It is submitted that the Bangapani–Jarajibli Motor Road (Length – 19.80 Km) under PMGSY is severely affected due to heavy rainfall, active landslides and continuous rockfall. The connectivity of villages Jarajibli, Banni and adjoining areas having a population of more than 1000 has been disrupted from the main road network. At Km 16, approximately 40 metre length of road has been washed out, and at Km 7–8, approximately 30 metre length of road has also been damaged/washout. Apart from these locations, the road is also obstructed at other places. The road has PC surface; however, due to continuous damage and frequent rockfall, restoration work through normal back cutting and small machinery is not feasible. It is further submitted that departmental/hired machinery has already been deployed at site and continuous efforts are being made for opening of the road. The road up to Km 15 has been opened for light vehicles only, and the status is being reported regularly. However, due to the active slide zone at Km 16, continuous shooting stones and difficult geological conditions, restoration of the affected stretch is not possible with the presently deployed JCB and small machinery. In view of the prevailing emergency situation, deployment of a heavy Poklane/Chain Excavator Machine has become necessary. Although operation of chain excavator may cause damage to the existing PC surface, restoration of connectivity for affected villagers and facilitating rescue/relief operations has become unavoidable. Considering the emergency situation and public interest, it is requested to kindly accord permission for deployment of Poklane/Chain Excavator Machine and execution of restoration work on priority basis. The detailed estimate of the work executed shall be submitted shortly for necessary approval and further action. The expenditure involved in deployment of heavy machinery is likely to be approximately ₹20.00 lakh (including GST).
29.925065000000
80.350217000000
50265
6
1
2026-07-08 08:00:34
2026-07-08 13:00:00
2026-07-08 15:00:27
6 hours 59 mins
Opened
Baldev Arya ,URRDA ,BGTPA5271R
0.08
0.00
Slip/ Landslide
slip
-
46430
7
1
2026-07-14 08:27:27
2026-07-16 18:27:00
2026-07-20 14:01:39
6 days 5 hours
Opened
Baldev Arya ,URRDA ,BGTPA5271R
0.15
0.20
Slip/ Landslide
pocklain machine reached at site
-
50754
8
16
2026-07-10 12:46:25
2026-07-10 15:46:00
2026-07-10 14:00:43
1 hours 14 mins
Opened
Baldev Arya ,URRDA ,BGTPA5271R
0.04
0.00
Slip/ Landslide
slip
-
48557
9
16
2026-07-10 16:53:43
2026-07-16 14:53:00
2026-07-20 13:12:48
9 days 20 hours
Opened
Baldev Arya ,URRDA ,BGTPA5271R
0.09
0.00
Slip/ Landslide
slip
29.925281000000
80.349783000000
48560
10
16
2026-07-20 14:17:36
2026-07-30 20:17:00
2026-08-01 18:20:16
12 days 4 hours
Opened
Baldev Arya ,URRDA ,BGTPA5271R
10.00
20.00
Slip/ Landslide
आज दिनांक 28.07.2026 को उक्त कार्यस्थल का स्थलीय निरीक्षण किया गया। निरीक्षण के दौरान पाया गया कि पोकलेन मशीन द्वारा मार्ग बहाली का कार्य निरंतर प्रगति पर है। तथापि, हिल साइड पर स्थित Fractured Rock से लगातार पत्थर गिरने (Continuous Rock Fall) के कारण मार्ग बहाली कार्य में कठिनाइयाँ उत्पन्न हो रही हैं। इसके बावजूद उपलब्ध संसाधनों के साथ अत्यधिक सावधानीपूर्वक कार्य निरंतर कराया जा रहा है।
-
52844
11
16
2026-08-17 10:42:15
2026-08-17 19:42:00
2026-08-17 12:25:35
1 hours 43 mins
Opened
Baldev Arya ,URRDA ,BGTPA5271R
0.10
0.00
Slip/ Landslide
Fallen tree on Road
-
66303
12
4
2026-07-13 11:17:43
2026-07-16 16:17:00
2026-07-20 13:57:30
7 days 2 hours
Opened
Baldev Arya ,URRDA ,BGTPA5271R
0.10
10.00
Washout
ROAD WIDTH RESTRICTED, CAVITY FORMED ON VALLEY SIDE