ID :1357
R.C.C Bridle Bridge Over Malkoti Gad near Village Sera
on Chainage 3.400 of road unknown
In District Chamoli Under CD Pokhari Division
Critical Report on Bridge Condition
Form Filled By ANKIT SINGH [42270313M02425]
Inspection Team
Detail Report
| # | Parameter | Problem ? | How Bad? | How Much? | |
|---|---|---|---|---|---|
| 1 | ROAD APPROCHES AND DECK Component Weightage 10 | ||||
| A- ROAD SURFACE NEAR BRIDGE | |||||
| a) Bumpy road surface near bridge? | Yes | Not So Bad | Not Much Qty | 1 | |
| B- DRAINAGE | |||||
| a) Badly built road drainage near bridge? | Yes | Not So Bad | Much Qty | 3 | |
| b) Blocked or damaged road drains? | Yes | Not So Bad | Some Qty | 2 | |
| c) Water on the deck? | Yes | Not So Bad | Some Qty | 2 | |
| d) Blocked or damaged deck drains? | Yes | Not So Bad | Much Qty | 3 | |
| C- WEARING COAT | |||||
| CONCRETE WEARING COURSE | |||||
| a) Cracking? | Yes | Not So Bad | Some Qty | 2 | |
| b) Spalling? | Yes | Not So Bad | Not Much Qty | 1 | |
| c) Reinforcement exposed? | Yes | Not So Bad | Not Much Qty | 1 | |
| d) Poor concrete? | Yes | Not So Bad | Some Qty | 2 | |
| e) Wear of surface due to small stones? | Yes | Not So Bad | Some Qty | 2 | |
| D- KERBS & FOOTPATHS | |||||
| a) Loose railing fixtures? | Yes | Not So Bad | Some Qty | 2 | |
| a) Damaged or loose kerbs? | Yes | Not So Bad | Some Qty | 2 | |
| 2 | PARAPETS, RAILINGS AND CRASH BARRIERS Component Weightage 10 | ||||
| a) Impact damaged? | Yes | Very Bad | Much Qty | 9 | |
| b) Loose or damaged fixings? | Yes | Very Bad | Not Much Qty | 7 | |
| c) Loose base of posts? | Yes | Very Bad | Some Qty | 8 | |
| d) Damaged coatirig or paint on steel surface? | Yes | Bad | Some Qty | 5 | |
| e) Corrosion on steel surface? | Yes | Very Bad | Some Qty | 8 | |
| f) Cracking on Masonary Parapets? | Yes | Very Bad | Some Qty | 8 | |
| g) Movement or bending of parapet? | Yes | Very Bad | Some Qty | 8 | |
| h) Poor pointing/ Plaster on parapet? | Yes | Very Bad | Not Much Qty | 7 | |
| i) Deterioration of bricks or stones? | Yes | Bad | Some Qty | 5 | |
| 3 | EXPANSION JOINT AT ABUTMENTS & PIERS Component Weightage 10 | ||||
| a) Damage to concrete of deck end or dirt wall near joint? | Not Applicable | -- | -- | -- | |
| b) Debris or vegetation in joint? | Yes | Not So Bad | Not Much Qty | 1 | |
| c) Loose or damaged fixtures? | Yes | Bad | Not Much Qty | 4 | |
| d) Damage or corrosion to metal parts? | Yes | Not So Bad | Some Qty | 2 | |
| e) Damage to rubber waterseals? | NO Problem | -- | -- | 0 | |
| 4 | RIVER Component Weightage 10 | ||||
| A- BLOCKAGES IN WATERWAY | |||||
| a) Debris against piers or abutments? | Yes | Not So Bad | Not Much Qty | 1 | |
| b) Remains of old bridge under or upstream of the bridge? | Yes | Not So Bad | Some Qty | 2 | |
| c) Fencing or buildings under bridge? | Yes | Not So Bad | Some Qty | 2 | |
| d) Trees or bushes.growing under bridge? | Yes | Not So Bad | Not Much Qty | 1 | |
| B- CHANGE IN RIVER COURSE | |||||
| a) River changing path upstream of bridge? | Yes | Not So Bad | Some Qty | 2 | |
| b) New islands forming upstream of bridge? | Yes | Not So Bad | Not Much Qty | 1 | |
| C- RIVER TRAINING WORKS | |||||
| a) River attack beyond the upstream end of river training works? | Yes | Not So Bad | Not Much Qty | 1 | |
| b) Damage to walls? | Yes | Not So Bad | Not Much Qty | 1 | |
| c) Loss of pitching? | NO Problem | -- | -- | 0 | |
| d) Damage to crates, timber, fencing, etc.? | Yes | Not So Bad | Some Qty | 2 | |
| e) Damage to trees? | Yes | Not So Bad | Some Qty | 2 | |
| 5 | SUPERSTRUCTURE Component Weightage 60 | ||||
| CONCRETE | |||||
| General | |||||
| a) Impact damage to girders, trusses or bracings? | Yes | Not So Bad | Not Much Qty | 1 | |
| b) Debris or vegetation on beams, girders, trusses bracings or joints? | Yes | Not So Bad | Not Much Qty | 1 | |
| c) Water coming through the deck? | NO Problem | -- | -- | 0 | |
| d) Water from the deck drainage flowing on to girders, trusses, beams or bracings? | Yes | Not So Bad | Not Much Qty | 1 | |
| e) Not enough vertical & horizontal clearances? | NO Problem | -- | -- | 0 | |
| CONCRETE BEAMS | |||||
| a) Cracking? | Yes | Not So Bad | Some Qty | 2 | |
| b) Spalling? | NO Problem | -- | -- | 0 | |
| c) Corrosion of reinforcement? | Yes | Not So Bad | Not Much Qty | 1 | |
| d) Poor concrete? | NO Problem | -- | -- | 0 | |
| CONCRETE UNDERSIDE OF DECK | |||||
| a) Cracking? | Yes | Not So Bad | Not Much Qty | 1 | |
| b) Spalling? | NO Problem | -- | -- | 0 | |
| c) Reinforcement corrosion? | Yes | Not So Bad | Not Much Qty | 1 | |
| d) Poor concrete? | Yes | Not So Bad | Not Much Qty | 1 | |
| e) Less cover to reinforcement? | Yes | Not So Bad | Not Much Qty | 1 | |
| 6 | BEARINGS Component Weightage 10 | ||||
| NOT APPLICABLE | |||||
| 7 | Right Side ABUTMENT, WING WALLS & RETAINING WALLS Component Weightage 10 | ||||
| A- GENERAL | |||||
| a) Erosion or scour at abutment? | Yes | Not So Bad | Not Much Qty | 1 | |
| b) Damage to foundation? | Yes | Not So Bad | Not Much Qty | 1 | |
| c) Movement of abutment? | Yes | Not So Bad | Not Much Qty | 1 | |
| d) Debris against abutment? | NO Problem | -- | -- | 0 | |
| e) Vegetation growing on-or in abutment? | NO Problem | -- | -- | 0 | |
| f) Scour near to retaining walls? | Yes | Not So Bad | Not Much Qty | 1 | |
| g) Movement of retaining walls? | NO Problem | -- | -- | 0 | |
| h) Water leaking down through the expansion joint? | NO Problem | -- | -- | 0 | |
| B- DRAINAGE SYSTEM | |||||
| a) Not enough weepholes? | Yes | Not So Bad | Not Much Qty | 1 | |
| b) Weepholes not working? | NO Problem | -- | -- | 0 | |
| c) Water leaking through the abutment? | NO Problem | -- | -- | 0 | |
| C- CONCRETE WALLS | |||||
| a) Cracking? | Yes | Not So Bad | Not Much Qty | 1 | |
| b) Spalling? | Yes | Not So Bad | Some Qty | 2 | |
| c) Corrosion of reinforcement? | Yes | Not So Bad | Not Much Qty | 1 | |
| d) Poor concrete? | NO Problem | -- | -- | 0 | |
| D- MASONRY WALLS | |||||
| a) Cracking? | Yes | Not So Bad | Not Much Qty | 1 | |
| b) Bulging? | NO Problem | -- | -- | 0 | |
| c) Poor pointing? | Yes | Not So Bad | Not Much Qty | 1 | |
| d) Deterioration of bricks or stones? | NO Problem | -- | -- | 0 | |
| E- EMBANKMENTS AND FILL IN FRONT OF ABUTMENT | |||||
| a) Scour at base of slopes? | Yes | Not So Bad | Some Qty | 2 | |
| b) Slippage of fill? | NO Problem | -- | -- | 0 | |
| c) Erosion of fill? | Yes | Not So Bad | Not Much Qty | 1 | |
| d) Cracking of road or embankment edge? | NO Problem | -- | -- | 0 | |
| e) Piping failure of fill? | NO Problem | -- | -- | 0 | |
| 8 | Left Side ABUTMENT, WING WALLS & RETAINING WALLS Component Weightage 10 | ||||
| A- GENERAL | |||||
| a) Erosion or scour at abutment? | Yes | Not So Bad | Not Much Qty | 1 | |
| b) Damage to foundation? | NO Problem | -- | -- | 0 | |
| c) Movement of abutment? | Yes | Not So Bad | Not Much Qty | 1 | |
| d) Debris against abutment? | Yes | Not So Bad | Not Much Qty | 1 | |
| e) Vegetation growing on-or in abutment? | Yes | Not So Bad | Not Much Qty | 1 | |
| f) Scour near to retaining walls? | NO Problem | -- | -- | 0 | |
| g) Movement of retaining walls? | NO Problem | -- | -- | 0 | |
| h) Water leaking down through the expansion joint? | Yes | Not So Bad | Some Qty | 2 | |
| B- DRAINAGE SYSTEM | |||||
| a) Not enough weepholes? | NO Problem | -- | -- | 0 | |
| b) Weepholes not working? | NO Problem | -- | -- | 0 | |
| c) Water leaking through the abutment? | Yes | Not So Bad | Not Much Qty | 1 | |
| C- CONCRETE WALLS | |||||
| a) Cracking? | NO Problem | -- | -- | 0 | |
| b) Spalling? | Yes | Not So Bad | Not Much Qty | 1 | |
| c) Corrosion of reinforcement? | NO Problem | -- | -- | 0 | |
| d) Poor concrete? | NO Problem | -- | -- | 0 | |
| D- MASONRY WALLS | |||||
| a) Cracking? | Yes | Not So Bad | Not Much Qty | 1 | |
| b) Bulging? | Yes | Not So Bad | Not Much Qty | 1 | |
| c) Poor pointing? | NO Problem | -- | -- | 0 | |
| d) Deterioration of bricks or stones? | NO Problem | -- | -- | 0 | |
| E- EMBANKMENTS AND FILL IN FRONT OF ABUTMENT | |||||
| a) Scour at base of slopes? | NO Problem | -- | -- | 0 | |
| b) Slippage of fill? | NO Problem | -- | -- | 0 | |
| c) Erosion of fill? | NO Problem | -- | -- | 0 | |
| d) Cracking of road or embankment edge? | NO Problem | -- | -- | 0 | |
| e) Piping failure of fill? | NO Problem | -- | -- | 0 | |
| 9 | Embankments Component Weightage 10 | ||||
| A- STONE PITCHING SLOPE PROTECTION | |||||
| a) Cracking? | Yes | Not So Bad | Not Much Qty | 1 | |
| b) Poor pointing? | Yes | Not So Bad | Not Much Qty | 1 | |
| c) Scour or erosion at edge? | Yes | Not So Bad | Not Much Qty | 1 | |
| d) Pieces broken off? | NO Problem | -- | -- | 0 | |
| e) Piping failure of fill? | Yes | Not So Bad | Not Much Qty | 1 | |
| B- SLOPE PROTECTION WITH CRATES | |||||
| a) Not much movement of crates? | NO Problem | -- | -- | 0 | |
| b) Damage to crates or ties? | Yes | Not So Bad | Not Much Qty | 1 | |
| C- PITCHING SLOPE PROTECTION WITH CONCRETE BLOCKS | |||||
| a) Slope getting washed out? | Yes | Not So Bad | Not Much Qty | 1 | |
| b) Settlement? | Yes | Not So Bad | Not Much Qty | 1 | |
| 10 | RIVER BED Component Weightage 10 | ||||
| A- BED PROTECTION AND APRONS | |||||
| a) Large holes in the river bed? | Yes | Not So Bad | Not Much Qty | 1 | |
| b) Loss of material | NO Problem | -- | -- | 0 | |
| c) Crates broken away from pier or abutment? | Yes | Not So Bad | Not Much Qty | 1 | |
| d) Damage to wires or ties? | Yes | Not So Bad | Not Much Qty | 1 | |
| B- STONE PITCHING OR CONCRETE BED PROTECTION AND APRONS | |||||
| a) Scour at edge? | Yes | Not So Bad | Not Much Qty | 1 | |
| b) Cracking? | NO Problem | -- | -- | 0 | |
| c) Spalling or stones missing? | Yes | Not So Bad | Not Much Qty | 1 | |
| d) Erosion of surface? | Yes | Not So Bad | Not Much Qty | 1 | |
| e) Corrosion of reinforcement? | Yes | Not So Bad | Not Much Qty | 1 | |
End of Report