Feedack Description
The road leading from Gora Parao to the crusher is damaged from the beginning. It is full of potholes.There is a lot of vehicular movement in it and along with it the entire rural pedestrians are also good enough in it and still they will have to suffer. facing.And this problem is very old. There is no rush problem. This is a very old problem and it still has no solution.There is a lot of movement of big trucks in it. That too loaded truck and along with it is also hit by the villagers on foot because there are many potholes in it, so it used to be sprinkled for dust, so that today there is waterlogging, so the person on foot cannot walkPlease solve this quickly, it will be very kind of you.
Landmark: Goraparao to gola
As Per Google Address : 5G8G+Q35, Gorapadao, Arjunpur, Uttarakhand 263139, India
Submitted By : -
bhuwan Chandra Bhatt , 1 Feeback
On 13 Jun 2023
Nearby complaints and Distance(m)
within: m
acknowledged avg 20 H : 47 M
3 day
22 hour
21 minute
assigned avg 1 D : 6 H : 31 M
3 day
22 hour
24 minute
completed avg 2 D : 14 H : 48 M
17 day
3 hour
7 minute
closed avg 2 D : 22 H : 13 M
17 day
10 hour
50 minute
Status Time Line
transfer
on 14 Jun 2023
10:03 AM
By
Ratnesh Kumar Saxena
(42270213M00003)
(transfered to CD Haldwani (3022))
with Comment "Pls check"
acknowledged
on 17 Jun 2023
10:26 AM
By
Lalit Tiwari
(750019505)
assigned
on 17 Jun 2023
10:28 AM
By
Lalit Tiwari
(750019505)
(assigned to Ruchi Jangpangi (42270313F00332))
completed
on 30 Jun 2023
03:12 PM
By
Rajesh Joshi
(42270313M00318)
with Comment "उक्त मोटर मार्ग ग्रामीण श्रेणी का मार्ग है जो कि क्षतिग्रस्त है इसको पैच द्वारा ठीक कराया जाना संभव नहीं है इसका ,आगणन राज्य योजना हेतु प्रेषित किया जा रहा है"
closed
on 30 Jun 2023
10:54 PM
By
Ashok Kumar
(0800326)
with Comment "This Road is under category of VR and need to reconstruction.hence not covered under patch repair work"