राज्य योजना के अन्र्तगत जनपद उधमसिंह नगर के विधानसभा नानकमत्ता के खैराना सलमता बिचपुरी मार्ग का पुर्ननिर्माण का कार्य।

03 228

References : 172/MLA /2023 Date- 27-01-2023

Consituency नानक मत्ता,

Loksabha नेनीताल,

Office निर्माण खण्ड खटीमा

लागत

लाख

Estimated Cost ₹ 152.00

Cost After TSC ₹ 152.38

Technical Advisior Cost ₹ 152.38

माह

12

Tentative Time for Completeion (in Months)

Area of Land (Sqm) 35000.00 वर्गमीटर Land Type लो0नि0वि0 का स्वामित्व

Land Availabilty : भूमि का स्वामित्व लो0नि0वि0 का है। निःशुल्क भूमि उपलब्ध है।

Objective: -

Provisions:

WBM G-2

WBM G-3

20 MM OGPC With Emulsion

Seal Coat

KC Drain in Abadi Portion

 

Connectivity Status: Connecteed

Villages to be Connected:
# District/ Block Village Name Census Code Population SOI Code
SC ST Total
1 उधम सिंह नगर (सितारगंज) Bidaura 56180 92 1051 2629
2 उधम सिंह नगर (सितारगंज) Nanakmatta 56191 1179 1650 8470
3 उधम सिंह नगर (सितारगंज) Khairana 56200 0 953 1181
Total 1271 3654 12280

Documents

1 : Line Plan -

Comparison on Standard Rates

# Items Qty Unit As Per Standard Amount
in DPR
(+) Excess/
(-) Saving
Remark
Rate Amount
Construction of Motor Roads in Plain Areas [for Premix Carpet] (Stage 2)
1 Earth Filling for construction of 7.50 m wide roadway, including compaction by mechanical means and providing proper slope on both sides of the roadway. 5.000 km 15.00 75.00 3.84 -71.16
2 Construction of R.C.C culvert/ hume pipe culvert. 5.000 km 9.00 45.00 1.40 -43.60
3 Providing inter coat with 45-63 mm gauge stone ballast in 3.75 m width compacted to a thickness of 7.5 cms. 5.000 km 7.00 35.00 31.07 -3.93
4 Providing top coat with 22.4-53 mm gauge stone ballast in 3.75 m width compacted to a thickness of 7.5 cms. 5.000 km 7.30 36.50 33.27 -3.23
5 Providing 2cm thick PC in 3.75 m width (including Tack Coat & Seal Coat). 5.000 km 10.00 50.00 46.41 -3.59
6 Brick edging on both sides of the road with M-100 quality bricks. 5.000 km 0.50 2.50 3.76 1.26
7 Construction of pucca drain. (avg 100mtr in each Km) 5.000 km 2.50 12.50 4.36 -8.14
8 Road Safety item & Signage. 5.000 km 1.00 5.00 0.80 -4.20
9 3% contingency + 1% for Quality Control Tests (Total 4%) 5.000 km 2.66 13.30 5.00 -8.30
10 12% G.S.T. 5.000 km 7.99 39.95 22.48 -17.47
Sub Total 62.95 314.75 152.39 -162.36 Saving
Grand Total 314.75 152.39 -162.36 Saving