MISPWD Complaint Details
  • Individual Patch Reporting Event

Feedback ID: 1479

Current Status: closed

Office: NH Div Dehradun

District: Haridwar

Feedack Description

No progress on spot after 03 months and no earth or moral filling so problem could be short out . All activity stopped in this area and daily accidents are occurring here. Some illegal ancroacher hindrance in this development work . So it's a suggestion that road side filling work done within a week so relief us from huse dust and dirt pl.

Landmark: Village pherupur laksar road , haridwar
As Per Google Address : 01, Laksar Rd, Alipur Ibrahimpur, Pherupur Ramkhera, Pherupur, Uttarakhand 249404, India

Submitted By : -

Satish chauhan , 4 Feebacks

On 07 Oct 2023

29.857892515138N 78.116788957268E

Division Segment ID : 5726 at Chainage 24.022

Identified By Kml

Nearby complaints and Distance(m)

within: m

acknowledged avg 20 H : 47 M

5 hour

10 minute

assigned avg 1 D : 6 H : 31 M

5 hour

10 minute

completed avg 2 D : 14 H : 48 M

18 hour

2 minute

closed avg 2 D : 22 H : 13 M

4 day

18 hour

59 minute

Status Time Line

  • 07 Oct 2023 (1 year ago) Received

  • 07 Oct 2023 (1 year ago) acknowledged

  • 07 Oct 2023 (1 year ago) assigned

  • 08 Oct 2023 (1 year ago) completed

  • 12 Oct 2023 (1 year ago) closed

  • acknowledged on 07 Oct 2023 08:32 PM
    By Deepak Gupta (420010315)

  • assigned on 07 Oct 2023 08:32 PM
    By Deepak Gupta (420010315) (assigned to Rajeev Kumar (65006309))

  • completed on 08 Oct 2023 09:24 AM
    By Rajeev Kumar (65006309) with Comment "This complaint is not related to patch repair. Drains are being constructed on both sides of the road. A road will be built after the drain construction is completed The finalization date of the contract is July 2024. Construction work is in progress. The work will be completed on time."

  • closed on 12 Oct 2023 10:21 AM
    By Deepak Gupta (420010315) with Comment "The captioned area pherupur at km 52 of NH 334A , is water logged & depressed area where bituminous surface is damaged. Under sanctioned work of NH(O), construction of drain is under progress. After drain construction , about in length of 400 m , resurfacing by bituminous layer will be done. Meanwhile for safe traffic , GSB is laying over the depressed patch & all precautions ate taken to minimize the dust over that area."

Images of Issue Uploaded:
Images of Resolve Uploaded: