Infrastructure Damage Report : थत्युड केम्पटी मोटर मार्ग

8555 - अस्थाई खण्ड थत्यूड़ - Tehri

5

Total Damage Spots

₹ 40.81 Lakhs

Total Estimated Cost

0

Completed

5

Pending

Status Wise Distribution
Cost Analysis
थत्युड केम्पटी मोटर मार्ग DivSegmentID:8555 Closure Report Closure Images

EE Office: अस्थाई खण्ड थत्यूड़

District: Tehri

Segment ID: 8165, EE Segment ID: 8555

Pics Count: 7

Damage Spots Details
Spot #1 - ID:464 , kolti, Chainage 19.450 - 19.470 , Damaged Length 0.02 KM

18-07-2025

Provisions (प्रावधानों की सूची)

Excavation Plum RR 1:6 RR Dry etc

Remark: -

₹ 8.14 Lakh
Identified
Fund:Unknown
Spot #2 - ID:5103 , Kolti village, Chainage 20.15 - 20.168 , Damaged Length 0.018 KM

16-09-2025

Provisions (प्रावधानों की सूची)

1-Exvavation 1- Random Ruble1:6 stone masonary wall 3-H.P filling

1-Excavation 2-Gabion wall

;

Remark: -

₹ 8.00 Lakh
Identified
Fund:Unknown
Spot #3 - ID:6649 , Kolti Vill., Chainage 21.300 - 21.310 , Damaged Length 0.01 KM

15-05-2026

Provisions (प्रावधानों की सूची)

RR Banded Wall Plum HP Back Filling

Remark: Khud Side Damaged

₹ 5.12 Lakh
Identified
Fund:Unknown
Spot #4 - ID:7743 , Bhimal ki chaloti, Chainage 2.300

07-08-2026

Provisions (प्रावधानों की सूची)

Gabions Plum Masonry HP Back Filling

Remark: Damaged on both hill side and khud side.

₹ 9.75 Lakh
Estimation Done
Fund:Unknown
Spot #5 - ID:7734 , Between Forest Checkpost and Lagdasu Village, Chainage 10.100 - 10.150 , Damaged Length 0.05 KM

19-08-2026

Provisions (प्रावधानों की सूची)

Gabions Plum Masonry HP Back Filling

Remark: Damaged on both hill side and khud side

₹ 9.80 Lakh
Estimation Done
Fund:Unknown

All Damage Spots

ID Date Location Cost (₹ Lakh) Chainages Status Yojana
464 18-07-2025 kolti 8.14 19.450 to 19.470 0.02 Identified Not Decided
5103 16-09-2025 Kolti village 8.00 20.15 to 20.168 0.018000000000001 Identified Not Decided
6649 15-05-2026 Kolti Vill. 5.12 21.300 to 21.310 0.009999999999998 Identified Not Decided
7743 07-08-2026 Bhimal ki chaloti 9.75 Estimation Done SDRF
7734 19-08-2026 Between Forest Checkpost and Lagdasu Village 9.80 10.100 to 10.150 0.050000000000001 Estimation Done SDRF