References : 172/MLA /2023 Date- 27-01-2023
Consituency नानक मत्ता,
Loksabha नेनीताल,
Office निर्माण खण्ड खटीमा
लागत
लाख
Estimated Cost ₹ 152.00
Cost After TSC ₹ 152.38
Technical Advisior Cost ₹ 152.38
माह
12
Tentative Time for Completeion (in Months)
Area of Land (Sqm) 35000.00 वर्गमीटर Land Type लो0नि0वि0 का स्वामित्व
Land Availabilty : भूमि का स्वामित्व लो0नि0वि0 का है। निःशुल्क भूमि उपलब्ध है।
Objective: -
WBM G-2
WBM G-3
20 MM OGPC With Emulsion
Seal Coat
KC Drain in Abadi Portion
Connectivity Status: Connecteed
Documents
1 : Line Plan -
Comparison on Standard Rates
# | Items | Qty | Unit | As Per Standard | Amount in DPR |
(+) Excess/ (-) Saving |
Remark | |
---|---|---|---|---|---|---|---|---|
Rate | Amount | |||||||
Construction of Motor Roads in Plain Areas [for Premix Carpet] (Stage 2) | ||||||||
1 | Earth Filling for construction of 7.50 m wide roadway, including compaction by mechanical means and providing proper slope on both sides of the roadway. | 5.000 | km | 15.00 | 75.00 | 3.84 | -71.16 | |
2 | Construction of R.C.C culvert/ hume pipe culvert. | 5.000 | km | 9.00 | 45.00 | 1.40 | -43.60 | |
3 | Providing inter coat with 45-63 mm gauge stone ballast in 3.75 m width compacted to a thickness of 7.5 cms. | 5.000 | km | 7.00 | 35.00 | 31.07 | -3.93 | |
4 | Providing top coat with 22.4-53 mm gauge stone ballast in 3.75 m width compacted to a thickness of 7.5 cms. | 5.000 | km | 7.30 | 36.50 | 33.27 | -3.23 | |
5 | Providing 2cm thick PC in 3.75 m width (including Tack Coat & Seal Coat). | 5.000 | km | 10.00 | 50.00 | 46.41 | -3.59 | |
6 | Brick edging on both sides of the road with M-100 quality bricks. | 5.000 | km | 0.50 | 2.50 | 3.76 | 1.26 | |
7 | Construction of pucca drain. (avg 100mtr in each Km) | 5.000 | km | 2.50 | 12.50 | 4.36 | -8.14 | |
8 | Road Safety item & Signage. | 5.000 | km | 1.00 | 5.00 | 0.80 | -4.20 | |
9 | 3% contingency + 1% for Quality Control Tests (Total 4%) | 5.000 | km | 2.66 | 13.30 | 5.00 | -8.30 | |
10 | 12% G.S.T. | 5.000 | km | 7.99 | 39.95 | 22.48 | -17.47 | |
Sub Total | 62.95 | 314.75 | 152.39 | -162.36 | Saving | |||
Grand Total | 314.75 | 152.39 | -162.36 | Saving |