बाॅसबगड़-धामीगाॅव मोटर मार्ग। (ID: 9830) , PMGSY , Pithoragarh

# KM Closed On Tentative Date Opened On Response Time Open Type Informed By Initial cost Restoration Cost Damage Type Location Chainages Remark PiC geo location lat lng ID
1 6 2026-07-04 05:43:34 2026-07-04 14:43:00 2026-07-04 14:20:18 8 hours 36 mins Opened Baldev Arya ,URRDA ,BGTPA5271R 0.10 84.00 Slip/ Landslide Slip and boulder - 45172
2 6 2026-07-05 05:34:52 2026-07-05 10:34:00 2026-07-05 14:07:36 8 hours 32 mins Opened Baldev Arya ,URRDA ,BGTPA5271R 0.10 0.00 Slip/ Landslide slip - 45505
3 6 2026-07-08 05:49:22 2026-07-09 16:49:00 2026-07-09 12:01:01 1 days 6 hours Opened Baldev Arya ,URRDA ,BGTPA5271R 0.10 0.00 Slip/ Landslide 0 - 46418
4 6 2026-07-12 06:08:13 2026-07-12 12:08:00 2026-07-12 14:00:59 7 hours 52 mins Opened Baldev Arya ,URRDA ,BGTPA5271R 0.09 0.00 Slip/ Landslide slip and boulder - 49501
5 6 2026-07-16 05:39:25 2026-07-16 16:39:00 2026-07-16 17:30:06 11 hours 50 mins Opened Baldev Arya ,URRDA ,BGTPA5271R 0.15 1.00 Slip/ Landslide Slip and boulder - 51177
6 6 2026-07-17 13:28:11 2026-08-03 18:28:00 2026-08-03 11:06:09 16 days 21 hours Opened Baldev Arya ,URRDA ,BGTPA5271R 0.35 10.00 Slip/ Landslide A massive boulder, approximately 10 meters in size, has fallen onto the road from the upper PWD road situated on the hill slope above. The heavy impact of the falling rock has caused significant damage to the pavement surface and completely obstructed the passage. Active clearance efforts are currently underway to restore traffic movement. To break down and remove the rock, heavy machinery, including a rock breaker is deployed on site, along with an air compressor to drill holes into the boulder to facilitate splitting and clearing. Safe removal of the debris remains the priority, after which surface repairs on the damaged pavement will be carried out. - 51712
7 6 2026-08-19 03:55:46 2026-08-19 12:55:00 2026-08-19 14:00:21 10 hours 4 mins Opened Baldev Arya ,URRDA ,BGTPA5271R 0.15 0.00 Slip/ Landslide slip and debris on road - 67206
8 5 2026-07-06 14:46:13 2026-07-06 17:46:00 2026-07-06 17:59:29 3 hours 13 mins Opened Baldev Arya ,URRDA ,BGTPA5271R 0.08 0.00 Slip/ Landslide Slip - 45956
9 3 2026-07-11 10:45:47 2026-07-11 16:45:47 2026-07-11 13:20:19 2 hours 34 mins Opened Baldev Arya ,URRDA ,BGTPA5271R 0.15 0.00 Slip/ Landslide slip - 49198
10 7 2026-07-17 10:55:20 2026-08-03 15:55:00 2026-08-03 17:00:06 17 days 6 hours Opened Baldev Arya ,URRDA ,BGTPA5271R 6.00 10.00 Slip/ Landslide Opening work is in progress on the Bansbagarh to Dhamigaon Motor Road. Compressor drilling is being carried out for controlled blasting of a large boulder obstructing the road at Km 6.800. Road restoration is in progress, and efforts are being made to reopen the route at the earliest. on 24 /07/2026, A heavy boulder is obstructing the road. Blasting is being attempted using a compressor; however, due to the size and hardness of the boulder, the operation has not been successful. Arrangements are being made to mobilize a higher-capacity compressor to facilitate effective blasting and expedite restoration of the road. - 52829
11 7 2026-08-04 03:58:26 2026-08-04 16:58:00 2026-08-04 16:00:41 12 hours 2 mins Opened Baldev Arya ,URRDA ,BGTPA5271R 0.20 2.00 Slip/ Landslide Slip and slurry soil dressing required - 60326
12 7 2026-08-05 07:06:51 2026-08-05 16:06:00 2026-08-05 12:08:39 5 hours 1 mins Opened Baldev Arya ,URRDA ,BGTPA5271R 0.15 0.00 Slip/ Landslide slip - 61116
13 7 2026-08-26 05:42:37 2026-08-26 22:42:00 2026-08-26 15:44:49 10 hours 2 mins Opened Baldev Arya ,URRDA ,BGTPA5271R 0.15 0.00 Slip/ Landslide Slip - 70415
14 7 2026-09-01 03:59:45 2026-09-01 16:59:00 2026-09-02 06:06:24 1 days 2 hours Opened Baldev Arya ,URRDA ,BGTPA5271R 0.50 10.00 Slip/ Landslide, Sinking, Retaining Wall Damage 150 meter road length settled, required protection - 71856
15 7 2026-09-04 06:28:44 2026-09-04 13:28:00 2026-09-04 12:57:49 6 hours 29 mins Opened Baldev Arya ,URRDA ,BGTPA5271R 0.18 0.00 Slip/ Landslide Slip and boulder - 74510
16 2 2026-07-17 13:44:48 2026-07-17 17:44:00 2026-07-17 18:00:41 4 hours 15 mins Opened Baldev Arya ,URRDA ,BGTPA5271R 0.15 16.00 Slip/ Landslide Slip and boulder - 51628
17 2 2026-08-06 06:58:40 2026-08-06 15:58:40 2026-08-06 16:53:18 9 hours 54 mins Opened Baldev Arya ,URRDA ,BGTPA5271R 0.10 0.00 Slip/ Landslide slip - 61655
18 2 2026-08-11 08:19:38 2026-08-11 16:19:00 2026-08-11 13:28:10 5 hours 8 mins Opened Baldev Arya ,URRDA ,BGTPA5271R 0.20 0.00 Slip/ Landslide slip - 63899
19 2 2026-08-13 05:58:58 2026-08-13 16:58:00 2026-08-13 14:18:26 8 hours 19 mins Opened Baldev Arya ,URRDA ,BGTPA5271R 0.20 0.00 Slip/ Landslide Slip - 64571
20 2 2026-08-15 07:13:17 2026-08-15 11:13:00 2026-08-15 11:00:45 3 hours 47 mins Opened Baldev Arya ,URRDA ,BGTPA5271R 0.08 0.00 Slip/ Landslide Slip and boulder - 65241
21 2 2026-08-18 03:13:43 2026-08-18 13:13:00 2026-08-18 12:03:55 8 hours 50 mins Opened Baldev Arya ,URRDA ,BGTPA5271R 0.15 0.00 Slip/ Landslide Slip, fallen tree - 66445
22 2 2026-08-31 04:49:48 2026-08-31 14:49:00 2026-08-31 16:00:26 11 hours 10 mins Opened Baldev Arya ,URRDA ,BGTPA5271R 0.15 0.00 Slip/ Landslide Slip and boulder - 71377
23 1 2026-08-09 04:25:40 2026-08-09 11:25:00 2026-08-09 16:00:21 11 hours 34 mins Opened Baldev Arya ,URRDA ,BGTPA5271R 0.20 0.00 Slip/ Landslide Slip, boulder - 63210
24 1 2026-08-10 05:07:45 2026-08-10 16:07:00 2026-08-10 16:00:45 10 hours 53 mins Opened Baldev Arya ,URRDA ,BGTPA5271R 0.20 0.00 Slip/ Landslide Slip - 63513
Total: 9.88 133.00

Current Road KM Closures (as on 20 Nov 2026)

KM Tentative Opening Date Status
Road is open.

is opened for Traffic