1 |
5 |
2025-06-23 09:19:44 |
2025-06-23 17:19:44
|
2025-06-23 16:19:57 |
7 hours 0 mins |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.04 |
0.00 |
Slip/ Landslide
|
|
|
road ke kai sthano me mal;wa aane se road ansik roop se band thi jise kholane hetu JCB machine bheji gai hai . |
|
-
|
|
|
1386 |
2 |
5 |
2025-07-04 08:12:22 |
2025-07-04 17:12:22
|
2025-07-04 17:43:11 |
9 hours 30 mins |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.06 |
0.00 |
Slip/ Landslide
|
|
|
marg ke kai sthano me malwa aane se mar aansik roop se band hai .marg kholne hetu JCB machine bhej di gai hai. |
|
-
|
|
|
6280 |
3 |
5 |
2025-07-09 07:57:57 |
2025-07-09 16:57:57
|
2025-07-09 16:37:05 |
8 hours 39 mins |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.08 |
0.08 |
Slip/ Landslide
|
|
|
The road is partially closed due to the arrival of Malwa at many places on the road and the drains on the road have been blocked. Water is flowing on the road.JCB machine has been sent to open the route. |
|
-
|
|
|
7521 |
4 |
5 |
2025-07-19 09:02:31 |
2025-07-19 18:02:31
|
2025-07-19 17:10:36 |
8 hours 8 mins |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.08 |
0.08 |
Slip/ Landslide
|
|
|
The road is partially closed and the drains are completely blocked due to the occurrence of Manwa at many places on the route. JCB machine has been sent to open the route. |
|
-
|
|
|
10679 |
5 |
5 |
2025-07-21 06:30:34 |
2025-07-21 13:30:34
|
2025-07-21 15:40:17 |
9 hours 9 mins |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.03 |
0.00 |
Slip/ Landslide
|
|
|
Road closed at km 3,4,6,8,9 |
|
-
|
|
|
10971 |
6 |
5 |
2025-07-27 08:56:45 |
2025-07-27 17:56:45
|
2025-07-27 16:46:57 |
7 hours 50 mins |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.08 |
0.08 |
Slip/ Landslide
|
|
|
The road is partially closed due to landslides at many places and the drains are completely blocked. JCB has been sent to open the road and drains. |
|
-
|
|
|
13284 |
7 |
5 |
2025-08-06 08:26:54 |
2025-08-06 12:26:54
|
2025-08-06 17:27:33 |
9 hours 0 mins |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.04 |
0.00 |
Slip/ Landslide
|
|
|
Road closed due to slip at km 4,6,8 (km 6 critical point) |
|
-
|
|
|
16211 |
8 |
5 |
2025-08-11 14:40:56 |
2025-08-11 19:40:56
|
2025-08-11 19:33:16 |
4 hours 52 mins |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.07 |
0.00 |
Slip/ Landslide, Sinking, Fludding
|
|
|
Road closed at km 5,6,7 (km 6,7 is critical sliding and sinking point) |
|
-
|
|
|
19954 |
9 |
5 |
2025-08-12 07:26:44 |
2025-08-12 12:26:44
|
2025-08-12 15:10:27 |
7 hours 43 mins |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.06 |
5.00 |
Slip/ Landslide, Washout, Sinking, Fludding
|
|
|
Road closed at km 5,6,7,8 due to slip, sinking and fludding. Km 6,7 is critical point |
|
-
|
|
|
20142 |
10 |
5 |
2025-08-14 09:26:39 |
2025-08-14 15:26:39
|
2025-08-15 17:41:10 |
1 days 8 hours |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.05 |
6.25 |
Slip/ Landslide, Washout
|
|
|
Road closed at km 5,6,7,8 closed due to slip and km 6,7 is critical point. Road sinking at km 6,7. |
|
-
|
|
|
21509 |
11 |
5 |
2025-08-16 08:27:45 |
2025-08-16 13:27:45
|
2025-08-16 19:11:06 |
10 hours 43 mins |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.05 |
5.00 |
Slip/ Landslide, Washout
|
|
|
Road closed at km 5,6,7,8 (km 6,7 critical sinking point) |
|
-
|
|
|
22591 |
12 |
6 |
2025-06-23 09:19:44 |
2025-06-23 17:19:44
|
2025-06-23 16:20:02 |
7 hours 0 mins |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.04 |
0.00 |
Slip/ Landslide
|
|
|
road ke kai sthano me mal;wa aane se road ansik roop se band thi jise kholane hetu JCB machine bheji gai hai . |
|
-
|
|
|
1387 |
13 |
6 |
2025-07-04 08:12:22 |
2025-07-04 17:12:22
|
2025-07-04 17:43:17 |
9 hours 30 mins |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.06 |
0.00 |
Slip/ Landslide
|
|
|
marg ke kai sthano me malwa aane se mar aansik roop se band hai .marg kholne hetu JCB machine bhej di gai hai. |
|
-
|
|
|
6281 |
14 |
6 |
2025-07-09 07:57:57 |
2025-07-09 16:57:57
|
2025-07-09 16:37:14 |
8 hours 39 mins |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.08 |
0.08 |
Slip/ Landslide
|
|
|
The road is partially closed due to the arrival of Malwa at many places on the road and the drains on the road have been blocked. Water is flowing on the road.JCB machine has been sent to open the route. |
|
-
|
|
|
7522 |
15 |
6 |
2025-07-19 09:02:31 |
2025-07-19 18:02:31
|
2025-07-19 17:10:46 |
8 hours 8 mins |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.08 |
0.08 |
Slip/ Landslide
|
|
|
The road is partially closed and the drains are completely blocked due to the occurrence of Manwa at many places on the route. JCB machine has been sent to open the route. |
|
-
|
|
|
10680 |
16 |
6 |
2025-07-21 06:30:34 |
2025-07-21 13:30:34
|
2025-07-21 15:41:57 |
9 hours 11 mins |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.03 |
0.00 |
Slip/ Landslide
|
|
|
Road closed at km 3,4,6,8,9 |
|
-
|
|
|
10972 |
17 |
6 |
2025-07-27 08:56:45 |
2025-07-27 17:56:45
|
2025-07-27 16:48:00 |
7 hours 51 mins |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.08 |
0.08 |
Slip/ Landslide
|
|
|
The road is partially closed due to landslides at many places and the drains are completely blocked. JCB has been sent to open the road and drains. |
|
-
|
|
|
13285 |
18 |
6 |
2025-07-29 09:24:38 |
2025-07-29 14:24:00
|
2025-08-01 14:57:01 |
3 days 5 hours |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.30 |
25.00 |
Slip/ Landslide, Fludding
|
|
|
Road closed falling a tree km 6, km 6,7,8 closed due to land slide and malwa. |
|
-
|
|
|
13559 |
19 |
6 |
2025-08-06 08:26:54 |
2025-08-06 12:26:00
|
2025-08-08 10:09:07 |
2 days 1 hours |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.10 |
25.00 |
Slip/ Landslide, Washout, Sinking
|
|
|
Road closed due to slip at km 6,8 (km 6 critical point) km 6 60 m part of road washout and sinking. |
|
-
|
|
|
16212 |
20 |
6 |
2025-08-11 14:40:56 |
2025-08-11 19:40:56
|
2025-08-11 19:33:41 |
4 hours 52 mins |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.07 |
0.00 |
Slip/ Landslide, Sinking, Fludding
|
|
|
Road closed at km 5,6,7 (km 6,7 is critical sliding and sinking point) |
|
-
|
|
|
19955 |
21 |
6 |
2025-08-12 07:26:44 |
2025-08-12 12:26:44
|
2025-08-12 15:10:42 |
7 hours 43 mins |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.06 |
5.00 |
Slip/ Landslide, Washout, Sinking, Fludding
|
|
|
Road closed at km 5,6,7,8 due to slip, sinking and fludding. Km 6,7 is critical point |
|
-
|
|
|
20143 |
22 |
6 |
2025-08-14 09:26:39 |
2025-08-14 15:26:39
|
2025-08-15 17:41:30 |
1 days 8 hours |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.05 |
6.25 |
Slip/ Landslide, Washout
|
|
|
Road closed at km 5,6,7,8 closed due to slip and km 6,7 is critical point. Road sinking at km 6,7. |
|
-
|
|
|
21510 |
23 |
6 |
2025-08-16 08:27:45 |
2025-08-16 13:27:45
|
2025-08-16 19:11:27 |
10 hours 43 mins |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.05 |
5.00 |
Slip/ Landslide, Washout
|
|
|
Road closed at km 5,6,7,8 (km 6,7 critical sinking point) |
|
-
|
|
|
22592 |
24 |
6 |
2025-08-18 07:14:07 |
2025-08-18 12:14:07
|
2025-08-18 18:49:47 |
11 hours 35 mins |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.06 |
6.25 |
Slip/ Landslide, Washout, Sinking
|
|
|
Road closed at km 6,7,8,9 due to slip, land slide and sinking of road. |
|
-
|
|
|
23577 |
25 |
6 |
2025-08-21 09:36:30 |
2025-08-21 13:36:30
|
2025-08-21 16:58:59 |
7 hours 22 mins |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.05 |
6.67 |
Slip/ Landslide, Sinking
|
|
|
Road closed due to slip at km 6,7,8 |
|
-
|
|
|
25565 |
26 |
6 |
2025-08-23 08:14:52 |
2025-08-23 13:14:52
|
2025-08-24 13:23:16 |
1 days 5 hours |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.05 |
8.33 |
Slip/ Landslide
|
|
|
Road closed at km 6,7,8 due to slip |
|
-
|
|
|
26456 |
27 |
6 |
2025-08-27 07:52:06 |
2025-08-27 11:52:06
|
2025-08-27 16:25:31 |
8 hours 33 mins |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.05 |
6.67 |
Slip/ Landslide, Washout, Sinking
|
|
|
Road closed at km 6,7,8 due to slip and sinking of road. |
|
-
|
|
|
28217 |
28 |
7 |
2025-06-23 09:19:44 |
2025-06-23 17:19:44
|
2025-06-23 16:20:13 |
7 hours 0 mins |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.04 |
0.00 |
Slip/ Landslide
|
|
|
road ke kai sthano me mal;wa aane se road ansik roop se band thi jise kholane hetu JCB machine bheji gai hai . |
|
-
|
|
|
1388 |
29 |
7 |
2025-07-04 08:12:22 |
2025-07-04 17:12:22
|
2025-07-04 17:43:26 |
9 hours 31 mins |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.06 |
0.00 |
Slip/ Landslide
|
|
|
marg ke kai sthano me malwa aane se mar aansik roop se band hai .marg kholne hetu JCB machine bhej di gai hai. |
|
-
|
|
|
6282 |
30 |
7 |
2025-07-19 09:02:31 |
2025-07-19 18:02:31
|
2025-07-19 17:10:55 |
8 hours 8 mins |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.08 |
0.08 |
Slip/ Landslide
|
|
|
The road is partially closed and the drains are completely blocked due to the occurrence of Manwa at many places on the route. JCB machine has been sent to open the route. |
|
-
|
|
|
10681 |
31 |
7 |
2025-07-21 06:30:34 |
2025-07-21 13:30:34
|
2025-07-21 15:42:34 |
9 hours 12 mins |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.03 |
0.00 |
Slip/ Landslide
|
|
|
Road closed at km 3,4,6,8,9 |
|
-
|
|
|
10973 |
32 |
7 |
2025-07-27 08:50:17 |
2025-07-27 13:50:17
|
2025-07-27 16:48:39 |
7 hours 58 mins |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.07 |
0.00 |
Scupper/ Culvert Damage, Fludding
|
|
|
Road closed at km 7,8,9 due to slip and mud. |
|
-
|
|
|
13235 |
33 |
7 |
2025-07-29 09:24:38 |
2025-07-29 14:24:38
|
2025-08-06 17:30:14 |
8 days 8 hours |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.06 |
0.00 |
Slip/ Landslide, Fludding
|
|
|
Road closed falling a tree km 6, km 6,7,8 closed due to land slide and malwa. |
|
-
|
|
|
13560 |
34 |
7 |
2025-08-11 14:40:56 |
2025-08-11 19:40:56
|
2025-08-11 19:33:59 |
4 hours 53 mins |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.07 |
0.00 |
Slip/ Landslide, Sinking, Fludding
|
|
|
Road closed at km 5,6,7 (km 6,7 is critical sliding and sinking point) |
|
-
|
|
|
19956 |
35 |
7 |
2025-08-12 07:26:44 |
2025-08-12 12:26:44
|
2025-08-12 15:10:55 |
7 hours 44 mins |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.06 |
5.00 |
Slip/ Landslide, Washout, Sinking, Fludding
|
|
|
Road closed at km 5,6,7,8 due to slip, sinking and fludding. Km 6,7 is critical point |
|
-
|
|
|
20144 |
36 |
7 |
2025-08-14 09:26:39 |
2025-08-14 15:26:39
|
2025-08-15 17:41:45 |
1 days 8 hours |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.05 |
6.25 |
Slip/ Landslide, Washout
|
|
|
Road closed at km 5,6,7,8 closed due to slip and km 6,7 is critical point. Road sinking at km 6,7. |
|
-
|
|
|
21511 |
37 |
7 |
2025-08-16 08:27:45 |
2025-08-16 13:27:45
|
2025-08-16 19:11:47 |
10 hours 44 mins |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.05 |
5.00 |
Slip/ Landslide, Washout
|
|
|
Road closed at km 5,6,7,8 (km 6,7 critical sinking point) |
|
-
|
|
|
22593 |
38 |
7 |
2025-08-18 07:14:07 |
2025-08-18 12:14:07
|
2025-08-18 18:50:07 |
11 hours 36 mins |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.06 |
6.25 |
Slip/ Landslide, Washout, Sinking
|
|
|
Road closed at km 6,7,8,9 due to slip, land slide and sinking of road. |
|
-
|
|
|
23578 |
39 |
7 |
2025-08-21 09:36:30 |
2025-08-21 13:36:30
|
2025-08-21 16:59:20 |
7 hours 22 mins |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.05 |
6.67 |
Slip/ Landslide, Sinking
|
|
|
Road closed due to slip at km 6,7,8 |
|
-
|
|
|
25566 |
40 |
7 |
2025-08-23 08:14:52 |
2025-08-23 13:14:52
|
2025-08-24 13:27:53 |
1 days 5 hours |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.05 |
8.33 |
Slip/ Landslide
|
|
|
Road closed at km 6,7,8 due to slip |
|
-
|
|
|
26457 |
41 |
7 |
2025-08-27 07:52:06 |
2025-08-27 11:52:06
|
2025-08-27 16:26:09 |
8 hours 34 mins |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.05 |
6.67 |
Slip/ Landslide, Washout, Sinking
|
|
|
Road closed at km 6,7,8 due to slip and sinking of road. |
|
-
|
|
|
28218 |
42 |
8 |
2025-06-23 09:19:44 |
2025-06-23 17:19:44
|
2025-06-23 16:20:20 |
7 hours 0 mins |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.04 |
0.00 |
Slip/ Landslide
|
|
|
road ke kai sthano me mal;wa aane se road ansik roop se band thi jise kholane hetu JCB machine bheji gai hai . |
|
-
|
|
|
1389 |
43 |
8 |
2025-06-25 10:01:59 |
2025-06-25 16:01:59
|
2025-06-25 18:07:18 |
8 hours 5 mins |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.05 |
0.21 |
Slip/ Landslide, Retaining Wall Damage
|
|
|
Km 8,9,10,11 me slip aane se road closed. |
|
-
|
|
|
1728 |
44 |
8 |
2025-07-04 08:12:22 |
2025-07-04 17:12:22
|
2025-07-04 17:43:32 |
9 hours 31 mins |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.06 |
0.00 |
Slip/ Landslide
|
|
|
marg ke kai sthano me malwa aane se mar aansik roop se band hai .marg kholne hetu JCB machine bhej di gai hai. |
|
-
|
|
|
6283 |
45 |
8 |
2025-07-21 06:30:34 |
2025-07-21 13:30:34
|
2025-07-21 15:42:59 |
9 hours 12 mins |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.03 |
0.00 |
Slip/ Landslide
|
|
|
Road closed at km 3,4,6,8,9 |
|
-
|
|
|
10974 |
46 |
8 |
2025-07-27 08:50:17 |
2025-07-27 13:50:17
|
2025-07-27 16:49:15 |
7 hours 58 mins |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.07 |
0.00 |
Scupper/ Culvert Damage, Fludding
|
|
|
Road closed at km 7,8,9 due to slip and mud. |
|
-
|
|
|
13236 |
47 |
8 |
2025-07-29 09:24:38 |
2025-07-29 14:24:38
|
2025-08-01 14:58:55 |
3 days 5 hours |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.06 |
0.00 |
Slip/ Landslide, Fludding
|
|
|
Road closed falling a tree km 6, km 6,7,8 closed due to land slide and malwa. |
|
-
|
|
|
13561 |
48 |
8 |
2025-08-06 08:26:54 |
2025-08-06 12:26:54
|
2025-08-06 17:26:19 |
8 hours 59 mins |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.04 |
0.00 |
Slip/ Landslide
|
|
|
Road closed due to slip at km 4,6,8 (km 6 critical point) |
|
-
|
|
|
16213 |
49 |
8 |
2025-08-12 07:26:44 |
2025-08-12 12:26:44
|
2025-08-12 15:11:10 |
7 hours 44 mins |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.06 |
5.00 |
Slip/ Landslide, Washout, Sinking, Fludding
|
|
|
Road closed at km 5,6,7,8 due to slip, sinking and fludding. Km 6,7 is critical point |
|
-
|
|
|
20145 |
50 |
8 |
2025-08-14 09:26:39 |
2025-08-14 15:26:39
|
2025-08-15 17:42:02 |
1 days 8 hours |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.05 |
6.25 |
Slip/ Landslide, Washout
|
|
|
Road closed at km 5,6,7,8 closed due to slip and km 6,7 is critical point. Road sinking at km 6,7. |
|
-
|
|
|
21512 |
51 |
8 |
2025-08-16 08:27:45 |
2025-08-16 13:27:45
|
2025-08-16 19:12:05 |
10 hours 44 mins |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.05 |
5.00 |
Slip/ Landslide, Washout
|
|
|
Road closed at km 5,6,7,8 (km 6,7 critical sinking point) |
|
-
|
|
|
22594 |
52 |
8 |
2025-08-18 07:14:07 |
2025-08-18 12:14:07
|
2025-08-18 18:50:32 |
11 hours 36 mins |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.06 |
6.25 |
Slip/ Landslide, Washout, Sinking
|
|
|
Road closed at km 6,7,8,9 due to slip, land slide and sinking of road. |
|
-
|
|
|
23579 |
53 |
8 |
2025-08-21 09:36:30 |
2025-08-21 13:36:30
|
2025-08-21 16:59:38 |
7 hours 23 mins |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.05 |
6.67 |
Slip/ Landslide, Sinking
|
|
|
Road closed due to slip at km 6,7,8 |
|
-
|
|
|
25567 |
54 |
8 |
2025-08-23 08:14:52 |
2025-08-23 13:14:52
|
2025-08-24 13:37:56 |
1 days 5 hours |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.05 |
8.33 |
Slip/ Landslide
|
|
|
Road closed at km 6,7,8 due to slip |
|
-
|
|
|
26458 |
55 |
8 |
2025-08-27 07:52:06 |
2025-08-27 11:52:06
|
2025-08-27 16:25:50 |
8 hours 33 mins |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.05 |
6.67 |
Slip/ Landslide, Washout, Sinking
|
|
|
Road closed at km 6,7,8 due to slip and sinking of road. |
|
-
|
|
|
28219 |
56 |
9 |
2025-06-25 10:01:59 |
2025-06-25 16:01:59
|
2025-06-25 18:07:45 |
8 hours 5 mins |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.05 |
0.21 |
Slip/ Landslide, Retaining Wall Damage
|
|
|
Km 8,9,10,11 me slip aane se road closed. |
|
-
|
|
|
1729 |
57 |
9 |
2025-07-21 06:30:34 |
2025-07-21 13:30:34
|
2025-07-21 15:39:33 |
9 hours 8 mins |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.03 |
0.00 |
Slip/ Landslide
|
|
|
Road closed at km 3,4,6,8,9 |
|
-
|
|
|
10975 |
58 |
9 |
2025-07-27 08:50:17 |
2025-07-27 13:50:17
|
2025-07-27 16:47:43 |
7 hours 57 mins |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.07 |
0.00 |
Scupper/ Culvert Damage, Fludding
|
|
|
Road closed at km 7,8,9 due to slip and mud. |
|
-
|
|
|
13237 |
59 |
9 |
2025-07-29 09:24:38 |
2025-07-29 14:24:38
|
2025-08-01 14:56:07 |
3 days 5 hours |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.06 |
0.00 |
Slip/ Landslide, Fludding
|
|
|
Road closed falling a tree km 6, km 6,7,8 closed due to land slide and malwa. |
|
-
|
|
|
13562 |
60 |
9 |
2025-08-18 07:14:07 |
2025-08-18 12:14:07
|
2025-08-18 18:50:50 |
11 hours 36 mins |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.06 |
6.25 |
Slip/ Landslide, Washout, Sinking
|
|
|
Road closed at km 6,7,8,9 due to slip, land slide and sinking of road. |
|
-
|
|
|
23580 |
61 |
10 |
2025-06-25 10:01:59 |
2025-06-25 16:01:59
|
2025-06-25 18:08:08 |
8 hours 6 mins |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.05 |
0.21 |
Slip/ Landslide, Retaining Wall Damage
|
|
|
Km 8,9,10,11 me slip aane se road closed. |
|
-
|
|
|
1730 |
62 |
11 |
2025-06-25 10:01:59 |
2025-06-25 16:01:59
|
2025-06-25 18:08:34 |
8 hours 6 mins |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.05 |
0.21 |
Slip/ Landslide, Retaining Wall Damage
|
|
|
Km 8,9,10,11 me slip aane se road closed. |
|
-
|
|
|
1731 |
63 |
4 |
2025-07-09 07:57:57 |
2025-07-09 16:57:57
|
2025-07-09 16:36:55 |
8 hours 38 mins |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.08 |
0.08 |
Slip/ Landslide
|
|
|
The road is partially closed due to the arrival of Malwa at many places on the road and the drains on the road have been blocked. Water is flowing on the road.JCB machine has been sent to open the route. |
|
-
|
|
|
7520 |
64 |
4 |
2025-07-21 06:30:34 |
2025-07-21 13:30:34
|
2025-07-21 15:37:21 |
9 hours 6 mins |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.03 |
0.00 |
Slip/ Landslide
|
|
|
Road closed at km 3,4,6,8,9 |
|
-
|
|
|
10970 |