ID :1696 Ghatgar Bridge

on Chainage 0.018 of Bikhyasain Deghat Bungidhar Mehalchori Bachuwaban Chokhutiya state highway

In District Almora Under PD Ranikhet Division


Critical Report on Bridge Condition

Form Filled By Shubham Singh [42270213M01496]

Inspection Team

Detail Report

# Parameter Problem ? How Bad? How Much?
1 ROAD APPROCHES AND DECK Component Weightage 10
A- ROAD SURFACE NEAR BRIDGE
a) Bumpy road surface near bridge? Yes Very Bad Much Qty 9
B- DRAINAGE
a) Badly built road drainage near bridge? Yes Very Bad Much Qty 9
b) Blocked or damaged road drains? Yes Very Bad Much Qty 9
c) Water on the deck? Yes Very Bad Much Qty 9
d) Blocked or damaged deck drains? Yes Very Bad Much Qty 9
C- WEARING COAT
CONCRETE WEARING COURSE
a) Cracking? Yes Very Bad Much Qty 9
b) Spalling? NO Problem -- -- 0
c) Reinforcement exposed? Yes Very Bad Much Qty 9
d) Poor concrete? Yes Very Bad Much Qty 9
e) Wear of surface due to small stones? Yes Very Bad Much Qty 9
D- KERBS & FOOTPATHS
a) Loose railing fixtures? Yes Very Bad Much Qty 9
a) Damaged or loose kerbs? Yes Very Bad Much Qty 9
2 PARAPETS, RAILINGS AND CRASH BARRIERS Component Weightage 10
a) Impact damaged? Yes Very Bad Much Qty 9
b) Loose or damaged fixings? Yes Very Bad Much Qty 9
c) Loose base of posts? Yes Very Bad Much Qty 9
d) Damaged coatirig or paint on steel surface? Yes Very Bad Much Qty 9
e) Corrosion on steel surface? Yes Very Bad Much Qty 9
f) Cracking on Masonary Parapets? Yes Very Bad Much Qty 9
g) Movement or bending of parapet? Yes Very Bad Much Qty 9
h) Poor pointing/ Plaster on parapet? Yes Very Bad Much Qty 9
i) Deterioration of bricks or stones? Yes Very Bad Much Qty 9
3 EXPANSION JOINT AT ABUTMENTS & PIERS Component Weightage 10
a) Damage to concrete of deck end or dirt wall near joint? Yes Very Bad Much Qty 9
b) Debris or vegetation in joint? Yes Very Bad Much Qty 9
c) Loose or damaged fixtures? Yes Very Bad Much Qty 9
d) Damage or corrosion to metal parts? Yes Very Bad Much Qty 9
e) Damage to rubber waterseals? Yes Very Bad Much Qty 9
4 RIVER Component Weightage 10
A- BLOCKAGES IN WATERWAY
a) Debris against piers or abutments? Yes Very Bad Much Qty 9
b) Remains of old bridge under or upstream of the bridge? Yes Very Bad Much Qty 9
c) Fencing or buildings under bridge? Yes Very Bad Much Qty 9
d) Trees or bushes.growing under bridge? Yes Very Bad Much Qty 9
B- CHANGE IN RIVER COURSE
a) River changing path upstream of bridge? Yes Very Bad Much Qty 9
b) New islands forming upstream of bridge? Yes Very Bad Much Qty 9
C- RIVER TRAINING WORKS
a) River attack beyond the upstream end of river training works? Yes Very Bad Much Qty 9
b) Damage to walls? Yes Very Bad Much Qty 9
c) Loss of pitching? Yes Very Bad Much Qty 9
d) Damage to crates, timber, fencing, etc.? Yes Very Bad Much Qty 9
e) Damage to trees? Yes Very Bad Much Qty 9
5 SUPERSTRUCTURE Component Weightage 60
STEEL TRUSSES
General
a) Impact damage to girders, trusses or bracings? Yes Very Bad Much Qty 9
b) Debris or vegetation on beams, girders, trusses bracings or joints? Yes Very Bad Much Qty 9
c) Water coming through the deck? Yes Very Bad Much Qty 9
d) Water from the deck drainage flowing on to girders, trusses, beams or bracings? Yes Very Bad Much Qty 9
e) Not enough vertical & horizontal clearances? Yes Very Bad Much Qty 9
STEEL TRUSSES
a) Deterioration of paint or galvanising? Yes Very Bad Much Qty 9
b) Corrosion? Yes Bad Much Qty 6
c) Bends in members? Yes Very Bad Much Qty 9
d) Bent or damaged joints? Yes Very Bad Much Qty 9
e) Bent or damaged bracing? NO Problem -- -- 0
f) Loose bolts or rivets? Yes Very Bad Much Qty 9
g) Cracking of steel members? Yes Very Bad Much Qty 9
STEEL UNDERSIDE OF DECK
a) Deterioration of paint or galvanising? Yes Very Bad Much Qty 9
b) Corrosion? Yes Very Bad Much Qty 9
c) Bends in stringers or plates? NO Problem -- -- 0
d) Loose bolts or rivets? Yes Very Bad Much Qty 9
e) Cracking? Yes Very Bad Much Qty 9
6 BEARINGS Component Weightage 10
RUBBER BEARINGS
a) Debris or vegetation around bearings? Yes Bad Much Qty 6
b) Bad drainage? NO Problem -- -- 0
c) Not enough room for the bridge span to move? NO Problem -- -- 0
d) Bearing not seated properly? NO Problem -- -- 0
e) Bridge span not seated properly on bearing? NO Problem -- -- 0
f) Damaged bedding mortar? NO Problem -- -- 0
g) Damaged or loose earthquake restraints? NO Problem -- -- 0
RUBBER BEARINGS
a) Splitting, tearing or cracking of rubber? NO Problem -- -- 0
b) Damaged bedding mortar? NO Problem -- -- 0
7 Right Side ABUTMENT, WING WALLS & RETAINING WALLS Component Weightage 10
A- GENERAL
a) Erosion or scour at abutment? Yes Very Bad Much Qty 9
b) Damage to foundation? Yes Very Bad Much Qty 9
c) Movement of abutment? NO Problem -- -- 0
d) Debris against abutment? Yes Very Bad Much Qty 9
e) Vegetation growing on-or in abutment? NO Problem -- -- 0
f) Scour near to retaining walls? NO Problem -- -- 0
g) Movement of retaining walls? Yes Very Bad Much Qty 9
h) Water leaking down through the expansion joint? Yes Very Bad Much Qty 9
B- DRAINAGE SYSTEM
a) Not enough weepholes? Yes Very Bad Much Qty 9
b) Weepholes not working? NO Problem -- -- 0
c) Water leaking through the abutment? Yes Very Bad Much Qty 9
C- CONCRETE WALLS
a) Cracking? NO Problem -- -- 0
b) Spalling? NO Problem -- -- 0
c) Corrosion of reinforcement? NO Problem -- -- 0
d) Poor concrete? Yes Very Bad Much Qty 9
D- MASONRY WALLS
a) Cracking? NO Problem -- -- 0
b) Bulging? Yes Very Bad Much Qty 9
c) Poor pointing? NO Problem -- -- 0
d) Deterioration of bricks or stones? NO Problem -- -- 0
E- EMBANKMENTS AND FILL IN FRONT OF ABUTMENT
a) Scour at base of slopes? Yes Very Bad Much Qty 9
b) Slippage of fill? NO Problem -- -- 0
c) Erosion of fill? NO Problem -- -- 0
d) Cracking of road or embankment edge? Yes Very Bad Much Qty 9
e) Piping failure of fill? NO Problem -- -- 0
8 Left Side ABUTMENT, WING WALLS & RETAINING WALLS Component Weightage 10
A- GENERAL
a) Erosion or scour at abutment? Yes Very Bad Much Qty 9
b) Damage to foundation? Yes Very Bad Much Qty 9
c) Movement of abutment? Yes Very Bad Much Qty 9
d) Debris against abutment? NO Problem -- -- 0
e) Vegetation growing on-or in abutment? NO Problem -- -- 0
f) Scour near to retaining walls? NO Problem -- -- 0
g) Movement of retaining walls? NO Problem -- -- 0
h) Water leaking down through the expansion joint? NO Problem -- -- 0
B- DRAINAGE SYSTEM
a) Not enough weepholes? NO Problem -- -- 0
b) Weepholes not working? NO Problem -- -- 0
c) Water leaking through the abutment? NO Problem -- -- 0
C- CONCRETE WALLS
a) Cracking? NO Problem -- -- 0
b) Spalling? NO Problem -- -- 0
c) Corrosion of reinforcement? NO Problem -- -- 0
d) Poor concrete? NO Problem -- -- 0
D- MASONRY WALLS
a) Cracking? NO Problem -- -- 0
b) Bulging? NO Problem -- -- 0
c) Poor pointing? NO Problem -- -- 0
d) Deterioration of bricks or stones? NO Problem -- -- 0
E- EMBANKMENTS AND FILL IN FRONT OF ABUTMENT
a) Scour at base of slopes? NO Problem -- -- 0
b) Slippage of fill? NO Problem -- -- 0
c) Erosion of fill? NO Problem -- -- 0
d) Cracking of road or embankment edge? NO Problem -- -- 0
e) Piping failure of fill? NO Problem -- -- 0
9 Embankments Component Weightage 10
A- STONE PITCHING SLOPE PROTECTION
a) Cracking? NO Problem -- -- 0
b) Poor pointing? NO Problem -- -- 0
c) Scour or erosion at edge? NO Problem -- -- 0
d) Pieces broken off? NO Problem -- -- 0
e) Piping failure of fill? NO Problem -- -- 0
B- SLOPE PROTECTION WITH CRATES
a) Not much movement of crates? NO Problem -- -- 0
b) Damage to crates or ties? NO Problem -- -- 0
C- PITCHING SLOPE PROTECTION WITH CONCRETE BLOCKS
a) Slope getting washed out? NO Problem -- -- 0
b) Settlement? NO Problem -- -- 0
10 RIVER BED Component Weightage 10
A- BED PROTECTION AND APRONS
a) Large holes in the river bed? NO Problem -- -- 0
b) Loss of material NO Problem -- -- 0
c) Crates broken away from pier or abutment? NO Problem -- -- 0
d) Damage to wires or ties? NO Problem -- -- 0
B- STONE PITCHING OR CONCRETE BED PROTECTION AND APRONS
a) Scour at edge? NO Problem -- -- 0
b) Cracking? NO Problem -- -- 0
c) Spalling or stones missing? NO Problem -- -- 0
d) Erosion of surface? NO Problem -- -- 0
e) Corrosion of reinforcement? NO Problem -- -- 0

End of Report