Feedack Description
No progress on spot after 03 months and no earth or moral filling so problem could be short out . All activity stopped in this area and daily accidents are occurring here. Some illegal ancroacher hindrance in this development work . So it's a suggestion that road side filling work done within a week so relief us from huse dust and dirt pl.
Landmark: Village pherupur laksar road , haridwar
As Per Google Address : 01, Laksar Rd, Alipur Ibrahimpur, Pherupur Ramkhera, Pherupur, Uttarakhand 249404, India
Submitted By : -
Satish chauhan , 4 Feebacks
On 07 Oct 2023
29.857892515138N 78.116788957268E
Division Segment ID : 5726 at Chainage 24.022
Purkazi Laksar Haridwar national highway
Identified By Kml
Nearby complaints and Distance(m)
within: m
acknowledged avg 20 H : 47 M
5 hour
10 minute
assigned avg 1 D : 6 H : 31 M
5 hour
10 minute
completed avg 2 D : 14 H : 48 M
18 hour
2 minute
closed avg 2 D : 22 H : 13 M
4 day
18 hour
59 minute
Status Time Line
acknowledged
on 07 Oct 2023
08:32 PM
By
Deepak Gupta
(420010315)
assigned
on 07 Oct 2023
08:32 PM
By
Deepak Gupta
(420010315)
(assigned to Rajeev Kumar (65006309))
completed
on 08 Oct 2023
09:24 AM
By
Rajeev Kumar
(65006309)
with Comment "This complaint is not related to patch repair. Drains are being constructed on both sides of the road. A road will be built after the drain construction is completed The finalization date of the contract is July 2024. Construction work is in progress. The work will be completed on time."
closed
on 12 Oct 2023
10:21 AM
By
Deepak Gupta
(420010315)
with Comment "The captioned area pherupur at km 52 of NH 334A , is water logged & depressed area where bituminous surface is damaged. Under sanctioned work of NH(O), construction of drain is under progress. After drain construction , about in length of 400 m , resurfacing by bituminous layer will be done. Meanwhile for safe traffic , GSB is laying over the depressed patch & all precautions ate taken to minimize the dust over that area."