Category: Tenders
Order Files by:
Default | Name | Date | Hits
Documents for Downloads: 21
unknown0Requirement Notice for PMU ADB funded ProjectNEW

Requirement Notice for PMU ADB funded Project

Created by
Manoj Kumar Bisht
Date 19-Nov-2025
(Changed Date 19-Nov-2025)
Download 0
(26 votes)
pdf1Consultancy Service For Condition Survey Report of the existing class “B” bridges required for the upgradtion of the bridges into Class “A” loading bridgesHOT
Created by
Manoj
Date 12-Mar-2025
(Changed )
File Size 340.34 KB
Download 821
(2 votes)
pdf2Corrigendum (III) - Extension of Date for Expression of Interest (EOI) For The Consulting Assignment Preparation of DPR for New Long Bridges on the Ring Road along the Tehri Lake in Distt. Tehri Garhwal, Uttarakhand, IndiaHOT
Created by
Manoj
Date 14-Oct-2024
(Changed )
File Size 584.82 KB
Download 625
(0 votes)
pdf3Corrigendum (II) - Extension of Date for Expression of Interest (EOI) For The Consulting Assignment Preparation of DPR for New Long Bridges on the Ring Road along the Tehri Lake in Distt. Tehri Garhwal, Uttarakhand, India
Created by
Manoj
Date 03-Oct-2024
(Changed )
File Size 481.13 KB
Download 483
(0 votes)
jpg4Corrigendum - Expression of Interest (EOI) For The Consulting Assignment Preparation of DPR for New Long Bridges on the Ring Road along the Tehri Lake in Distt. Tehri Garhwal, Uttarakhand, India ZIP File HOT
corrigendum
Created by
Manoj
Date 13-Sep-2024
(Changed Date 13-Sep-2024)
File Size 133.92 KB
Download 626
(1 vote)
rar5Expression of Interest (EOI) For The Consulting Assignment Preparation of Detailed Project Report for New Long Bridges on the Ring Road along the Tehri Lake inDistt. Tehri Garhwal, Uttarakhand, India ZIP File
Created by
Prem Thapaliyal
Date 10-Sep-2024
(Changed Date 10-Sep-2024)
File Size 2.64 MB
Download 421
(2 votes)
pdf6प्रोजेक्ट मैनेजमेंट एवं इंजीनियरिंग कन्सलटेन्सी विज्ञप्ति प्रकाशन के सम्बन्ध में। HOT
Created by
Prem Thapaliyal
Date 10-Sep-2024
(Changed Date 10-Sep-2024)
File Size 655.95 KB
Download 554
(0 votes)
pdf7Expression of Interest (EOI) For The Consulting Assignment Preparation of Detailed Project Report for New Long Bridges on the Ring Road along the Tehri Lake inDistt. Tehri Garhwal, Uttarakhand, India
Created by
Prem Thapaliyal
Date 10-Sep-2024
(Changed Date 10-Sep-2024)
File Size 2.66 MB
Download 483
(1 vote)
pdf8Installation of Crash Barrier and Protection works from 0.00 to 36.00 & 70.00 to 84.20 of NHn 107(a) & from Km. 0.00 to 18.70 of NH 107 (Old 109) in the State of Uttarakhand under Road Safety Annual Plan 2023-24
Created by
Prem Thapaliyal
Date 03-Sep-2024
(Changed Date 03-Sep-2024)
File Size 800.45 KB
Download 414
(0 votes)
pdf9Work in Km 26 (CH.25.500 to 25.00) and Km 294 (Ch 293.00 to 293.00) of NH -58 (New -07) under Short Term Maintenance work 2023-24HOT
Created by
Prem Thapaliyal
Date 05-Dec-2023
(Changed Date 05-Dec-2023)
File Size 2.1 MB
Download 679
(1 vote)
pdf10Construction of Temporary Runway for Gyrocopter at Bairagi Camp HaridwarHOT
Created by
Prem Thapaliyal
Date 06-May-2023
(Changed Date 06-May-2023)
File Size 2.05 MB
Download 799
(0 votes)
pdf11Providing and fixing of Thrie metal beam crash barrier at accident prone areas from Km. 16.000 to 55.000 and Improvement -widening of junction in km. 52 & km 54 on NH-334A in the state of Uttarakhand under Annual plan (2022-23)HOT
Created by
Prem Thapaliyal
Date 06-Mar-2023
(Changed Date 06-Mar-2023)
File Size 1.4 MB
Download 569
(0 votes)
pdf12Treatement of 04 no. of landslide zone from Dharasu to Yamnotri on NH-134 (old NH-94) in the State of Uttarakhand under EPC mode in NH(O) Annual Plan 2022-23HOT
Created by
Prem Thapaliyal
Date 25-Feb-2023
(Changed Date 25-Feb-2023)
File Size 260.04 KB
Download 841
(0 votes)
pdf13Strengthening work from Zero point (Junction of Lal bahadur Shastri National Academy of Administration) to Library Chowk Mussoorie (Ch. 160.00 to 161.50 Km) in the section of NH-707A (Tyuni-Chakrata-Mussoorie- Dhanaulti-New Tehri) in the State of UttarakhHOT
Created by
Prem Thapaliyal
Date 14-Feb-2023
(Changed Date 14-Feb-2023)
File Size 253.74 KB
Download 595
(0 votes)
pdf14Strengthening and improvement of NH-58 (New NH-07) in chainage km. 349.800 to 355.495 and Strengthening and improvement of NH-109 (New NH-107) in ?Chainage km 0.100 to 1.400 under Annual Plan of NH(O) 2022-23 in the State of UttarakhandHOT
Created by
Prem Thapaliyal
Date 14-Feb-2023
(Changed Date 14-Feb-2023)
File Size 251.74 KB
Download 601
(0 votes)
pdf15Strengthening work from Km 37 to 70 on NH 107 (A) under Annual Plan of NH(O) 2022-23 in the State of UttarakhandHOT
Created by
Prem Thapaliyal
Date 14-Feb-2023
(Changed Date 14-Feb-2023)
File Size 246.89 KB
Download 596
(0 votes)
pdf16In Reference of G-20 Summit in 2023 Improvement of Road km. 229.700 to 235.900 to NH -58HOT
Created by
Prem Thapaliyal
Date 14-Feb-2023
(Changed Date 14-Feb-2023)
File Size 211.56 KB
Download 573
(0 votes)
pdf171547HOT
Created by
Date 28-Oct-2021
(Changed Date 28-Oct-2021)
File Size 2.56 MB
Download 1,417
(1 vote)
pdf182882HOT
Created by
Date 28-Oct-2021
(Changed Date 28-Oct-2021)
File Size 2 MB
Download 1,086
(1 vote)
pdf193128HOT
Created by
Date 28-Oct-2021
(Changed Date 28-Oct-2021)
File Size 2.37 MB
Download 1,128
(0 votes)
pdf203145HOT
Created by
Date 28-Oct-2021
(Changed Date 28-Oct-2021)
File Size 2.57 MB
Download 1,051
(1 vote)