Category: Tenders
Order Files by:
Default | Name | Date | Hits
Documents for Downloads: 20
pdf0Consultancy Service For Condition Survey Report of the existing class “B” bridges required for the upgradtion of the bridges into Class “A” loading bridges
Created by
Manoj
Date 12-Mar-2025
(Changed )
File Size 340.34 KB
Download 169
(0 votes)
pdf1Corrigendum (III) - Extension of Date for Expression of Interest (EOI) For The Consulting Assignment Preparation of DPR for New Long Bridges on the Ring Road along the Tehri Lake in Distt. Tehri Garhwal, Uttarakhand, India
Created by
Manoj
Date 14-Oct-2024
(Changed )
File Size 584.82 KB
Download 353
(0 votes)
pdf2Corrigendum (II) - Extension of Date for Expression of Interest (EOI) For The Consulting Assignment Preparation of DPR for New Long Bridges on the Ring Road along the Tehri Lake in Distt. Tehri Garhwal, Uttarakhand, India
Created by
Manoj
Date 03-Oct-2024
(Changed )
File Size 481.13 KB
Download 290
(0 votes)
jpg3Corrigendum - Expression of Interest (EOI) For The Consulting Assignment Preparation of DPR for New Long Bridges on the Ring Road along the Tehri Lake in Distt. Tehri Garhwal, Uttarakhand, India ZIP File
corrigendum
Created by
Manoj
Date 13-Sep-2024
(Changed Date 13-Sep-2024)
File Size 133.92 KB
Download 299
(1 vote)
rar4Expression of Interest (EOI) For The Consulting Assignment Preparation of Detailed Project Report for New Long Bridges on the Ring Road along the Tehri Lake inDistt. Tehri Garhwal, Uttarakhand, India ZIP File
Created by
Prem Thapaliyal
Date 10-Sep-2024
(Changed Date 10-Sep-2024)
File Size 2.64 MB
Download 249
(2 votes)
pdf5प्रोजेक्ट मैनेजमेंट एवं इंजीनियरिंग कन्सलटेन्सी विज्ञप्ति प्रकाशन के सम्बन्ध में।
Created by
Prem Thapaliyal
Date 10-Sep-2024
(Changed Date 10-Sep-2024)
File Size 655.95 KB
Download 289
(0 votes)
pdf6Expression of Interest (EOI) For The Consulting Assignment Preparation of Detailed Project Report for New Long Bridges on the Ring Road along the Tehri Lake inDistt. Tehri Garhwal, Uttarakhand, India
Created by
Prem Thapaliyal
Date 10-Sep-2024
(Changed Date 10-Sep-2024)
File Size 2.66 MB
Download 289
(1 vote)
pdf7Installation of Crash Barrier and Protection works from 0.00 to 36.00 & 70.00 to 84.20 of NHn 107(a) & from Km. 0.00 to 18.70 of NH 107 (Old 109) in the State of Uttarakhand under Road Safety Annual Plan 2023-24
Created by
Prem Thapaliyal
Date 03-Sep-2024
(Changed Date 03-Sep-2024)
File Size 800.45 KB
Download 264
(0 votes)
pdf8Work in Km 26 (CH.25.500 to 25.00) and Km 294 (Ch 293.00 to 293.00) of NH -58 (New -07) under Short Term Maintenance work 2023-24HOT
Created by
Prem Thapaliyal
Date 05-Dec-2023
(Changed Date 05-Dec-2023)
File Size 2.1 MB
Download 513
(1 vote)
pdf9Construction of Temporary Runway for Gyrocopter at Bairagi Camp HaridwarHOT
Created by
Prem Thapaliyal
Date 06-May-2023
(Changed Date 06-May-2023)
File Size 2.05 MB
Download 635
(0 votes)
pdf10Providing and fixing of Thrie metal beam crash barrier at accident prone areas from Km. 16.000 to 55.000 and Improvement -widening of junction in km. 52 & km 54 on NH-334A in the state of Uttarakhand under Annual plan (2022-23)
Created by
Prem Thapaliyal
Date 06-Mar-2023
(Changed Date 06-Mar-2023)
File Size 1.4 MB
Download 439
(0 votes)
pdf11Treatement of 04 no. of landslide zone from Dharasu to Yamnotri on NH-134 (old NH-94) in the State of Uttarakhand under EPC mode in NH(O) Annual Plan 2022-23HOT
Created by
Prem Thapaliyal
Date 25-Feb-2023
(Changed Date 25-Feb-2023)
File Size 260.04 KB
Download 659
(0 votes)
pdf12Strengthening work from Zero point (Junction of Lal bahadur Shastri National Academy of Administration) to Library Chowk Mussoorie (Ch. 160.00 to 161.50 Km) in the section of NH-707A (Tyuni-Chakrata-Mussoorie- Dhanaulti-New Tehri) in the State of Uttarakh
Created by
Prem Thapaliyal
Date 14-Feb-2023
(Changed Date 14-Feb-2023)
File Size 253.74 KB
Download 432
(0 votes)
pdf13Strengthening and improvement of NH-58 (New NH-07) in chainage km. 349.800 to 355.495 and Strengthening and improvement of NH-109 (New NH-107) in ?Chainage km 0.100 to 1.400 under Annual Plan of NH(O) 2022-23 in the State of Uttarakhand
Created by
Prem Thapaliyal
Date 14-Feb-2023
(Changed Date 14-Feb-2023)
File Size 251.74 KB
Download 427
(0 votes)
pdf14Strengthening work from Km 37 to 70 on NH 107 (A) under Annual Plan of NH(O) 2022-23 in the State of Uttarakhand
Created by
Prem Thapaliyal
Date 14-Feb-2023
(Changed Date 14-Feb-2023)
File Size 246.89 KB
Download 456
(0 votes)
pdf15In Reference of G-20 Summit in 2023 Improvement of Road km. 229.700 to 235.900 to NH -58
Created by
Prem Thapaliyal
Date 14-Feb-2023
(Changed Date 14-Feb-2023)
File Size 211.56 KB
Download 444
(0 votes)
pdf161547HOT
Created by
Date 28-Oct-2021
(Changed Date 28-Oct-2021)
File Size 2.56 MB
Download 1,214
(1 vote)
pdf172882HOT
Created by
Date 28-Oct-2021
(Changed Date 28-Oct-2021)
File Size 2 MB
Download 913
(1 vote)
pdf183128HOT
Created by
Date 28-Oct-2021
(Changed Date 28-Oct-2021)
File Size 2.37 MB
Download 935
(0 votes)
pdf193145HOT
Created by
Date 28-Oct-2021
(Changed Date 28-Oct-2021)
File Size 2.57 MB
Download 876
(1 vote)
Latest Documents