on Chainage 15.000 of Freedom fighter Shri Vishveshwar Dutt Saklani motor road (Raipur Kaddukhal state highway)
In District Tehri Under TD Thathyd Division
Critical Report on Bridge Condition
Form Filled By Samiksha Sharma [61003900410385]
Inspection Team
Detail Report
| # | Parameter | Problem ? | How Bad? | How Much? | |
|---|---|---|---|---|---|
| 1 | ROAD APPROCHES AND DECK Component Weightage 10 | ||||
| A- ROAD SURFACE NEAR BRIDGE | |||||
| a) Bumpy road surface near bridge? | Yes | Not So Bad | Some Qty | 2 | |
| B- DRAINAGE | |||||
| a) Badly built road drainage near bridge? | Yes | Not So Bad | Some Qty | 2 | |
| b) Blocked or damaged road drains? | NO Problem | -- | -- | 0 | |
| c) Water on the deck? | NO Problem | -- | -- | 0 | |
| d) Blocked or damaged deck drains? | NO Problem | -- | -- | 0 | |
| C- WEARING COAT | |||||
| CONCRETE WEARING COURSE | |||||
| a) Cracking? | Yes | Not So Bad | Some Qty | 2 | |
| b) Spalling? | Yes | Not So Bad | Some Qty | 2 | |
| c) Reinforcement exposed? | Yes | Very Bad | Not Much Qty | 7 | |
| d) Poor concrete? | Yes | Very Bad | Not Much Qty | 7 | |
| e) Wear of surface due to small stones? | NO Problem | -- | -- | 0 | |
| D- KERBS & FOOTPATHS | |||||
| a) Loose railing fixtures? | Yes | Bad | Not Much Qty | 4 | |
| a) Damaged or loose kerbs? | Yes | Bad | Not Much Qty | 4 | |
| 2 | PARAPETS, RAILINGS AND CRASH BARRIERS Component Weightage 10 | ||||
| a) Impact damaged? | Yes | Bad | Not Much Qty | 4 | |
| b) Loose or damaged fixings? | Yes | Bad | Not Much Qty | 4 | |
| c) Loose base of posts? | Yes | Bad | Not Much Qty | 4 | |
| d) Damaged coatirig or paint on steel surface? | NO Problem | -- | -- | 0 | |
| e) Corrosion on steel surface? | NO Problem | -- | -- | 0 | |
| f) Cracking on Masonary Parapets? | Yes | Bad | Some Qty | 5 | |
| g) Movement or bending of parapet? | Yes | Bad | Some Qty | 5 | |
| h) Poor pointing/ Plaster on parapet? | Yes | Bad | Not Much Qty | 4 | |
| i) Deterioration of bricks or stones? | Yes | Very Bad | Much Qty | 9 | |
| 3 | EXPANSION JOINT AT ABUTMENTS & PIERS Component Weightage 10 | ||||
| a) Damage to concrete of deck end or dirt wall near joint? | Yes | Bad | Not Much Qty | 4 | |
| b) Debris or vegetation in joint? | NO Problem | -- | -- | 0 | |
| c) Loose or damaged fixtures? | Yes | Very Bad | Much Qty | 9 | |
| d) Damage or corrosion to metal parts? | Yes | Not So Bad | Much Qty | 3 | |
| e) Damage to rubber waterseals? | NO Problem | -- | -- | 0 | |
| 4 | RIVER Component Weightage 10 | ||||
| A- BLOCKAGES IN WATERWAY | |||||
| a) Debris against piers or abutments? | NO Problem | -- | -- | 0 | |
| b) Remains of old bridge under or upstream of the bridge? | NO Problem | -- | -- | 0 | |
| c) Fencing or buildings under bridge? | NO Problem | -- | -- | 0 | |
| d) Trees or bushes.growing under bridge? | NO Problem | -- | -- | 0 | |
| B- CHANGE IN RIVER COURSE | |||||
| a) River changing path upstream of bridge? | NO Problem | -- | -- | 0 | |
| b) New islands forming upstream of bridge? | NO Problem | -- | -- | 0 | |
| C- RIVER TRAINING WORKS | |||||
| a) River attack beyond the upstream end of river training works? | NO Problem | -- | -- | 0 | |
| b) Damage to walls? | Yes | Very Bad | Much Qty | 9 | |
| c) Loss of pitching? | NO Problem | -- | -- | 0 | |
| d) Damage to crates, timber, fencing, etc.? | Yes | Very Bad | Much Qty | 9 | |
| e) Damage to trees? | NO Problem | -- | -- | 0 | |
| 5 | SUPERSTRUCTURE Component Weightage 60 | ||||
| SUPERSTRUCTURE -1 | |||||
| TYPE - CONCRETE | |||||
| General | |||||
| a) Impact damage to girders, trusses or bracings? | Yes | Not So Bad | Not Much Qty | 1 | |
| b) Debris or vegetation on beams, girders, trusses bracings or joints? | NO Problem | -- | -- | 0 | |
| c) Water coming through the deck? | NO Problem | -- | -- | 0 | |
| d) Water from the deck drainage flowing on to girders, trusses, beams or bracings? | NO Problem | -- | -- | 0 | |
| e) Not enough vertical & horizontal clearances? | NO Problem | -- | -- | 0 | |
| CONCRETE BEAMS | |||||
| a) Cracking? | NO Problem | -- | -- | 0 | |
| b) Spalling? | NO Problem | -- | -- | 0 | |
| c) Corrosion of reinforcement? | NO Problem | -- | -- | 0 | |
| d) Poor concrete? | NO Problem | -- | -- | 0 | |
| CONCRETE UNDERSIDE OF DECK | |||||
| a) Cracking? | NO Problem | -- | -- | 0 | |
| b) Spalling? | NO Problem | -- | -- | 0 | |
| c) Reinforcement corrosion? | NO Problem | -- | -- | 0 | |
| d) Poor concrete? | NO Problem | -- | -- | 0 | |
| e) Less cover to reinforcement? | NO Problem | -- | -- | 0 | |
| SUPERSTRUCTURE -2 | |||||
| TYPE - CONCRETE | |||||
| General | |||||
| a) Impact damage to girders, trusses or bracings? | NO Problem | -- | -- | 0 | |
| b) Debris or vegetation on beams, girders, trusses bracings or joints? | NO Problem | -- | -- | 0 | |
| c) Water coming through the deck? | NO Problem | -- | -- | 0 | |
| d) Water from the deck drainage flowing on to girders, trusses, beams or bracings? | NO Problem | -- | -- | 0 | |
| e) Not enough vertical & horizontal clearances? | NO Problem | -- | -- | 0 | |
| CONCRETE BEAMS | |||||
| a) Cracking? | NO Problem | -- | -- | 0 | |
| b) Spalling? | NO Problem | -- | -- | 0 | |
| c) Corrosion of reinforcement? | NO Problem | -- | -- | 0 | |
| d) Poor concrete? | NO Problem | -- | -- | 0 | |
| CONCRETE UNDERSIDE OF DECK | |||||
| a) Cracking? | NO Problem | -- | -- | 0 | |
| b) Spalling? | NO Problem | -- | -- | 0 | |
| c) Reinforcement corrosion? | Yes | Very Bad | Much Qty | 9 | |
| d) Poor concrete? | Yes | Very Bad | Much Qty | 9 | |
| e) Less cover to reinforcement? | Yes | Very Bad | Much Qty | 9 | |
| 6 | BEARINGS Component Weightage 10 | ||||
| NOT APPLICABLE | |||||
| 7 | Right Side ABUTMENT, WING WALLS & RETAINING WALLS Component Weightage 10 | ||||
| A- GENERAL | |||||
| a) Erosion or scour at abutment? | Yes | Very Bad | Much Qty | 9 | |
| b) Damage to foundation? | Yes | Very Bad | Much Qty | 9 | |
| c) Movement of abutment? | Yes | Very Bad | Much Qty | 9 | |
| d) Debris against abutment? | Yes | Not So Bad | Some Qty | 2 | |
| e) Vegetation growing on-or in abutment? | NO Problem | -- | -- | 0 | |
| f) Scour near to retaining walls? | NO Problem | -- | -- | 0 | |
| g) Movement of retaining walls? | NO Problem | -- | -- | 0 | |
| h) Water leaking down through the expansion joint? | NO Problem | -- | -- | 0 | |
| B- DRAINAGE SYSTEM | |||||
| a) Not enough weepholes? | NO Problem | -- | -- | 0 | |
| b) Weepholes not working? | NO Problem | -- | -- | 0 | |
| c) Water leaking through the abutment? | NO Problem | -- | -- | 0 | |
| C- CONCRETE WALLS | |||||
| a) Cracking? | Yes | Very Bad | Much Qty | 9 | |
| b) Spalling? | NO Problem | -- | -- | 0 | |
| c) Corrosion of reinforcement? | Yes | Bad | Some Qty | 5 | |
| d) Poor concrete? | Yes | Bad | Much Qty | 6 | |
| D- MASONRY WALLS | |||||
| a) Cracking? | Yes | Bad | Much Qty | 6 | |
| b) Bulging? | Yes | Very Bad | Much Qty | 9 | |
| c) Poor pointing? | Yes | Very Bad | Much Qty | 9 | |
| d) Deterioration of bricks or stones? | Yes | Very Bad | Much Qty | 9 | |
| E- EMBANKMENTS AND FILL IN FRONT OF ABUTMENT | |||||
| a) Scour at base of slopes? | Yes | Very Bad | Much Qty | 9 | |
| b) Slippage of fill? | Yes | Very Bad | Much Qty | 9 | |
| c) Erosion of fill? | Yes | Very Bad | Much Qty | 9 | |
| d) Cracking of road or embankment edge? | Yes | Not So Bad | Some Qty | 2 | |
| e) Piping failure of fill? | Yes | Not So Bad | Not Much Qty | 1 | |
| 8 | Left Side ABUTMENT, WING WALLS & RETAINING WALLS Component Weightage 10 | ||||
| A- GENERAL | |||||
| a) Erosion or scour at abutment? | Yes | Very Bad | Much Qty | 9 | |
| b) Damage to foundation? | Yes | Very Bad | Much Qty | 9 | |
| c) Movement of abutment? | Yes | Very Bad | Much Qty | 9 | |
| d) Debris against abutment? | Yes | Not So Bad | Not Much Qty | 1 | |
| e) Vegetation growing on-or in abutment? | NO Problem | -- | -- | 0 | |
| f) Scour near to retaining walls? | Yes | Very Bad | Much Qty | 9 | |
| g) Movement of retaining walls? | Yes | Very Bad | Much Qty | 9 | |
| h) Water leaking down through the expansion joint? | Yes | Bad | Some Qty | 5 | |
| B- DRAINAGE SYSTEM | |||||
| a) Not enough weepholes? | NO Problem | -- | -- | 0 | |
| b) Weepholes not working? | NO Problem | -- | -- | 0 | |
| c) Water leaking through the abutment? | NO Problem | -- | -- | 0 | |
| C- CONCRETE WALLS | |||||
| a) Cracking? | Yes | Bad | Some Qty | 5 | |
| b) Spalling? | Yes | Not So Bad | Much Qty | 3 | |
| c) Corrosion of reinforcement? | Yes | Very Bad | Much Qty | 9 | |
| d) Poor concrete? | Yes | Very Bad | Much Qty | 9 | |
| D- MASONRY WALLS | |||||
| a) Cracking? | Yes | Very Bad | Much Qty | 9 | |
| b) Bulging? | Yes | Very Bad | Much Qty | 9 | |
| c) Poor pointing? | Yes | Very Bad | Much Qty | 9 | |
| d) Deterioration of bricks or stones? | Yes | Very Bad | Much Qty | 9 | |
| E- EMBANKMENTS AND FILL IN FRONT OF ABUTMENT | |||||
| a) Scour at base of slopes? | Yes | Very Bad | Much Qty | 9 | |
| b) Slippage of fill? | Yes | Not So Bad | Much Qty | 3 | |
| c) Erosion of fill? | Yes | Bad | Not Much Qty | 4 | |
| d) Cracking of road or embankment edge? | Yes | Not So Bad | Not Much Qty | 1 | |
| e) Piping failure of fill? | Yes | Not So Bad | Not Much Qty | 1 | |
| 9 | Embankments Component Weightage 10 | ||||
| A- STONE PITCHING SLOPE PROTECTION | |||||
| a) Cracking? | Yes | Not So Bad | Some Qty | 2 | |
| b) Poor pointing? | Yes | Not So Bad | Some Qty | 2 | |
| c) Scour or erosion at edge? | Yes | Not So Bad | Not Much Qty | 1 | |
| d) Pieces broken off? | Yes | Not So Bad | Not Much Qty | 1 | |
| e) Piping failure of fill? | Yes | Not So Bad | Not Much Qty | 1 | |
| B- SLOPE PROTECTION WITH CRATES | |||||
| a) Not much movement of crates? | Yes | Bad | Some Qty | 5 | |
| b) Damage to crates or ties? | Yes | Bad | Some Qty | 5 | |
| C- PITCHING SLOPE PROTECTION WITH CONCRETE BLOCKS | |||||
| a) Slope getting washed out? | Yes | Bad | Some Qty | 5 | |
| b) Settlement? | Yes | Very Bad | Much Qty | 9 | |
| 10 | RIVER BED Component Weightage 10 | ||||
| A- BED PROTECTION AND APRONS | |||||
| a) Large holes in the river bed? | Yes | Bad | Some Qty | 5 | |
| b) Loss of material | Yes | Bad | Some Qty | 5 | |
| c) Crates broken away from pier or abutment? | Yes | Bad | Some Qty | 5 | |
| d) Damage to wires or ties? | Yes | Not So Bad | Some Qty | 2 | |
| B- STONE PITCHING OR CONCRETE BED PROTECTION AND APRONS | |||||
| a) Scour at edge? | Yes | Not So Bad | Some Qty | 2 | |
| b) Cracking? | Yes | Bad | Not Much Qty | 4 | |
| c) Spalling or stones missing? | Yes | Not So Bad | Much Qty | 3 | |
| d) Erosion of surface? | Yes | Bad | Not Much Qty | 4 | |
| e) Corrosion of reinforcement? | Yes | Not So Bad | Not Much Qty | 1 | |
End of Report