1 |
8 |
2025-07-13 08:21:08 |
2025-07-13 15:21:08
|
2025-07-13 18:16:55 |
9 hours 55 mins |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.07 |
0.00 |
Slip/ Landslide
|
|
|
Road partially closed at km 7,8,9 due to malwa.. and mud. |
|
-
|
|
|
9117 |
2 |
8 |
2025-08-06 08:28:42 |
2025-08-06 12:28:42
|
2025-08-06 17:26:16 |
8 hours 57 mins |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.05 |
0.00 |
Slip/ Landslide
|
|
|
Road closed at km 7,8,9 due to slip |
|
-
|
|
|
16217 |
3 |
8 |
2025-08-13 08:37:38 |
2025-08-13 13:37:38
|
2025-08-13 15:58:16 |
7 hours 20 mins |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.07 |
0.00 |
Slip/ Landslide
|
|
|
Road closed due to Slip at km 8,9,10 |
|
-
|
|
|
20987 |
4 |
8 |
2025-08-14 10:29:15 |
2025-08-14 14:29:15
|
2025-08-14 15:08:07 |
4 hours 38 mins |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.08 |
0.00 |
Slip/ Landslide
|
|
|
Road closed due to slip at km 7,8 |
|
-
|
|
|
21519 |
5 |
8 |
2025-08-15 09:53:40 |
2025-08-15 14:53:40
|
2025-08-15 17:33:32 |
7 hours 39 mins |
Opened |
Mr Dawarika Prasad Verma ,Assistant Engineer Civil ,370021733 |
0.05 |
0.00 |
Slip/ Landslide
|
|
|
Road Closed at km 8,9,10 |
|
-
|
|
|
22204 |
6 |
8 |
2025-08-16 08:29:06 |
2025-08-16 12:29:06
|
2025-08-16 19:08:12 |
10 hours 39 mins |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.05 |
0.00 |
Slip/ Landslide
|
|
|
Road closed at km 8,9,10. Due to slip |
|
-
|
|
|
22595 |
7 |
8 |
2025-08-19 17:08:19 |
2025-08-19 21:08:19
|
2025-08-20 09:25:26 |
16 hours 17 mins |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.05 |
0.00 |
Slip/ Landslide
|
|
|
रोड closed at km 6,7,8 due to slip |
|
-
|
|
|
24858 |
8 |
8 |
2025-09-01 09:48:40 |
2025-09-01 14:48:40
|
2025-09-01 19:30:28 |
9 hours 41 mins |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.07 |
0.00 |
Slip/ Landslide
|
|
|
Road closed due to slip at km 7,8,9 |
|
-
|
|
|
30733 |
9 |
8 |
2025-09-03 08:17:53 |
2025-09-03 13:17:53
|
2025-09-03 20:07:50 |
11 hours 49 mins |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.07 |
0.00 |
Slip/ Landslide
|
|
|
Road closed to slip at km 8,9,10 |
|
-
|
|
|
32832 |
10 |
8 |
2025-09-04 08:10:29 |
2025-09-04 12:10:29
|
2025-09-04 14:40:12 |
6 hours 29 mins |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.05 |
0.00 |
Slip/ Landslide
|
|
|
Road closed due to slip at km 8,9,10 |
|
-
|
|
|
33707 |
11 |
8 |
2025-09-06 08:12:12 |
2025-09-06 13:12:12
|
2025-09-06 14:17:54 |
6 hours 5 mins |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.07 |
0.00 |
Slip/ Landslide
|
|
|
Road closed due to slip and mud. |
|
-
|
|
|
34830 |
12 |
8 |
2025-09-08 12:53:00 |
2025-09-08 17:53:00
|
2025-09-08 16:29:12 |
3 hours 36 mins |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.07 |
0.00 |
Slip/ Landslide
|
|
|
Road closed due to slip and mud |
|
-
|
|
|
35922 |
13 |
8 |
2025-09-23 09:00:41 |
2025-09-23 22:00:41
|
2025-09-24 11:05:28 |
1 days 2 hours |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.15 |
0.00 |
Slip/ Landslide, Sinking, Fludding
|
|
|
Road closed due to sinking and flooding at km 8,9 km. 8 is very critical point. |
|
-
|
|
|
40084 |
14 |
8 |
2025-10-07 10:53:12 |
2025-10-07 15:53:12
|
2025-10-08 10:16:46 |
23 hours 23 mins |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.07 |
0.00 |
Slip/ Landslide, Sinking
|
|
|
Road closed due to slip and sinking |
|
-
|
|
|
40980 |
15 |
7 |
2025-07-13 08:21:08 |
2025-07-13 15:21:08
|
2025-07-13 18:16:29 |
9 hours 55 mins |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.07 |
0.00 |
Slip/ Landslide
|
|
|
Road partially closed at km 7,8,9 due to malwa.. and mud. |
|
-
|
|
|
9116 |
16 |
7 |
2025-08-06 08:28:42 |
2025-08-06 12:28:42
|
2025-08-06 17:23:35 |
8 hours 54 mins |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.05 |
0.00 |
Slip/ Landslide
|
|
|
Road closed at km 7,8,9 due to slip |
|
-
|
|
|
16216 |
17 |
7 |
2025-08-14 10:29:15 |
2025-08-14 14:29:15
|
2025-08-14 15:07:41 |
4 hours 38 mins |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.08 |
0.00 |
Slip/ Landslide
|
|
|
Road closed due to slip at km 7,8 |
|
-
|
|
|
21518 |
18 |
7 |
2025-08-19 17:08:19 |
2025-08-19 21:08:19
|
2025-08-20 09:25:54 |
16 hours 17 mins |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.05 |
0.00 |
Slip/ Landslide
|
|
|
रोड closed at km 6,7,8 due to slip |
|
-
|
|
|
24857 |
19 |
7 |
2025-09-01 09:48:40 |
2025-09-01 14:48:40
|
2025-09-01 19:29:15 |
9 hours 40 mins |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.07 |
0.00 |
Slip/ Landslide
|
|
|
Road closed due to slip at km 7,8,9 |
|
-
|
|
|
30732 |
20 |
9 |
2025-07-13 08:21:08 |
2025-07-13 15:21:08
|
2025-07-13 18:16:00 |
9 hours 54 mins |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.07 |
0.00 |
Slip/ Landslide
|
|
|
Road partially closed at km 7,8,9 due to malwa.. and mud. |
|
-
|
|
|
9118 |
21 |
9 |
2025-08-06 08:28:42 |
2025-08-06 12:28:42
|
2025-08-06 17:26:54 |
8 hours 58 mins |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.05 |
0.00 |
Slip/ Landslide
|
|
|
Road closed at km 7,8,9 due to slip |
|
-
|
|
|
16218 |
22 |
9 |
2025-08-08 09:21:25 |
2025-08-08 13:21:25
|
2025-08-08 15:24:20 |
6 hours 2 mins |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.05 |
0.00 |
Slip/ Landslide
|
|
|
Road closed at km 9 10 due to slip |
|
-
|
|
|
18324 |
23 |
9 |
2025-08-13 08:37:38 |
2025-08-13 13:37:38
|
2025-08-13 15:58:25 |
7 hours 20 mins |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.07 |
0.00 |
Slip/ Landslide
|
|
|
Road closed due to Slip at km 8,9,10 |
|
-
|
|
|
20988 |
24 |
9 |
2025-08-15 09:53:40 |
2025-08-15 14:53:40
|
2025-08-15 17:33:07 |
7 hours 39 mins |
Opened |
Mr Dawarika Prasad Verma ,Assistant Engineer Civil ,370021733 |
0.05 |
0.00 |
Slip/ Landslide
|
|
|
Road Closed at km 8,9,10 |
|
-
|
|
|
22205 |
25 |
9 |
2025-08-16 08:29:06 |
2025-08-16 12:29:06
|
2025-08-16 19:09:38 |
10 hours 40 mins |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.05 |
0.00 |
Slip/ Landslide
|
|
|
Road closed at km 8,9,10. Due to slip |
|
-
|
|
|
22596 |
26 |
9 |
2025-08-18 09:12:20 |
2025-08-18 15:12:20
|
2025-08-18 18:17:43 |
9 hours 5 mins |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.10 |
0.00 |
Slip/ Landslide
|
|
|
Road closed due to Slip at km 9,10 |
|
-
|
|
|
23816 |
27 |
9 |
2025-09-01 09:48:40 |
2025-09-01 14:48:40
|
2025-09-01 19:34:38 |
9 hours 45 mins |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.07 |
0.00 |
Slip/ Landslide
|
|
|
Road closed due to slip at km 7,8,9 |
|
-
|
|
|
30734 |
28 |
9 |
2025-09-03 08:17:53 |
2025-09-03 13:17:53
|
2025-09-03 20:08:16 |
11 hours 50 mins |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.07 |
0.00 |
Slip/ Landslide
|
|
|
Road closed to slip at km 8,9,10 |
|
-
|
|
|
32833 |
29 |
9 |
2025-09-04 08:10:29 |
2025-09-04 12:10:29
|
2025-09-04 14:40:28 |
6 hours 29 mins |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.05 |
0.00 |
Slip/ Landslide
|
|
|
Road closed due to slip at km 8,9,10 |
|
-
|
|
|
33708 |
30 |
9 |
2025-09-06 08:12:12 |
2025-09-06 13:12:12
|
2025-09-06 14:18:16 |
6 hours 6 mins |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.07 |
0.00 |
Slip/ Landslide
|
|
|
Road closed due to slip and mud. |
|
-
|
|
|
34831 |
31 |
9 |
2025-09-08 12:53:00 |
2025-09-08 17:53:00
|
2025-09-08 16:29:19 |
3 hours 36 mins |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.07 |
0.00 |
Slip/ Landslide
|
|
|
Road closed due to slip and mud |
|
-
|
|
|
35923 |
32 |
9 |
2025-09-16 08:44:30 |
2025-09-16 12:44:30
|
2025-09-16 20:08:55 |
11 hours 24 mins |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.08 |
0.00 |
Slip/ Landslide, Sinking
|
|
|
road closed due to slip and sinking |
|
-
|
|
|
38023 |
33 |
9 |
2025-09-17 11:43:15 |
2025-09-17 17:43:15
|
2025-09-18 10:08:22 |
22 hours 25 mins |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.13 |
0.00 |
Slip/ Landslide, Fludding
|
|
|
road closed due to mud and slip |
|
-
|
|
|
38630 |
34 |
9 |
2025-09-23 09:00:41 |
2025-09-23 22:00:41
|
2025-09-26 20:04:57 |
3 days 11 hours |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.15 |
0.00 |
Slip/ Landslide, Sinking, Fludding
|
|
|
Road closed due to sinking and flooding at km 8,9 km. 8 is very critical point. |
|
-
|
|
|
40085 |
35 |
9 |
2025-09-30 08:59:22 |
2025-09-30 12:59:22
|
2025-09-30 16:27:22 |
7 hours 28 mins |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.10 |
0.00 |
Slip/ Landslide, Sinking
|
|
|
Road closed due to slip and mud |
|
-
|
|
|
40772 |
36 |
9 |
2025-10-07 10:53:12 |
2025-10-07 15:53:12
|
2025-10-08 10:17:05 |
23 hours 23 mins |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.07 |
0.00 |
Slip/ Landslide, Sinking
|
|
|
Road closed due to slip and sinking |
|
-
|
|
|
40981 |
37 |
10 |
2025-08-08 09:21:25 |
2025-08-08 13:21:25
|
2025-08-08 15:24:29 |
6 hours 3 mins |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.05 |
0.00 |
Slip/ Landslide
|
|
|
Road closed at km 9 10 due to slip |
|
-
|
|
|
18325 |
38 |
10 |
2025-08-13 08:37:38 |
2025-08-13 13:37:38
|
2025-08-13 15:58:37 |
7 hours 20 mins |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.07 |
0.00 |
Slip/ Landslide
|
|
|
Road closed due to Slip at km 8,9,10 |
|
-
|
|
|
20989 |
39 |
10 |
2025-08-15 09:53:40 |
2025-08-15 14:53:40
|
2025-08-15 17:32:45 |
7 hours 39 mins |
Opened |
Mr Dawarika Prasad Verma ,Assistant Engineer Civil ,370021733 |
0.05 |
0.00 |
Slip/ Landslide
|
|
|
Road Closed at km 8,9,10 |
|
-
|
|
|
22206 |
40 |
10 |
2025-08-16 08:29:06 |
2025-08-16 12:29:06
|
2025-08-16 19:10:11 |
10 hours 41 mins |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.05 |
0.00 |
Slip/ Landslide
|
|
|
Road closed at km 8,9,10. Due to slip |
|
-
|
|
|
22597 |
41 |
10 |
2025-08-18 09:12:20 |
2025-08-18 15:12:20
|
2025-08-18 18:19:38 |
9 hours 7 mins |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.10 |
0.00 |
Slip/ Landslide
|
|
|
Road closed due to Slip at km 9,10 |
|
-
|
|
|
23817 |
42 |
10 |
2025-09-03 08:17:53 |
2025-09-03 13:17:53
|
2025-09-03 20:08:33 |
11 hours 50 mins |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.07 |
0.00 |
Slip/ Landslide
|
|
|
Road closed to slip at km 8,9,10 |
|
-
|
|
|
32834 |
43 |
10 |
2025-09-04 08:10:29 |
2025-09-04 12:10:29
|
2025-09-04 14:40:43 |
6 hours 30 mins |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.05 |
0.00 |
Slip/ Landslide
|
|
|
Road closed due to slip at km 8,9,10 |
|
-
|
|
|
33709 |
44 |
10 |
2025-09-06 08:12:12 |
2025-09-06 13:12:12
|
2025-09-06 14:18:27 |
6 hours 6 mins |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.07 |
0.00 |
Slip/ Landslide
|
|
|
Road closed due to slip and mud. |
|
-
|
|
|
34832 |
45 |
10 |
2025-09-08 12:53:00 |
2025-09-08 17:53:00
|
2025-09-08 16:29:28 |
3 hours 36 mins |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.07 |
0.00 |
Slip/ Landslide
|
|
|
Road closed due to slip and mud |
|
-
|
|
|
35924 |
46 |
10 |
2025-09-16 08:44:30 |
2025-09-16 12:44:30
|
2025-09-16 20:09:17 |
11 hours 24 mins |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.08 |
0.00 |
Slip/ Landslide, Sinking
|
|
|
road closed due to slip and sinking |
|
-
|
|
|
38024 |
47 |
10 |
2025-09-17 11:43:15 |
2025-09-17 17:43:15
|
2025-09-18 15:25:59 |
1 days 3 hours |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.13 |
0.00 |
Slip/ Landslide, Fludding
|
|
|
road closed due to mud and slip |
|
-
|
|
|
38631 |
48 |
10 |
2025-09-30 08:59:22 |
2025-09-30 12:59:22
|
2025-09-30 16:27:40 |
7 hours 28 mins |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.10 |
0.00 |
Slip/ Landslide, Sinking
|
|
|
Road closed due to slip and mud |
|
-
|
|
|
40773 |
49 |
10 |
2025-10-07 10:53:12 |
2025-10-07 15:53:12
|
2025-10-08 10:17:23 |
23 hours 24 mins |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.07 |
0.00 |
Slip/ Landslide, Sinking
|
|
|
Road closed due to slip and sinking |
|
-
|
|
|
40982 |
50 |
6 |
2025-08-19 17:08:19 |
2025-08-19 21:08:19
|
2025-08-20 09:24:57 |
16 hours 16 mins |
Opened |
Alok Kumar Oli ,Assistant Engineer Civil ,750022910 |
0.05 |
0.00 |
Slip/ Landslide
|
|
|
रोड closed at km 6,7,8 due to slip |
|
-
|
|
|
24856 |