1 2154 CD Haldwani Nanital RTO Road mai Vasudevpuram k pass say Kamaluwaganja ki traf Janay Wali sadak puri lambaee mai jagah j... Thanks Closed 2025-11-17 03:24:59 closed since 1 week ago 2025-11-20 17:20:35 D k Bhatt
2 2023 CD Haldwani Nanital Bhagwanpur road block office Patch work done Closed 2024-11-13 09:47:31 closed since 3 weeks ago 2025-11-04 04:25:24 Kailash Chandra joshi
3 2035 CD Haldwani Nanital मान्यवर निवेदन इस प्रकार है कि kamaluva ganja चौराहे से भरतपुर नंबर 2 को जो मुख्य मार्ग जाता है वह अ... Estimate for reconstruction of road has been forwarded Thanks Closed 2024-11-20 12:12:21 closed since 3 weeks ago 2025-11-04 04:24:50 Abhishek Dwivedi
4 2119 CD Haldwani Nanital सड़क में अत्यधिक गड्ढे हैं, मार्ग किनारों से टूट गया है, जिस कारण दुर्घटनाएं हो रही हैं। Proposed for reconstruction Closed 2025-09-29 13:06:07 closed since 4 weeks ago 2025-10-29 14:46:59 Pallavi Pant
5 2120 CD Haldwani Nanital मंगला बिहार में आंतरिक मार्ग की दुर्दशा के विषय में अतिशीघ्र कार्य होने के संबंध में । Proposed for reconstruction Closed 2025-10-01 03:51:00 closed since 4 weeks ago 2025-10-29 14:46:40 Kuber singh bohra
6 2121 CD Haldwani Nanital सड़क पर जगह जगह गढ़े हो गये हैं व ये किनारे से भी टूट गयी हैं जिस कारण आये दों दिन मुसीबतों का सामना क... Proposed for reconstruction Closed 2025-10-01 05:16:02 closed since 4 weeks ago 2025-10-29 14:46:23 dimpi dharamshaktu
7 2122 CD Haldwani Nanital सड़क पर जगह जगह गढ़े हो गये हैं व ये किनारे से भी टूट गयी हैं जिस कारण आये दिन मुसीबतों का सामना करना... Proposed for reconstruction Closed 2025-10-01 05:22:16 closed since 4 weeks ago 2025-10-29 14:46:06 dimpi dharamshaktu
8 2123 CD Haldwani Nanital Need to fix this Proposed for reconstruction Closed 2025-10-01 07:42:37 closed since 4 weeks ago 2025-10-29 14:45:49 Yogesh
9 2124 CD Haldwani Nanital Need to fix this Proposed for reconstruction Closed 2025-10-01 07:44:20 closed since 4 weeks ago 2025-10-29 14:45:24 पुष्कर चन्द्र
10 2132 CD Haldwani Nanital Road is damaged due to water pipeline connectio. And no maintenance work is done after construction... Proposed for reconstruction Thanks Closed 2025-10-11 05:04:20 closed since 4 weeks ago 2025-10-29 10:14:07 Kavindra Bisht
11 2142 CD Haldwani Nanital Road is not repaired for last 1 year Work under Jurisdiction of Nagar Nigam Haldwani Thanks Closed 2025-10-25 10:59:03 closed since 4 weeks ago 2025-10-29 10:12:50 Nishchay Joshi
12 2137 CD Haldwani Nanital Laxmi narayan mandir road ward no 40 haldwani Under Jurisdiction of Nagar Nigam Haldwani Thanks Reverted 2025-10-24 13:02:26 reverted since 1 month ago 2025-10-27 03:11:02 Dhiresh pandey
13 2138 CD Haldwani Nanital Ward No 40 हिम्मतपूर मल्ला में ऊंचापुल को भगवानपुर से जोड़ने वाली एक सड़क है जो सरस्वती banquet हॉल... Under Jurisdiction of Nagar Nigam Haldwani Thanks Reverted 2025-10-24 15:59:37 reverted since 1 month ago 2025-10-27 03:10:40 Dhiresh pandey
14 2139 CD Haldwani Nanital Ward No 40 हिम्मतपूर मल्ला में ऊंचापुल को भगवानपुर से जोड़ने वाली एक सड़क है जो सरस्वती banquet हॉल... Under Jurisdiction of Nagar Nigam Haldwani Thanks Reverted 2025-10-25 02:24:56 reverted since 1 month ago 2025-10-27 03:10:13 Dhiresh pandey
15 2145 CD Haldwani Nanital Ward No 40 हिम्मतपूर मल्ला में ऊंचापुल को भगवानपुर से जोड़ने वाली एक सड़क है जो सरस्वती banquet हॉल... Under Jurisdiction of Nagar Nigam Haldwani Thanks Reverted 2025-10-27 02:24:32 reverted since 1 month ago 2025-10-27 03:09:43 Dhiresh pandey
16 2096 CD Haldwani Nanital कार रोड मुख्य सड़क टूटने से लोगो को हो रही हैं असुविधा Complain resolve Thanks Closed 2025-05-19 15:52:19 closed since 1 month ago 2025-10-16 02:51:39 Raj Joshi
17 2021 CD Haldwani Nanital फतेहपुर से बसानी रोड में बहुत जगह पैच वर्क पूरी तरह से निकल गया है और रोड की स्थिति बहुत ही खराब है... Thanks Closed 2024-11-09 09:53:15 closed since 9 months ago 2025-02-27 02:53:18 Vinay kumar
18 1984 CD Haldwani Nanital This road is very poor condition। Plz repear this road Patch work completed Closed 2024-10-13 10:30:57 closed since 1 year ago 2024-11-16 22:13:17 Govind singh Rawat
19 1985 CD Haldwani Udham Singh Nagar महोदय रोड बहुत खराब हो चुकी है This road is not covered under patchwork.it need reconstruction due to damaged almost 70%. Henced cl... Closed 2024-10-16 08:44:52 closed since 1 year ago 2024-10-24 09:07:07 Kamal Pandey
20 1993 CD Haldwani Nanital There has been a lot of potholes in road of Mridul Vihar, Pilikothi, Bari Mukhani. Same was reported... The concerned road is under jurisdiction of Nagar Nigam Haldwani kathgodam. Reverted 2024-10-18 11:31:49 reverted since 1 year ago 2024-10-20 20:07:53 Ashish Pant
21 1947 CD Haldwani Nanital To, The Public Works Department, [Municipality Name], [City Name]. Date: [Insert Date] Subject: Comp... On going work Closed 2024-09-19 07:13:48 closed since 1 year ago 2024-10-16 21:42:17 Advocate Tarang Mathpal
22 1966 CD Haldwani Nanital 1 sal se ismein se hi gaddha hua pada hai aur scooty or roj bike wale ka accident ho raha hai, isme... This is under jurisdiction of Nagar Nigam Haldwani kathgodam. Reverted 2024-09-28 08:08:50 reverted since 1 year ago 2024-10-07 13:14:57 Pankaj kumar
23 1954 CD Haldwani Nanital There has been a lot of potholes in Mridul Vihar Colony, pilikothi haldwani. Please do the needful Reverted 2024-09-21 06:52:14 reverted since 1 year ago 2024-09-21 08:44:16 Ashish Pant
24 1955 CD Haldwani Nanital There has been a lot of potholes in mridul vihar, pilikothi haldwani causing inconvenience. Kindly m... Please do the needful Reverted 2024-09-21 08:00:03 reverted since 1 year ago 2024-09-21 08:43:57 Ashish Pant
25 1926 CD Haldwani Udham Singh Nagar रावत नगर प्रथम तीन मंदिर रोड पुरी क्षतिग्रस्त हुई है दुर्घटना होने का कारण बनी हुई है Road condition is bad ,need to renew hence Road is not covered under patch work Closed 2024-09-08 17:57:41 closed since 1 year ago 2024-09-21 08:43:19 Arpit Bhatt
26 1940 CD Haldwani Udham Singh Nagar Paitch work Completed Closed 2024-09-17 07:46:57 closed since 1 year ago 2024-09-21 08:40:45 Kamal bhatt
27 1912 CD Haldwani Nanital Please correct this patch as soon as possible. We the people shall remain thankful This is under the jurisdiction of Nagar Nigam Haldwani kathgodam. Reverted 2024-09-01 18:26:11 reverted since 1 year ago 2024-09-02 19:43:57 Prabhakar
28 1887 CD Haldwani Nanital Bhagwanpur road near block tiraha Patch work done Thanks Closed 2024-08-17 08:43:02 closed since 1 year ago 2024-09-01 17:49:38 Kailash Chandra joshi
29 1872 CD Haldwani Nanital Please repair Work done Thanks Closed 2024-08-04 18:27:10 closed since 1 year ago 2024-09-01 11:18:54 Gaurav Joshi
30 1873 CD Haldwani Nanital Please repair. Pulliya Hallo ho gayi ha please check and repair The complain is regarding irrigation wall Thanks Reverted 2024-08-04 18:30:15 reverted since 1 year ago 2024-08-05 18:56:47 Gaurav Joshi
31 1861 CD Haldwani Nanital Road damage Parch work completed Closed 2024-07-15 09:40:17 closed since 1 year ago 2024-08-01 10:22:01 Sachin Bisht
32 1846 CD Haldwani Nanital महोदय, मोटाहल्दू रामपुर रोड पर ॐ साई इंटरप्राइजेज के पास मुख्य रोड पर बड़े बड़े गड्ढे (लगभग 1 फ़ीट के )... Patch work completed Closed 2024-07-02 10:20:56 closed since 1 year ago 2024-07-31 21:28:44 Dinesh Chandra Joshi
33 1841 CD Haldwani Nanital पानी की लाइन डालने के कारण काटी गई रोड में हो रहे गड्ढे जिसके बरसात में और ज्यादा टूटने की आशंका है... Road shall be repaired under Road cutting ( JJM) after Mansoon Closed 2024-06-22 07:58:10 closed since 1 year ago 2024-07-21 09:38:58 Bhuwan Chandra bhatt
34 1823 CD Haldwani Nanital Bhagwanpur road Patch work done Closed 2024-06-02 11:06:57 closed since 1 year ago 2024-07-15 16:18:06 Kailash Chandra joshi
35 1832 CD Haldwani Nanital बिंदुखत्ता शहिद स्मारक से इन्द्रानगर की ओर हल्द्वानी स्टोन कम्पनी क्रेशर के गेट से इंद्रा नगर मंदिर... Patchwork completed Closed 2024-06-07 11:23:09 closed since 1 year ago 2024-06-21 20:01:13 Bhuwan Chandra bhatt
36 1809 CD Haldwani Nanital रोड अत्यंत जर्जर हालत में है जिस कारण पैच रिपेयर टिक नही पा रहा है। कृपया करके इस बार पैच रिपेयर न क... Work done completed Closed 2024-05-09 18:51:53 closed since 1 year ago 2024-06-19 23:37:55 Vinay kumar
37 1824 CD Haldwani Nanital हमारे गांव की सड़क, पिछले 8-9 वर्षों से नहीं बनी है। इससे यहां रहने वाले करीब 50 परिवारों को आवागमन... Close Closed 2024-06-02 12:59:02 closed since 1 year ago 2024-06-19 23:37:24 Deepesh Joshi
38 1789 CD Haldwani Nanital Bhagwanpur road block patch Thanks Closed 2024-04-27 07:47:26 closed since 1 year ago 2024-05-22 19:57:32 Kailash Chandra joshi
39 1790 CD Haldwani Nanital Bhagwanpur road block patch Thank Closed 2024-04-27 07:58:30 closed since 1 year ago 2024-05-22 19:57:20 Kailash Chandra joshi
40 1794 CD Haldwani Nanital Road nearby reliance mall is destroyed totally plzz repair it Patch work done Thanks Closed 2024-04-30 14:48:02 closed since 1 year ago 2024-05-22 19:57:00 Jitendra Singh bhandari
41 1798 CD Haldwani Nanital Still no response from your dept it seems fake and been complain to your head department asap Patch work done Closed 2024-05-03 17:34:37 closed since 1 year ago 2024-05-22 19:56:35 Jitendra Singh bhandari
42 1791 CD Haldwani Udham Singh Nagar Damaged road recover road Sorry for the inconveniences. Patchwork completed Closed 2024-04-28 14:30:02 closed since 1 year ago 2024-05-17 14:07:45 Deepak upadhyay
43 1799 CD Haldwani Udham Singh Nagar निकट बथ्याल जी की दुकान Sorry for the Inconveniences. Patchwork completed Closed 2024-05-04 16:08:56 closed since 1 year ago 2024-05-17 14:06:50 Bhuwan Chandra bhatt
44 1804 CD Haldwani Nanital Need proper road rework. Likelihood of accident as number of vehicles including school buses daily v... Sorry for the inconveniences. Patchwork completed Closed 2024-05-05 14:59:02 closed since 1 year ago 2024-05-17 14:06:16 Nikhil Pandey
45 1758 CD Haldwani Nanital Hello good day sir/Mam, this is to bring you notice about this road and facing difficulty my us day... This is matter regarding new construction hence not covered under patch repair work. Closed 2024-04-01 12:16:49 closed since 1 year ago 2024-05-16 14:25:32 Hem karki
46 1800 CD Haldwani Nanital Patch repairing required This is under the jurisdiction of Nagar Nigam Reverted 2024-05-04 19:20:15 reverted since 1 year ago 2024-05-07 23:06:20 Hemant Kumar Pathak
47 1802 CD Haldwani Nanital The road here near the canal is getting hollow from inside which could lead to a major problem / acc... This is under jurisdiction of Nagar Nigam Reverted 2024-05-05 10:42:36 reverted since 1 year ago 2024-05-07 23:05:02 Shivam Khandelwal
48 1803 CD Haldwani Nanital I would like to draw your kind attention towards the poor condition of the road in our locality. The... This is under jurisdiction of Nagar Nigam. Reverted 2024-05-05 14:14:59 reverted since 1 year ago 2024-05-07 22:50:01 9923309570
49 1731 CD Haldwani Nanital बाजार के मुख्य चौराहे पर दुर्घटना होने की संभावना Patchwork completed Closed 2024-03-04 17:24:52 closed since 1 year ago 2024-05-04 09:06:49 Partap Singh koshyari
50 1785 CD Haldwani Nanital Whole road is damaged This road is under jurisdiction of Nagar Nigam Haldwani. Reverted 2024-04-24 16:30:31 reverted since 1 year ago 2024-04-24 21:22:09 Mayank Bhatt
51 1776 CD Haldwani Nanital Patch for last 2 years Under Jurisdiction of Nagar Nigam Haldwani Thanks Reverted 2024-04-14 10:28:00 reverted since 1 year ago 2024-04-19 14:25:48 Rajesh Kumar
52 1777 CD Haldwani Nanital Patch for last 1 year Under Jurisdiction of Nagar Nigam Haldwani Thanks Reverted 2024-04-14 10:30:08 reverted since 1 year ago 2024-04-19 14:24:31 Rajesh Kumar
53 1700 CD Haldwani Nanital Please impose penalty who damages roads Completed Closed 2024-02-12 06:46:00 closed since 1 year ago 2024-04-19 12:03:02 Pushpesh sanga
54 1712 CD Haldwani Nanital 2 वर्ष पहले ही रोड बनी है। 6 माह से पैच बना है। विभाग ध्यान नहीं दे रहा है। कृपया पैच भरने में सहयोग... Area is under jurisdiction of Nagar Nigam. Closed 2024-02-22 21:22:14 closed since 1 year ago 2024-04-19 12:02:23 KAMLESH KUMAR SATI
55 1718 CD Haldwani Nanital Road condition is very bad and potholes have made the people prone to accidents. Road connects katgh... Completed Closed 2024-02-25 11:38:28 closed since 1 year ago 2024-04-16 22:35:54 Ajitesh kumar Tamta
56 1685 CD Haldwani Nanital सेवा में माननीय अधिशाषी अभियंता (लोक निर्माण विभाग) हल्द्वानी नैनीताल) २६३१३९ माननीय निवेदन इस प्रका... Katcha patch work completed. Closed 2024-01-31 17:45:31 closed since 1 year ago 2024-03-02 00:26:39 Abhishek Dwivedi
57 1684 CD Haldwani Nanital यह सडक पूरी तरह से क्षति ग्रस्त हो चुकी है This is not covered under Patch work .The concerned road is damaged up to 60% , need to reconstructi... Closed 2024-01-31 09:48:09 closed since 1 year ago 2024-02-21 11:53:30 Balwant Singh Bisht
58 1655 CD Haldwani Nanital Haldwani block near by naman mall, Patchwork completed. Closed 2023-12-30 12:56:55 closed since 1 year ago 2024-01-18 08:02:29 Vinod Bhatt
59 1590 CD Haldwani Nanital jal jeewan mission ki khudai ke baad road repair nhi hui The road is damaged by Jaljeevan mission. After completion report of the concerned department, resto... Closed 2023-11-19 07:50:33 closed since 1 year ago 2024-01-02 21:49:35 Basant ballabh kandpal
60 1597 CD Haldwani Nanital Ine jagahon per Pani bharta hai The road is damaged due to Pipeline laying .after completion report of the Jalsansthan.road will be... Closed 2023-11-21 16:46:04 closed since 1 year ago 2024-01-02 21:48:11 ANURAG SHARMA
61 1639 CD Haldwani Nanital This road is accident prone now Work completed Closed 2023-12-22 07:58:35 closed since 1 year ago 2024-01-02 21:46:10 Nikhil Pandey
62 1640 CD Haldwani Nanital Accident prone road Work completed Closed 2023-12-22 07:59:01 closed since 1 year ago 2024-01-02 21:45:48 Nikhil Pandey
63 1626 CD Haldwani Udham Singh Nagar तीव्र मोड़ पर दुर्घटना होने की संभावना बने रहना Thinks Closed 2023-12-07 13:41:39 closed since 1 year ago 2023-12-29 11:42:59 Partap Singh koshyari
64 1628 CD Haldwani Udham Singh Nagar तीव्र मोड़ पर दुर्घटना होने की संभावना एवं स्कूली बच्चों के लिए दिक्कत होना Thanks Closed 2023-12-08 14:57:15 closed since 1 year ago 2023-12-29 11:42:43 Partap Singh koshyari
65 1588 CD Haldwani Nanital Motahaldu to Lalkuan via HALDUCHAUR going through ex MLA and present MLA residence is worsed Thanks Closed 2023-11-19 06:51:24 closed since 1 year ago 2023-12-29 11:42:30 Bhuwan Chandra Pandey
66 1589 CD Haldwani Nanital मोटा हल्दू से हल्दूचोड़ लालकुवा बाईपास रोड Thanks Closed 2023-11-19 06:55:59 closed since 1 year ago 2023-12-29 11:42:17 Bhuwan Chandra Pandey
67 1624 CD Haldwani Udham Singh Nagar घर के आगे दुर्घटना होने की संभावना है उक्त मार्ग पैच रिपेयर कार्य के द्वारा ठीक किया जाना संभव नहीं है। नवीनी करण हेतु प्रस्तावित किया जाए... Closed 2023-12-07 09:39:21 closed since 1 year ago 2023-12-28 21:28:02 Partap Singh koshyari
68 1606 CD Haldwani Nanital Please repair road as soon as possible Patchwork completed Closed 2023-11-23 13:55:40 closed since 1 year ago 2023-12-26 23:25:18 Gautam kumar tewari
69 1594 CD Haldwani Nanital Vehicle take accidentally break , it may do big , Patchwork completed Closed 2023-11-20 10:40:02 closed since 1 year ago 2023-12-14 13:13:50 Uday
70 1519 CD Haldwani Udham Singh Nagar Rajkiy Inter College This road is needed reconstruction or resurfacing in whole .Hance not covered under Patch work. Prop... Closed 2023-10-21 09:00:16 closed since 2 years ago 2023-11-25 07:32:35 Vicky
71 1520 CD Haldwani Udham Singh Nagar Rajkiy Inter College Tuti Puliya This road is needed reconstruction or resurfacing in whole .Hance not covered under Patch work. Prop... Closed 2023-10-21 09:02:10 closed since 2 years ago 2023-11-25 07:32:03 Vicky
72 1551 CD Haldwani Udham Singh Nagar इस रास्ते में बहुत खड़े हैं जिससे आने-जाने में बड़ी दिक्कत होती है The said road is not come under patch work.need to reconstruction of the said road. Closed 2023-11-03 16:24:57 closed since 2 years ago 2023-11-22 11:49:07 Pooran singh bora
73 1564 CD Haldwani Udham Singh Nagar Road riperig The said road is not come under patch work.need to reconstruction of the said road. Closed 2023-11-05 07:08:52 closed since 2 years ago 2023-11-22 11:48:47 Surendra Singh rawat
74 1565 CD Haldwani Udham Singh Nagar Plz repair the road Road is almost dammage,need to reconstruction. It's not come under patch work. Closed 2023-11-05 10:10:35 closed since 2 years ago 2023-11-22 11:47:37 basant Mishra
75 1595 CD Haldwani Nanital विगत दस वर्षों से क्षतिग्रस्त सडक़ यथासंभव ,यथाशीघ्र ठीक करवाने हेतु This road is under jurisdiction of Nagar Nigam Haldwani. Reverted 2023-11-20 13:43:24 reverted since 2 years ago 2023-11-22 11:46:03 Dayanand pandey
76 1538 CD Haldwani Nanital जयपुर खोलिया व मदनपुर तल्ला कार्य स्वीकृत है।जल जीवन मिशन के कार्य पूर्ण होने के उपरांत सतह सुधार का कार्य पूर्ण कर लिया जाएगा। Closed 2023-10-30 16:27:56 closed since 2 years ago 2023-11-17 21:10:32 Kamal Bhatt
77 1539 CD Haldwani Nanital किशनपुर चौराहा से एचके गुरुरानी व अन्य के घर तक अमृतधारा सरसों तेल मार्ग कार्य स्वीकृत है।जल जीवन मिशन के कार्य पूर्ण होने के उपरांत सतह सुधार का कार्य पूर्ण कर लिया जाएगा। Closed 2023-10-30 16:36:43 closed since 2 years ago 2023-11-17 21:10:11 Kamal Bhatt
78 1540 CD Haldwani Nanital मदनपुर पारस पर्गाई के घर से भावेश पाठक व अन्य के घर के पास कार्य स्वीकृत है।जल जीवन मिशन के कार्य पूर्ण होने के उपरांत कार्य पूर्ण कर लिया जाएगा। Closed 2023-10-30 16:40:32 closed since 2 years ago 2023-11-17 21:09:36 Kamal Bhatt
79 1511 CD Haldwani Nanital There are potholes in the road and children are facing difficulty in going to school. Patchwork completed Closed 2023-10-18 10:52:13 closed since 2 years ago 2023-11-04 00:59:09 Krishna arya
80 1501 CD Haldwani Nanital राजीव नगर फर्स्ट दूध डेरी से गोला रोड कार रोड तक सड़क का टूटना दुर्घटना की स्थिति बनी हुई पैच कार्य पूर्ण Closed 2023-10-12 18:12:46 closed since 2 years ago 2023-11-01 21:45:31 Arpit Bhatt
81 1504 CD Haldwani Udham Singh Nagar This reason condition is very bad on scholars heaven school road West Rajeev Nagar ghodnala मार्ग पैच वर्क से आच्छादित नही है। मार्ग में नवीनीकरण की आवश्यकता है, नए वित्तीय सत्र में प्रस्तावित... Closed 2023-10-15 07:44:41 closed since 2 years ago 2023-11-01 21:45:04 Sachin Bisht
82 1505 CD Haldwani Nanital Sher Singh parihar chakki road is very bad पैच कार्य पूर्ण Closed 2023-10-15 07:52:47 closed since 2 years ago 2023-11-01 21:44:13 Sachin Bisht
83 1513 CD Haldwani Nanital Condition is very bad कार्य पूर्ण Closed 2023-10-18 16:49:28 closed since 2 years ago 2023-11-01 21:43:46 Sachin Bisht
84 1525 CD Haldwani Udham Singh Nagar Damage road मार्ग पैच वर्क से आच्छादित नही है। मार्ग में नवीनीकरण की आवश्यकता है, नए वित्तीय सत्र में प्रस्तावित... Closed 2023-10-23 07:47:06 closed since 2 years ago 2023-11-01 21:43:12 Sachin Bisht
85 1467 CD Haldwani Nanital यह सडक पूरी तरह क्षतिग्रस्त हो चुकी है रिपेयर की जरूरत है Patchwork completed Closed 2023-10-05 06:44:01 closed since 2 years ago 2023-10-29 07:25:27 Balwant Singh Bisht
86 1503 CD Haldwani Nanital Rajeev nagar first road mantance Patchwork completed Closed 2023-10-15 06:15:04 closed since 2 years ago 2023-10-29 07:25:08 Devendra singh
87 1517 CD Haldwani Nanital methaawla basani road me thoda bahut patch work kiya gya 1 weak pahle wo v nikalne lag gya hai or ba... Patchwork Completed Closed 2023-10-20 16:14:36 closed since 2 years ago 2023-10-29 07:24:41 Vinay kumar
88 1466 CD Haldwani Nanital यह सडक रिपेयर हो नी है Patchwork completed Closed 2023-10-05 06:41:30 closed since 2 years ago 2023-10-26 17:49:52 Balwant Singh Bisht
89 1514 CD Haldwani Nanital बहुत खतरनाक लाखो लोग चलते है यहा पर से प्लीज़ सर भ्रमण कर दो प्लीज़ It's under the jurisdiction of Nagar Nigam Haldwani. Reverted 2023-10-19 09:05:09 reverted since 2 years ago 2023-10-21 11:21:45 Govind
90 1416 CD Haldwani Udham Singh Nagar Subhash nagar Patchwork completed Closed 2023-09-25 18:17:33 closed since 2 years ago 2023-10-20 12:37:41 Kamal bhatt
91 1419 CD Haldwani Udham Singh Nagar Bindukhera road Patchwork completed Closed 2023-09-26 09:37:54 closed since 2 years ago 2023-10-13 07:34:10 Sachin Bisht
92 1420 CD Haldwani Udham Singh Nagar Bindukhera रोड Patchwork completed Closed 2023-09-26 09:39:31 closed since 2 years ago 2023-10-13 07:33:48 Kamal bhatt
93 1439 CD Haldwani Nanital fatehpur to basani road me adhikhans jagah bahut bade bade gadde ho gye h Patchwork completed Closed 2023-09-30 14:05:08 closed since 2 years ago 2023-10-13 07:33:28 Vinay kumar
94 1431 CD Haldwani Nanital Haldwani/barailly main road se Balaji ston cresher Tak lagbhag 900 MTR road me bare bare gadde pichl... Road is not cover under patch work. For improvement and reconstruction of the said road , estimate p... Closed 2023-09-28 12:25:12 closed since 2 years ago 2023-10-10 11:50:59 Milap Singh
95 1418 CD Haldwani Udham Singh Nagar Child secred public school Patchwork completed Closed 2023-09-26 09:30:52 closed since 2 years ago 2023-10-02 09:20:43 Kamal bhatt
96 1438 CD Haldwani Nanital Road has been in this Detroit condition the surface material is also not there It's under the jurisdiction of Nagar Nigam Haldwani. please do the needful Reverted 2023-09-29 20:48:04 reverted since 2 years ago 2023-09-29 20:51:28 Manish joshi
97 1386 CD Haldwani Nanital कार रोड मुख्य मार्ग में यह रोड दुबारा से टूट चुकी है कृपया इसे बनवाने की कृपा करें Work completed Closed 2023-09-16 17:29:48 closed since 2 years ago 2023-09-29 19:23:08 Raj Joshi
98 1300 CD Haldwani Nanital कुसुमखेड़ा रोड near Hanuman Mandir near narottam ganga vihar phase 1। Road patchwork needed Completed Closed 2023-08-25 12:23:03 closed since 2 years ago 2023-09-27 22:07:17 Lokesh suyal
99 1257 CD Haldwani Nanital Pot Holes at by pass road starting Patchwork completed. Closed 2023-08-14 15:35:24 closed since 2 years ago 2023-09-22 19:34:03 Ashish tewari
100 1302 CD Haldwani Nanital राजीव नगर प्रथम से काररोड़ गोला रोड तक जगह-जगह बड़े-बड़े गड्ढे बने हुए हैं जिसमें दुर्घटना होने का ख... Tender received and Patch work will be completed soon Closed 2023-08-26 06:53:18 closed since 2 years ago 2023-09-21 08:46:00 Arpit Bhatt
101 1304 CD Haldwani Nanital RTO road bahut karab hia bade bade gadhe ho rakhe hai harpal genral store to pal college Tak please... Patchwork completed Closed 2023-08-27 12:12:58 closed since 2 years ago 2023-09-21 08:44:32 Himanshu kothari
102 1368 CD Haldwani Nanital Road is very phethetic condition...... some mishapping soon. Patchwork completed Closed 2023-09-13 13:05:09 closed since 2 years ago 2023-09-21 08:44:12 Yogesh
103 1379 CD Haldwani Nanital There some accidents happend in the past because this please repair it fast Patchwork completed Closed 2023-09-15 14:17:42 closed since 2 years ago 2023-09-21 08:43:55 Manish joshi
104 1255 CD Haldwani Nanital Please patch a road it's to dengous for us thankfully Patchwork completed Closed 2023-08-14 11:17:05 closed since 2 years ago 2023-09-15 02:57:10 Dalbeer singh
105 1285 CD Haldwani Nanital it is causing disturbance.. while driving .. Patchwork completed Closed 2023-08-20 20:41:55 closed since 2 years ago 2023-09-15 02:56:45 mukul arya
106 1263 CD Haldwani Nanital बहुत बड़ा गड्ढा है सर बहुत बड़ा गढ़ा है प्लीज करा दीजिए नही तो ये बहुत बड़ा हादसा का कारक बनेगा । आप... Patchwork completed Closed 2023-08-16 08:34:36 closed since 2 years ago 2023-09-13 16:19:29 Govind
107 1260 CD Haldwani Udham Singh Nagar मोड में सड़क का टूटना Patchwork will be completed by renewal soon. वर्षा के कारण पैच मरम्मत कार्य नही किया जा सका है। नवीन... Closed 2023-08-14 18:50:45 closed since 2 years ago 2023-09-06 15:58:19 Arpit Bhatt
108 1273 CD Haldwani Nanital आइटीबीपी रोड हिरण बाबा मंदिर के पास उसके घर से राणा जी के घर से मंदिर तक Kuchha Patch work completed, bitumen patchwork will be completed soon after Sunny season. Closed 2023-08-18 10:44:39 closed since 2 years ago 2023-08-27 15:08:08 Kamal Bhatt
109 1225 CD Haldwani Nanital Road is patchy Katcha patch work completed. Closed 2023-08-08 12:22:16 closed since 2 years ago 2023-08-23 20:50:51 Pawan pant
110 1266 CD Haldwani Nanital Road digged during work or reliance jio, not repaired properly causing accident Please do the needful Reverted 2023-08-17 06:03:43 reverted since 2 years ago 2023-08-17 23:48:26 Girjesh belwal
111 1252 CD Haldwani Nanital Road kharab ho rakhi hai kaafi bade gadhe pade hue hai koi bhi badi durghatna ho sakti hai please is... Under Jurisdiction of Nagar Nigam Haldwani Thanks Reverted 2023-08-14 08:15:20 reverted since 2 years ago 2023-08-14 22:46:26 Suresh Joshi
112 1122 CD Haldwani Nanital Road ke 6 mhine me halat khrab कष्ट के लिए क्षमा चाहेंगे। पैक पैच वर्क का कार्य वर्षा ऋतु के उपरांत कर दिया जाएगा। Closed 2023-07-20 19:22:06 closed since 2 years ago 2023-08-11 22:34:26 Vivek padaliya
113 1180 CD Haldwani Nanital उस जगह पर नेट काम नहीं करता है कष्ट के लिए क्षमा चाहेंगे।वर्षा के कारण कच्चे पैच से कार्य कर दिया गया है।वर्षके उपरांत डामर से पैच... Closed 2023-08-02 13:28:02 closed since 2 years ago 2023-08-11 22:32:32 Lokesh Gururani
114 1169 CD Haldwani Nanital यह रोड ग्राम मदनपुर पोस्ट किशनपुर गौलापार हल्द्वानी की है इस रोड की हालत बहुत ही खराब है जल संस्थान लालकुआ द्वारा रोड कटिंग के।उपरांत मार्ग को रिस्टोर किया जाना है। जल संस्थान को स्थिती से... Closed 2023-08-01 10:10:00 closed since 2 years ago 2023-08-10 14:51:58 Gaurav Joshi
115 1211 CD Haldwani Nanital Sever line hole is opened.very sensitive area due to aurom school.children can fall into.hole cause... Under Jurisdiction of Nagar Nigam Haldwani Thanks Reverted 2023-08-06 17:24:13 reverted since 2 years ago 2023-08-07 14:25:19 DINESH KUMAR
116 1192 CD Haldwani Nanital This Danger Patch is near Chakluwa in the main road going from Kaladhungi to Haldwani. This Patch ca... Patch work completed Thanks Closed 2023-08-04 12:02:59 closed since 2 years ago 2023-08-07 14:23:53 Kewala Nand Bhatt
117 1152 CD Haldwani Nanital कृपया पैच के साथ -साथ जगह जगह आ रही दरारो को भी रिपेयर करेंगे तो road की लाइफ बढ़ जाएगी Patchwork completed Closed 2023-07-27 15:16:39 closed since 2 years ago 2023-08-04 19:44:11 Umesh joshi
118 1153 CD Haldwani Nanital Please repair patch as soon as possible Sorry for the inconvenience.patch work completed Closed 2023-07-27 16:29:28 closed since 2 years ago 2023-08-04 19:43:23 Umesh joshi
119 1154 CD Haldwani Nanital Kuch din pahle repair kiya gya patch hai Sorry for the Inconvenience. Patch work completed Closed 2023-07-27 16:35:01 closed since 2 years ago 2023-08-04 19:42:41 Umesh joshi
120 1130 CD Haldwani Nanital Please fill this Under Jurisdiction of BRIDCUL Thanks Reverted 2023-07-21 18:15:02 reverted since 2 years ago 2023-07-27 11:28:18 SHANKAR DATT BRIJWASI
121 1131 CD Haldwani Nanital Please ise jaldi se jaldi theek Karva dijiye Hamen bahut problem ho rahi hai Under Jurisdiction of BRIDCUL THANKS Reverted 2023-07-21 18:19:00 reverted since 2 years ago 2023-07-27 11:26:29 Taniya
122 1136 CD Haldwani Nanital यह रोड की इस्थिति बहुत ही दयनीय है में श्रीमान मोहदय जी से निवेदन करता हु की मेरे और यहां से राह चलत... Under Jurisdiction of Nagar Nigam Haldwani Thanks Reverted to other Office 2023-07-23 18:46:00 reverted since 2 years ago 2023-07-24 20:45:29 Govind
123 1121 CD Haldwani Nanital Big hole on road cause accident.road conditions. Very poor This road is under jurisdiction of Nagar Nigam Haldwani. Reverted to other Office 2023-07-20 19:00:28 reverted since 2 years ago 2023-07-21 00:49:36 DINESH KUMAR
124 1104 CD Haldwani Nanital This is not the correct app.Call me back to point out SHORTCOMINGS on 8006063700 . Colonel Harish Jo... Under Jurisdiction of Nagar Nigam Haldwani Thanks Reverted to other Office 2023-07-18 13:19:13 reverted since 2 years ago 2023-07-19 19:05:10 Colonel Harish Joshi
125 1092 CD Haldwani Nanital यह रोड पानी को पाइप लाइन बिछाने के लिए खोदी गई थी, अब कोई इसे सही करवा दे तो आपकी बहुत कृपा होगी Under Jurisdiction of Nagar Nigam Haldwani Thanks Reverted to other Office 2023-07-16 08:44:38 reverted since 2 years ago 2023-07-17 23:20:16 Mahendra singh
126 1053 CD Haldwani Nanital Refering to the closed Feedback id 01017, The patches are still not filled with colatar,. WRONG PHOT... Patchwork completed by PCC . Closed 2023-07-10 16:20:03 closed since 2 years ago 2023-07-17 15:32:05 Advocate Tarang Mathpal
127 1077 CD Haldwani Nanital 6 month se bne hue h pr koi karwahi nhi hui Please contact to Concerned office. Reverted to other Office 2023-07-13 18:28:39 reverted since 2 years ago 2023-07-14 13:08:37 Pawan bhatt
128 1080 CD Haldwani Nanital लगभग दो वर्षों से यह मार्ग जानलेवा बना हुआ है कई दो पहिया वाहन गिर चुके हैं कई लोग चोट खा चुके हैं इ... Road is under jurisdiction of Nagar Nigam Haldwani. Reverted to other Office 2023-07-14 07:59:16 reverted since 2 years ago 2023-07-14 12:49:47 Madan Singh nauliya
129 1061 CD Haldwani Nanital इन रोड को जल्द गड्ढा मुक्त करे Currently road is under jurisdiction of BRIDCUL. Reverted to other Office 2023-07-11 17:31:22 reverted since 2 years ago 2023-07-14 12:45:53 Abhilash negi
130 1062 CD Haldwani Nanital बीच सड़क में गड्ढा हो जाने के कारण जल भराव हो रहा है Sorry for the Inconvenience. Patch repair work done. Closed 2023-07-11 17:49:01 closed since 2 years ago 2023-07-14 12:43:33 dinesh chandra
131 1019 CD Haldwani Nanital This road was constructed last winter. But due to pipe line work the whole road road is damaged from... कष्ट के लिए क्षमा चाहेंगे।जलसंस्थान को सूचित कर दिया गया है, उनके द्वारा ही साइट को ठीक किया जाना है... Closed 2023-07-06 07:12:57 closed since 2 years ago 2023-07-12 19:33:39 Pushpraj
132 1004 CD Haldwani Nanital The roads have been damaged due to some pipeline fitting work for the past couple of months. The peo... Due to rainy season, potholes repaired by GSB ie kachha patch work. Sorry for the Inconvenience. Closed 2023-07-04 10:44:28 closed since 2 years ago 2023-07-10 21:51:54 Nishchay Joshi
133 1052 CD Haldwani Nanital These pathes are on road from more Than 5 years please fix them and the road condition is also not v... Under Jurisdiction of Nagar Nigam Haldwani Reverted to other Office 2023-07-10 13:07:46 reverted since 2 years ago 2023-07-10 16:16:16 Manik Joshi
134 1017 CD Haldwani Nanital Please help, Completed Closed 2023-07-05 18:00:05 closed since 2 years ago 2023-07-10 16:15:15 Advocate Tarang Mathpal
135 1029 CD Haldwani Nanital This is the road made 2 yr back and the condition is getting worse. Leading to deposition of water a... Under Jurisdiction of Nagar Nigam Haldwani Thanks Reverted to other Office 2023-07-07 13:01:44 reverted since 2 years ago 2023-07-07 14:33:55 KS latwal
136 1018 CD Haldwani Nanital सड़क पर जानलेवा गड्डे इसको जल्द से जल्द सही कराने की कृपा करे कल भी इस गड्डे में एक टैंपो पलट गया था... This road is under jurisdiction of Nagar Nigam Haldwani.hence reverted Reverted to other Office 2023-07-05 18:18:54 reverted since 2 years ago 2023-07-07 09:18:53 Uves Siddiqui
137 937 CD Haldwani Nanital causing disturbance on the road. due to this iron grill.. Sorry for the Inconvenience. Grating laid . Hence closed Closed 2023-06-26 12:14:54 closed since 2 years ago 2023-07-06 02:01:27 mukul arya
138 851 CD Haldwani Nanital सड़क की स्थिति अत्यधिक खराब है, दुर्घटना की सम्भावना बनी हुई है कष्ट के लिए क्षमा है।यह मार्ग 200 मीटर लंबाई में है और 50% से अधिक क्षतिग्रस्त है ।सहायक अभियंता द्व... Closed 2023-06-19 18:31:13 closed since 2 years ago 2023-07-05 11:04:30 Kailash chandra
139 821 CD Haldwani Udham Singh Nagar Please get it repaired as it's in worst condition कष्ट के लिए क्षमा चाहेंगे ।यह मार्ग काफी क्षतिग्रस्त है ।पैच रिपेयर वर्क किया जाना संभव नहीं है। विध... Closed 2023-06-15 19:08:43 closed since 2 years ago 2023-07-05 10:53:13 Tara Singh
140 993 CD Haldwani Nanital Please repair the patches these patches are from harpal genral store to pal college in RTO ROAD कष्ट के लिए क्षमा चाहते हैं।वर्तमान में मार्ग काफी क्षतिग्रस्त है एवं पैच वर्क की श्रेणी में नहीं आत... Closed 2023-07-02 18:59:48 closed since 2 years ago 2023-07-05 09:55:58 Himanshu kothari
141 977 CD Haldwani Nanital Bahut bade bade gadhe ho gaye hai road me.. road cutting bhi kar kakhi hai kafi please fill kare sha... Renewal work is sanction on this road Closed 2023-07-01 09:31:43 closed since 2 years ago 2023-07-05 09:54:43 Himanshu kothari
142 808 CD Haldwani Udham Singh Nagar West Rajeev nagar rajbhar road कष्ट के लिए क्षमा चाहेंगे। वर्तमान में मार्ग काफी क्षतिग्रस्त है जिसका पैच मरम्मत किया जाना संभव नही... Closed 2023-06-14 10:06:05 closed since 2 years ago 2023-07-05 00:37:27 Vipin Rajbhar
143 751 CD Haldwani Udham Singh Nagar Sir main paschimi Rajiv Nagar koda Nala bindukhatta mein rahata hun Dhami Ji ki dukaan se andar ke l... कष्ट के लिए क्षमा चाहेंगे। वर्तमान में मार्ग की हालत अत्यंत खराब है जिसमें पैच मरम्मत किया जाना संभव... Closed 2023-06-07 16:08:00 closed since 2 years ago 2023-07-05 00:33:59 Ajeet Singh
144 924 CD Haldwani Nanital Sadkon per Pani jama ho jaaye ha वर्तमान में विभाग द्वारा मार्ग को गड्ढा मुक्त कर दिया गया है। कष्ट के लिए क्षमा चाहेंगे Closed 2023-06-25 13:30:52 closed since 2 years ago 2023-07-05 00:31:00 GOPAL DATT PATHAK
145 967 CD Haldwani Udham Singh Nagar Please repair these road , their road is not proper chances of accident are higher . Problem of trav... मार्ग की हालत वर्तमान में अत्यधिक खराब है जिसे पुनर्निर्माण किए जाने हेतु माननीय विधायक जी की संस्तु... Closed 2023-06-29 17:37:29 closed since 2 years ago 2023-07-05 00:29:31 Kamal Singh
146 988 CD Haldwani Nanital बहुत ज्यादा खतरनाक मेन हाईवे नैनीताल रोड पर कल मेरे सामने एक बच्चा मरते मरते बचा है आप सभी को पता है... मार्ग में कंक्रीट द्वारा गड्ढा भर दिया गया है ।कष्ट के लिए क्षमा चाहेंगे। उक्त स्थल पर पानी की लीकेज... Closed 2023-07-02 12:37:49 closed since 2 years ago 2023-07-05 00:28:10 Govind
147 992 CD Haldwani Udham Singh Nagar महोदय शास्त्री नगर 2nd तिकोनिया दीक्षा ट्रेडर्स के ठीक सामने से लेकर शास्त्री नगर 1st के बीच की रोड... कष्ट के लिए क्षमा चाहेंगे ।उक्त मार्ग की सरफेस काफी खराब है और मार्ग को पुनर्निर्माण की आवश्यकता है... Closed 2023-07-02 18:53:40 closed since 2 years ago 2023-07-05 00:27:01 Chandra sekhar Barshiliya
148 1002 CD Haldwani Nanital श्री मान छोटे वाहन में इस एक भरान से बहुत खतरा है बाक़ी विभाग की इच्छा Sorry for the Inconvenience. Patchwork completed.need to repair leakage of water supply pipeline by... Closed 2023-07-03 17:42:20 closed since 2 years ago 2023-07-04 19:10:23 Govind
149 989 CD Haldwani Nanital मैं तो कह रहा हूं क्या ही करते हो गड्डे भरकर। मस्त बरसात का मौसम है, जनता को तालाब का मजा लेने दो। Under Jurisdiction of Nagar Nigam Haldwani Thanks Reverted to other Office 2023-07-02 18:17:53 reverted since 2 years ago 2023-07-04 10:30:51 Mohit Kumar
150 801 CD Haldwani Udham Singh Nagar हमारे गांव की रोड का बुरा हाल रिपेयरिंग भी नहीं हुई है अभी तक कृपया जल्द से जल्द गड्ढा करवाने का कष्... Regretted for the Inconvenience. Patchwork completed. Closed 2023-06-13 13:46:18 closed since 2 years ago 2023-07-03 08:45:28 Chandra sekhar Barshiliya
151 974 CD Haldwani Nanital नई RCC Road AND RAMP 1 महीने पहले बना है जो उखाड़ना शरू हो गया हैं जिससे 2 3 और 4 व्हीलर दुर्घटना ग्र... Under Jurisdiction of Nagar Nigam Haldwani Thanks Reverted to other Office 2023-06-30 18:02:54 reverted since 2 years ago 2023-07-01 12:33:19 GURPREET SINGH
152 800 CD Haldwani Nanital The road leading from Gora Parao to the crusher is damaged from the beginning. It is full of pothole... This Road is under category of VR and need to reconstruction.hence not covered under patch repair wo... Closed 2023-06-13 12:03:33 closed since 2 years ago 2023-06-30 22:54:54 bhuwan Chandra Bhatt
153 912 CD Haldwani Nanital Road pr huaa gudda aur pul aur road ke joint m huaa gudda This is under jurisdiction of NHAI. Reverted to other Office 2023-06-24 17:17:02 reverted since 2 years ago 2023-06-30 22:52:47 Suresh Belwal
154 973 CD Haldwani Nanital महोदय महोदय उक्त रोड में बरसात के कारण लूडो में जगह-जगह गड्ढे हो चुके हैं गड्ढे होने के कारण सड़क पर... This Road is under jurisdiction of Nagar Nigam Haldwani.kindly take action against this account. Reverted to other Office 2023-06-30 14:06:10 reverted since 2 years ago 2023-06-30 22:49:13 Uves Siddiqui
155 314 CD Haldwani Nanital This road is full of faults, the road touching gas godam road to RTO road. I am using this road for... Need gate and currently road is designed for VR. Closed 2023-05-20 17:35:49 closed since 2 years ago 2023-06-28 16:02:27 Neeraj Singh
156 860 CD Haldwani Nanital Road के बीच में गड्ढा है। लंबाई लगभग 3 मीटर और चौड़ाई पूरे road को घेरे हुए है। Under Jurisdiction of Nagar Nigam Haldwani Thanks Reverted to other Office 2023-06-20 16:45:24 reverted since 2 years ago 2023-06-25 23:06:16 Mohit Kumar
157 770 CD Haldwani Udham Singh Nagar Please concern road Patch work completed Closed 2023-06-09 09:11:57 closed since 2 years ago 2023-06-24 13:20:01 Kamal Pandey
158 785 CD Haldwani Udham Singh Nagar 90 फीट शांतिनगर Patch work completed Thanks Closed 2023-06-10 19:34:40 closed since 2 years ago 2023-06-24 13:19:28 Bhuwan Chandra bhatt
159 852 CD Haldwani Udham Singh Nagar महोदय, उक्त सीसी रोड जब से बनी है तब से इसमें कोई पैच कार्य नही हुआ है बरसात के समय इसमें परेशानी का... Patch waork completed Thanks Closed 2023-06-19 19:16:52 closed since 2 years ago 2023-06-24 13:18:11 Kamal Pandey
160 643 CD Haldwani Nanital रास्ता मे जगह जगह गड़े बने है.. थोड़ा बहुत गड्ढे भरे भी मगर खाली खानापूर्ति के लिये. कृपया कार्य को पू... Marg per patch marammat ka karya purn kar liya gaya hai Dhanywad Closed 2023-05-30 13:46:50 closed since 2 years ago 2023-06-19 10:25:43 Yogesh
161 744 CD Haldwani Nanital Very poor condition of RTO road from Harpal General Store to Charayal chauraha Marg ke avedit bhag main navinikaran ka karya swikrit hai jisme agami 3 din main karya prarambh kiya... Closed 2023-06-06 17:28:56 closed since 2 years ago 2023-06-18 14:48:00 Rakesh Mishra
162 778 CD Haldwani Nanital सड़क काफी खराब हो गई है उसको रिपेयरिंग करने की आवश्यकता है Patchwork completed. Sorry for the Inconvenience Closed 2023-06-10 06:43:01 closed since 2 years ago 2023-06-18 11:53:10 Birendar Singh danu
163 812 CD Haldwani Nanital Maa Nanda Sunada Mandir Car road se Chandan Choching centre tak Patch completed. Sorry for Inconvenience Closed 2023-06-14 19:11:43 closed since 2 years ago 2023-06-18 11:52:38 Surjeet Singh
164 762 CD Haldwani Nanital Pothole repair please Under Jurisdiction of Nagar Nigam Haldwani Thanks Reverted to other Office 2023-06-08 13:15:36 reverted since 2 years ago 2023-06-17 10:27:32 Ashish tewari
165 648 CD Haldwani Nanital Sangam vihar phase 2 colony road yet not done patch work but the completed photograph sent from othe... Patch work completed Thanks with regards Closed 2023-05-30 15:10:37 closed since 2 years ago 2023-06-14 10:28:36 Mahesh Chandra Pandey
166 386 CD Haldwani Nanital There are multiple patches on the road connecting Ramri jasua to kathghariya. It leads to heavy part... Patch work completed Thanks with regards Closed 2023-05-21 20:57:09 closed since 2 years ago 2023-06-14 10:28:02 Rohit
167 405 CD Haldwani Nanital A lot of patches on road connecting Ramri jasua village to kathghariya. Patch work completed Thanks Closed 2023-05-22 09:51:14 closed since 2 years ago 2023-06-14 10:06:50 Rohit
168 577 CD Haldwani Nanital Very big size patches on the way Patch work completed Thanks Closed 2023-05-27 18:25:16 closed since 2 years ago 2023-06-14 10:06:04 Prakash
169 330 CD Haldwani Udham Singh Nagar Hamare yahan ki road mein bhi bahut gaddhe hain Patch work completed Thanks Closed 2023-05-20 22:51:40 closed since 2 years ago 2023-06-10 14:02:07 Ajeet Singh
170 739 CD Haldwani Udham Singh Nagar NH से कुछ ही दूरी पर शिव मंदिर से बोरिंगपट्टा व बिंदुखत्ता छेत्र को जोड़ने वाला पुल विगत वर्षो से सम... New construction needed. Hence it's not cover under patch repair. Reverted 2023-06-06 11:48:38 reverted since 2 years ago 2023-06-06 22:06:17 Mohit joshi
171 706 CD Haldwani Udham Singh Nagar सड़क पर लंबे समय से काम नहीं हुवा है। डामर उखड़ चुका है 15 साल से अभी तक कोई दुरुस्तीकरण नहीं हुवा ह... Road needed renewal. It's not cover under patch repair. Reverted 2023-06-04 11:26:47 reverted since 2 years ago 2023-06-06 22:05:04 Puran Hayat Singh
172 713 CD Haldwani Udham Singh Nagar Before the earliest road is pleased to repeat the road from the road is still renewed once. The road condition is very poor,need reconstruction. Complaint is not covered under Patch Repairing. Reverted 2023-06-04 15:59:26 reverted since 2 years ago 2023-06-06 22:03:25 Mohit joshi
173 519 CD Haldwani Nanital Pls repair immediately damage of road. Work done completed Closed 2023-05-25 10:42:24 closed since 2 years ago 2023-06-06 10:43:47 Hitesh kavidayal
174 211 CD Haldwani Nanital यह लालकुआँ गौला नदी को जाने वाली मेन रोड है, जिस पर हर दिन वाहन चलते है । यह लालकुआँ बिंदुखत्ता को ज... Now work has been done Closed 2023-05-19 15:06:59 closed since 2 years ago 2023-06-05 19:53:33 Raj Joshi
175 591 CD Haldwani Nanital सड़क पर खड़े है जिसको भरने का काम किया जाये Work has been completed. Closed 2023-05-28 15:38:52 closed since 2 years ago 2023-06-05 19:53:02 Puran Hayat Singh
176 704 CD Haldwani Nanital Please Repair it Under Jurisdiction of Nagar Nigam Haldwani Thanks Reverted to other Office 2023-06-04 08:44:48 reverted since 2 years ago 2023-06-05 17:26:13 Kawal Gujral
177 709 CD Haldwani Nanital Lakshmi vihar malli bamori m road mein gaddhe padhne ki vajah se yahan gadiyan gir rahi hai jisse lo... Under Jurisdiction of Nagar Nigam Haldwani Thanks Reverted to other Office 2023-06-04 12:29:24 reverted since 2 years ago 2023-06-05 17:21:00 Champa patwal
178 721 CD Haldwani Nanital गड्ढा है, ठीक कीजिए Under Jurisdiction of Nagar Nigam Haldwani Thanks Reverted to other Office 2023-06-05 11:58:47 reverted since 2 years ago 2023-06-05 17:17:40 Mohit Kumar
179 703 CD Haldwani Nanital The road is damaged from 5 years please remake it Roads is under jurisdiction of Nagar Nigam Haldwani Reverted to other Office 2023-06-04 08:39:40 reverted since 2 years ago 2023-06-05 17:11:22 Harish Chandra joshi
180 502 CD Haldwani Nanital सर नमस्कार मेरा नाम विजय कुमार है सन ऑफ पूरन कुमार समस्या ह है सर मेरा गांव विलेज -94 देवालचौर बंदोब... Work completed Closed 2023-05-24 20:58:35 closed since 2 years ago 2023-06-04 16:55:35 Vijay Kumar
181 682 CD Haldwani Nanital Ye gali no 3 mukhanj near vivekanand hospital k pas h.. is gali ko bane hue kafi time hogya hai.. ro... This Road is under jurisdiction of Nagar Nigam Haldwani Reverted to other Office 2023-06-01 16:14:33 reverted since 2 years ago 2023-06-02 15:25:37 Karan arora
182 684 CD Haldwani Nanital Fill the damp on road This Road is under jurisdiction of Nagar Nigam Haldwani Reverted to other Office 2023-06-01 18:16:05 reverted since 2 years ago 2023-06-02 15:24:27 Girish Chandra
183 685 CD Haldwani Nanital Road mai gaddha ban gaya hai canal Road Sheesh Mahal Kathgodam Mai Sai banquet hall k pass mother da... This Road is under jurisdiction of Nagar Nigam Haldwani. Reverted to other Office 2023-06-01 21:40:09 reverted since 2 years ago 2023-06-02 15:22:44 Umesh joshi
184 276 CD Haldwani Nanital Main Bazar carroad bindukhatta me Work completed. Closed 2023-05-20 09:53:24 closed since 2 years ago 2023-06-02 15:21:32 Bhuwan Chandra bhatt
185 563 CD Haldwani Nanital Dear Sir, This road was condtructed 4 years ago. now the road is totally distructed and a lot of pat... It's not cover under patchwork.need reconstruction/ renewal of road.instructed to concerned for... Reverted 2023-05-27 09:40:01 reverted since 2 years ago 2023-05-30 20:46:04 Vikram Singh
186 92 CD Haldwani Nanital Patch work needs. Kindly visit and solve the matter. Thanks Sorry'for the inconvenience. Patchwork completed Closed 2023-05-18 15:22:49 closed since 2 years ago 2023-05-30 20:41:31 Mahesh Chandra Pandey
187 218 CD Haldwani Nanital डहरिया से धान मिल रोड की स्थिति बहुत ज्यादा बुरी हालत में है पूरी रोड में हर जगह गड्ढे ही गड्ढे हैं... Sorry for the inconvenience.patchwork completed Closed 2023-05-19 16:32:42 closed since 2 years ago 2023-05-30 20:40:57 Atul pant
188 420 CD Haldwani Nanital हिरन बाबा मन्दिर और आईटीबीपी मन्दिर के मध्य खैरानी बिंदुखत्ता में Patchwork completed. Sorry for Inconvenience Closed 2023-05-22 16:43:02 closed since 2 years ago 2023-05-30 20:40:07 Bhuwan Chandra bhatt
189 468 CD Haldwani Nanital कुसुमखेड़ा लामाचौर मोटर मार्ग मैं किमी 1 मैं मदर डेयरी दुकान के पास पैच बना हुआ है कृपया आवश्यक कार्य... Patch completed Closed 2023-05-23 22:18:27 closed since 2 years ago 2023-05-30 20:39:09 Vikku
190 580 CD Haldwani Nanital Village ke pure Road Damage hue ha..bure tarah..pure Village ke Road Repair hone ha.. उक्त रोड पैच मरम्मत की श्रेणी में नहीं आती हैं। मार्ग को पुनर्निर्माण की अवश्यकता है। प्राथिमकता के... Reverted 2023-05-27 19:19:13 reverted since 2 years ago 2023-05-30 20:19:39 Prakash chandra Bhatt
191 581 CD Haldwani Nanital Several pits on this road. Under Jurisdiction of Nagar Nigam Haldwani Reverted to other Office 2023-05-27 22:28:04 reverted since 2 years ago 2023-05-30 10:26:38 Himmat Singh Rautela
192 230 CD Haldwani Nanital मान्यवर दोनों कालोनी के लोग इसी मार्ग से आना जाना करते हैं क्योंकि यह मुख्य मार्ग हैं जो कि अत्यन्त... Work done Closed 2023-05-19 17:52:09 closed since 2 years ago 2023-05-30 02:00:53 Abhishek Dwivedi
193 280 CD Haldwani Nanital महोदय, ये मार्ग ग्राम सूपीभगवानपुर का मुख्य मार्ग है जोकि मोटहल्दु गन्ना सेंटर बाईपास सड़क पर जुड़ता... Patch completed. Hence closed Closed 2023-05-20 10:55:12 closed since 2 years ago 2023-05-30 02:00:29 Dinesh Chandra Joshi
194 597 CD Haldwani Nanital Please patch the road Road is under jurisdiction of NHAI Reverted to other Office 2023-05-28 19:22:42 reverted since 2 years ago 2023-05-28 21:24:16 rajeevmohanbirkhani
195 586 CD Haldwani Nanital Pls repair Road is under jurisdiction of Nagar Nigam. Reverted to other Office 2023-05-28 11:11:17 reverted since 2 years ago 2023-05-28 21:22:14 Satendra Singh
196 587 CD Haldwani Nanital Road is damaged Road under jurisdiction of Nagar Nigam Haldwani. Reverted to other Office 2023-05-28 12:27:08 reverted since 2 years ago 2023-05-28 21:21:12 Anshul
197 521 CD Haldwani Nanital Tjaw much time to repair patch Sorry for Inconvenience. Patch work done. Closed 2023-05-25 11:40:27 closed since 2 years ago 2023-05-28 14:07:25 Umesh joshi
198 156 CD Haldwani Nanital Bhut Bure haal he puri ke puri 1600 miter road ki ..bnwa dijiye sir plese Sorry for inconvenience. Team has been done. Closed 2023-05-19 09:57:05 closed since 2 years ago 2023-05-27 19:56:09 Yogesh
199 271 CD Haldwani Nanital A hole in the road from long time.It may cause road accident.Please repair this patch. Sorry for inconvenience. The potholes appear due to leakage of water pipe line. But our team have do... Closed 2023-05-20 09:10:32 closed since 2 years ago 2023-05-27 19:53:22 Chetan papnai
200 208 CD Haldwani Nanital A bus driver wash their bus daily in road side Regretted for Inconvenience. Patch work finished. Closed 2023-05-19 14:40:38 closed since 2 years ago 2023-05-26 21:01:56 Bhuwan Chandra bhatt
201 509 CD Haldwani Nanital Please Repair This. Sorry for inconvenience.we are trying to dispose tender ASAP Closed 2023-05-25 08:30:51 closed since 2 years ago 2023-05-26 16:20:23 Deepak Sanwal
202 510 CD Haldwani Nanital Please Repair this. Sorry for inconvenience.we are trying to dispose tender ASAP Closed 2023-05-25 08:31:37 closed since 2 years ago 2023-05-26 16:19:38 Deepak Sanwal
203 541 CD Haldwani Nanital लगभग 50 मीटर की यह सड़क गड्ढों से भरी पड़ी है। जिसमें हमेशा पानी भरा रहता है। Under Jurisdiction of Nagar Nigam Haldwani Reverted to other Office 2023-05-26 07:15:35 reverted since 2 years ago 2023-05-26 08:50:06 Mohit Kumar
204 491 CD Haldwani Nanital Please repair This mattress. Regretted for inconvenience. We are trying to dispose tender as soon as possible. Closed 2023-05-24 13:50:36 closed since 2 years ago 2023-05-25 15:18:39 Deepak Sanwal
205 471 CD Haldwani Nanital See the condition of road in light showers yesterday. Water has accumulated even in light rain. What... This Road is under jurisdiction of Nagar Nigam Haldwani Reverted to other Office 2023-05-24 08:39:32 reverted since 2 years ago 2023-05-24 21:08:27 Puran Singh Bisht
206 483 CD Haldwani Nanital बरसात आने से पहले ही यह हाल है शिव विहार कॉलोनी मेहरा जनरल स्टोर के सामने गोलमोल से 200 मीटर आगे Current This road is under jurisdiction of Nagar Nigam Haldwani Reverted to other Office 2023-05-24 11:10:36 reverted since 2 years ago 2023-05-24 21:06:25 Kishan Singh kuloura
207 450 CD Haldwani Nanital आए दिन लोग गिर रहे है । 3 मीटर की रोड है लेकिन बड़े बड़े ट्रक ट्रेक्टर ट्राली चलती है Under Jurisdiction of Nagar Nigam Haldwani Reverted to other Office 2023-05-23 13:24:41 reverted since 2 years ago 2023-05-24 11:17:35 Harish Adhikari
208 192 CD Haldwani Nanital Footpath main hole is open and people may fall and injured असुविधा के लिए खेद है ।मार्ग को ठीक कर दिया गया है Closed 2023-05-19 12:43:36 closed since 2 years ago 2023-05-23 22:49:03 DINESH KUMAR
209 219 CD Haldwani Nanital यह रोड नीलम कॉलोनी से लहरिया धान मिल हो जाती है इस रोड बहुत ही ज्यादा क्षतिग्रस्त है जगह जगह बहुत बड... असुविधा के लिए खेद है ।यह मार्ग वर्तमान में नगर निगम के स्वामित्व में है ।इस मार्ग के सुदृढ़ीकरण के... Closed 2023-05-19 16:36:06 closed since 2 years ago 2023-05-23 22:47:23 Atul pant
210 340 CD Haldwani Nanital It in front of Government school,10 m ahead of mehfill restaurant. यह मार्ग एनएचएआई के अधीन है अतः पैच रिपेयर की कार्यवाही संबंधित विभाग द्वारा की जाएगी Reverted to other Office 2023-05-21 08:13:00 reverted since 2 years ago 2023-05-23 22:41:54 Krishna joshi
211 339 CD Haldwani Nanital The potholes are in front of the mehfill restaurant,big vehicles try to avoid the potholes creating... यह मार्ग यह मार्ग एनएचएआई के क्षेत्र के अधीन है अतः पैच से संबंधित कार्यवाही संबंधित विभाग द्वारा ही... Reverted to other Office 2023-05-21 08:09:06 reverted since 2 years ago 2023-05-23 22:41:06 Krishna joshi
212 355 CD Haldwani Nanital The condition is very poor and in the rainy season the road is very slippery please solve it असुविधा के लिए माफी चाहेंगे ।यह मार्ग कच्चा है, पैच संबंधी शिकायत से संबंधित नहीं है। Closed 2023-05-21 11:05:38 closed since 2 years ago 2023-05-23 22:34:33 Ishwar joshi
213 348 CD Haldwani Nanital रोड में गड्डे Under Jurisdiction of Nagar Nigam Haldwani Reverted to other Office 2023-05-21 10:12:00 reverted since 2 years ago 2023-05-23 21:27:23 R K verma
214 441 CD Haldwani Nanital महोदय राज विहार रोड में अनेक जगह पर बड़े बड़े गड्ढे तथा मानकों के विपरित स्पीड ब्रेकर बने हुए हैं कृ... Under Jurisdiction of Nagar Nigam Haldwani Reverted to other Office 2023-05-23 10:13:04 reverted since 2 years ago 2023-05-23 11:10:37 Pankaj Bhatt
215 354 CD Haldwani Nanital Dangerous for driving Under Jurisdiction of Nagar Nigam Haldwani Reverted to other Office 2023-05-21 10:55:38 reverted since 2 years ago 2023-05-22 10:59:36 RAJAN PANT
216 399 CD Haldwani Nanital See the condition of road. Our repeated pleas with Nagar Nigam have gone unheard. Kindly construct t... Under Jurisdiction of Nagar Nigam Haldwani Reverted to other Office 2023-05-22 08:02:07 reverted since 2 years ago 2023-05-22 10:56:01 Puran Singh Bisht
217 319 CD Haldwani Nanital Gaula pul ke pass aur gaula pul ke upper gudda ho gya hai Under Jurisdiction of NHAI Reverted to other Office 2023-05-20 18:53:15 reverted since 2 years ago 2023-05-21 19:45:03 Suresh Belwal
218 320 CD Haldwani Nanital Gaulapul m gudde hue h bhaut chote chote UNDER Jurisdiction of NHAI Haldwani Reverted to other Office 2023-05-20 18:56:48 reverted since 2 years ago 2023-05-21 19:44:11 Suresh Belwal
219 366 CD Haldwani Nanital Steaun road haldwani Under Jurisdiction of Nagar Nigam Haldwani Reverted to other Office 2023-05-21 15:08:06 reverted since 2 years ago 2023-05-21 19:33:40 Sanju Upreti
220 367 CD Haldwani Nanital Steaun rod haldwani Under Jurisdiction of Nagar Nigam Haldwani Reverted to other Office 2023-05-21 15:10:42 reverted since 2 years ago 2023-05-21 19:31:42 Sanju Upreti
221 227 CD Haldwani Nanital Namaskar sir Plz help me माननीय विधायक जी को कितनी बार लीटर दे दिया और ग्राम प्रधान जी को भी कितनी ब... New construction work , required sanction Reverted 2023-05-19 17:33:57 reverted since 2 years ago 2023-05-20 11:00:27 Mahesh Chandra
222 243 CD Haldwani Nanital Road should have been repaired,as it is main road of cmt colony .Since 2 years no repair.People are... Road Under Nagar Nigam Jurisdiction Reverted to other Office 2023-05-19 18:49:22 reverted since 2 years ago 2023-05-20 10:52:44 Ram datt Paliwal
223 90 CD Haldwani Nanital The condition of road is very bad. It is totally damaged. The stones lying on the road hit the gates... Road is under jurisdiction of Nagar Nigam Haldwani Reverted to other Office 2023-05-18 14:53:52 reverted since 2 years ago 2023-05-19 17:27:28 Puran Singh Bisht
224 151 CD Haldwani Nanital महोदय आपको अवगत कराना चाहते हैं कि हमारे मोहल्ले मित्र पुरम जवाहर ज्योति वार्ड नंबर 37 दमुआ ढुंगा की... Road Under Nigam jurisdiction Reverted to other Office 2023-05-19 09:41:20 reverted since 2 years ago 2023-05-19 17:24:28 Pawan kanojiya
225 88 CD Haldwani Nanital Pls check this road Road is under jurisdiction of Nagar Nigam Haldwani Reverted to other Office 2023-05-18 14:39:23 reverted since 2 years ago 2023-05-19 17:22:37 Shahrukh Khan
226 158 CD Haldwani Nanital Pls check line number 17 Azad Nagar haldwani Under Jurisdiction of Nagar Nigam Reverted to other Office 2023-05-19 10:03:47 reverted since 2 years ago 2023-05-19 17:18:22 Shahrukh Khan
227 159 CD Haldwani Nanital Nainital district ke golapar Kheda police chauki se Circuit House ko jaane wali road Jo kathgodam ko... Road is under jurisdiction of NHAI Reverted to other Office 2023-05-19 10:08:07 reverted since 2 years ago 2023-05-19 17:17:45 Harish Chandra Barola
228 167 CD Haldwani Nanital Repairing work in road .. near base Kingdom school Road Under jurisdiction of Nagar Nigam Reverted to other Office 2023-05-19 10:25:32 reverted since 2 years ago 2023-05-19 17:16:57 Suresh Joshi
229 161 CD Haldwani Nanital गांव की सभी सड़कें कच्ची हैँ और जो बनी भी है वो गड्ढा युक्त हैँ जिस कारण दुर्घटना की संभावना हमेशा बन... Demand is based on new construction and area is under jurisdiction of Nagar Nigam Reverted to other Office 2023-05-19 10:12:08 reverted since 2 years ago 2023-05-19 17:16:41 Bhuwan Tiwari
230 179 CD Haldwani Nanital Please verify & Fill this Road is under jurisdiction of Nagar Nigam Haldwani Reverted to other Office 2023-05-19 11:32:22 reverted since 2 years ago 2023-05-19 17:12:24 Chetan papnai
231 203 CD Haldwani Nanital नारायण नगर इंटर कॉलेज वाली रोड में इंटर कॉलेज के पास में बहुत बड़े-बड़े गड्ढे हो गए हैं जिससे एक्सीड... Road is under jurisdiction of Nagar Nigam Haldwani Reverted to other Office 2023-05-19 14:14:17 reverted since 2 years ago 2023-05-19 17:10:57 Santosh bhatt
232 163 CD Haldwani Nanital Condition of road is very bad. The public and residents of the colony are undergoing a lot of proble... Road Under Jurisdiction of Nagar Nigam Haldwani Reverted to other Office 2023-05-19 10:16:37 reverted since 2 years ago 2023-05-19 17:09:31 Puran Singh Bisht