Civil ,750022910 0.03 4.17 Slip/ Landslide, Washout, Sinking Road closed at km 3,4,5,6,7,8 - 32819
99 12 2025-09-04 07:45:29 2025-09-04 18:45:29 2025-09-05 09:52:30 1 days 2 hours Opened Alok Kumar Oli ,Assistant Engineer Civil ,750022910 0.04 0.04 Slip/ Landslide The road is partially closed due to landslides at many places and the drains are completely blocked. JCB has been sent to open the road - 33746
100 13 2025-09-04 07:45:29 2025-09-04 18:45:29 2025-09-05 09:52:46 1 days 2 hours Opened Alok Kumar Oli ,Assistant Engineer Civil ,750022910 0.04 0.04 Slip/ Landslide The road is partially closed due to landslides at many places and the drains are completely blocked. JCB has been sent to open the road - 33747
Total: 5.90 308.76

Current Road KM Closures (as on 04 Nov 2025)

KM Tentative Opening Date Status
Road is open.