62W5Rehabilitation and ugradation to 2-lane with paved shoulder configuration from existing km 122.00(Dharasu bend) to km 147.230 (Silkyara bend)(desigh Ch. 0.00 to 24.30)of NH-94 in the state of Uttarakhand on EPC mode under improvement to NH connectivity to Chardham.