Toggle Navigation
130W5
reconstruction with geometric improvement of existing 2 lane/intermediate lane to 2 lane with paved shoulder configuration from km 300.00 to 338.00 of NH 58 ( length 36.90)
Bridge
New Construction Hill side Cutting
SDBC
Expenditure
Physical Progress
From
To
Zoom
1M
3M
6M
1Y
YTD
MAX
Zoom Out
₹_160.00_Cr
₹_120.00_Cr
₹_140.00_Cr
₹_160.00_Cr
₹_180.00_Cr
₹_200.00_Cr
₹_220.00_Cr
₹_240.00_Cr
₹_260.00_Cr
₹_280.00_Cr
₹_100.00_Cr
₹_20.00_Cr
₹_40.00_Cr
₹_60.00_Cr
₹_80.00_Cr
₹_100.00_Cr
₹_120.00_Cr
₹_140.00_Cr
₹_160.00_Cr
₹_180.00_Cr
₹_200.00_Cr
L
2020
2022
2024
2026
2028
2030
L
L
Chart
Use left and right arrows to move selection
From 2020 to 2026
Use left and right arrows to move left selection
From 2020
Use left and right arrows to move right selection
To 2026
Use TAB to select grip buttons or left and right arrows to change selection
100%
Chart created using amCharts library