ID :2290
PEDESTRAIN BRIDGE BETWEEN CHOURAGOOTH AND JAMAD OVER KUTHAD GAAD
on Chainage 1.000 of road unknown
In District Champawat Under CD Lohaghat Division
Critical Report on Bridge Condition
Form Filled By Pankaj Singh Bhandari [42270210M00004]
Inspection Team
Detail Report
| # | Parameter | Problem ? | How Bad? | How Much? | |
|---|---|---|---|---|---|
| 1 | ROAD APPROCHES AND DECK Component Weightage 10 | ||||
| A- ROAD SURFACE NEAR BRIDGE | |||||
| a) Bumpy road surface near bridge? | Yes | Not So Bad | Not Much Qty | 1 | |
| B- DRAINAGE | |||||
| a) Badly built road drainage near bridge? | Yes | Not So Bad | Some Qty | 2 | |
| b) Blocked or damaged road drains? | Yes | Bad | Not Much Qty | 4 | |
| c) Water on the deck? | Yes | Not So Bad | Much Qty | 3 | |
| d) Blocked or damaged deck drains? | NO Problem | -- | -- | 0 | |
| C- WEARING COAT | |||||
| CONCRETE WEARING COURSE | |||||
| a) Cracking? | Yes | Not So Bad | Some Qty | 2 | |
| b) Spalling? | NO Problem | -- | -- | 0 | |
| c) Reinforcement exposed? | Yes | Not So Bad | Not Much Qty | 1 | |
| d) Poor concrete? | Yes | Not So Bad | Not Much Qty | 1 | |
| e) Wear of surface due to small stones? | NO Problem | -- | -- | 0 | |
| D- KERBS & FOOTPATHS | |||||
| a) Loose railing fixtures? | NO Problem | -- | -- | 0 | |
| a) Damaged or loose kerbs? | NO Problem | -- | -- | 0 | |
| 2 | PARAPETS, RAILINGS AND CRASH BARRIERS Component Weightage 10 | ||||
| a) Impact damaged? | NO Problem | -- | -- | 0 | |
| b) Loose or damaged fixings? | Yes | Not So Bad | Some Qty | 2 | |
| c) Loose base of posts? | Yes | Not So Bad | Not Much Qty | 1 | |
| d) Damaged coatirig or paint on steel surface? | Yes | Not So Bad | Much Qty | 3 | |
| e) Corrosion on steel surface? | Yes | Not So Bad | Some Qty | 2 | |
| f) Cracking on Masonary Parapets? | NO Problem | -- | -- | 0 | |
| g) Movement or bending of parapet? | NO Problem | -- | -- | 0 | |
| h) Poor pointing/ Plaster on parapet? | NO Problem | -- | -- | 0 | |
| i) Deterioration of bricks or stones? | NO Problem | -- | -- | 0 | |
| 3 | EXPANSION JOINT AT ABUTMENTS & PIERS Component Weightage 10 | ||||
| a) Damage to concrete of deck end or dirt wall near joint? | Yes | Not So Bad | Some Qty | 2 | |
| b) Debris or vegetation in joint? | Yes | Bad | Not Much Qty | 4 | |
| c) Loose or damaged fixtures? | Yes | Not So Bad | Some Qty | 2 | |
| d) Damage or corrosion to metal parts? | Yes | Not So Bad | Some Qty | 2 | |
| e) Damage to rubber waterseals? | NO Problem | -- | -- | 0 | |
| 4 | RIVER Component Weightage 10 | ||||
| A- BLOCKAGES IN WATERWAY | |||||
| a) Debris against piers or abutments? | Yes | Not So Bad | Some Qty | 2 | |
| b) Remains of old bridge under or upstream of the bridge? | NO Problem | -- | -- | 0 | |
| c) Fencing or buildings under bridge? | NO Problem | -- | -- | 0 | |
| d) Trees or bushes.growing under bridge? | Yes | Bad | Not Much Qty | 4 | |
| B- CHANGE IN RIVER COURSE | |||||
| a) River changing path upstream of bridge? | Yes | Not So Bad | Some Qty | 2 | |
| b) New islands forming upstream of bridge? | NO Problem | -- | -- | 0 | |
| C- RIVER TRAINING WORKS | |||||
| a) River attack beyond the upstream end of river training works? | Yes | Not So Bad | Some Qty | 2 | |
| b) Damage to walls? | NO Problem | -- | -- | 0 | |
| c) Loss of pitching? | Yes | Not So Bad | Some Qty | 2 | |
| d) Damage to crates, timber, fencing, etc.? | Yes | Not So Bad | Some Qty | 2 | |
| e) Damage to trees? | NO Problem | -- | -- | 0 | |
| 5 | SUPERSTRUCTURE Component Weightage 60 | ||||
| STEEL TRUSSES | |||||
| General | |||||
| a) Impact damage to girders, trusses or bracings? | Yes | Not So Bad | Not Much Qty | 1 | |
| b) Debris or vegetation on beams, girders, trusses bracings or joints? | Yes | Bad | Not Much Qty | 4 | |
| c) Water coming through the deck? | Yes | Not So Bad | Some Qty | 2 | |
| d) Water from the deck drainage flowing on to girders, trusses, beams or bracings? | NO Problem | -- | -- | 0 | |
| e) Not enough vertical & horizontal clearances? | Yes | Not So Bad | Much Qty | 3 | |
| STEEL TRUSSES | |||||
| a) Deterioration of paint or galvanising? | Yes | Not So Bad | Some Qty | 2 | |
| b) Corrosion? | Yes | Not So Bad | Some Qty | 2 | |
| c) Bends in members? | NO Problem | -- | -- | 0 | |
| d) Bent or damaged joints? | NO Problem | -- | -- | 0 | |
| e) Bent or damaged bracing? | NO Problem | -- | -- | 0 | |
| f) Loose bolts or rivets? | Yes | Not So Bad | Not Much Qty | 1 | |
| g) Cracking of steel members? | NO Problem | -- | -- | 0 | |
| STEEL UNDERSIDE OF DECK | |||||
| a) Deterioration of paint or galvanising? | Yes | Not So Bad | Some Qty | 2 | |
| b) Corrosion? | Yes | Not So Bad | Some Qty | 2 | |
| c) Bends in stringers or plates? | NO Problem | -- | -- | 0 | |
| d) Loose bolts or rivets? | Yes | Not So Bad | Some Qty | 2 | |
| e) Cracking? | Yes | Not So Bad | Some Qty | 2 | |
| 6 | BEARINGS Component Weightage 10 | ||||
| RUBBER BEARINGS | |||||
| a) Debris or vegetation around bearings? | Yes | Not So Bad | Some Qty | 2 | |
| b) Bad drainage? | Yes | Bad | Not Much Qty | 4 | |
| c) Not enough room for the bridge span to move? | Yes | Not So Bad | Not Much Qty | 1 | |
| d) Bearing not seated properly? | NO Problem | -- | -- | 0 | |
| e) Bridge span not seated properly on bearing? | NO Problem | -- | -- | 0 | |
| f) Damaged bedding mortar? | NO Problem | -- | -- | 0 | |
| g) Damaged or loose earthquake restraints? | NO Problem | -- | -- | 0 | |
| RUBBER BEARINGS | |||||
| a) Splitting, tearing or cracking of rubber? | Yes | Not So Bad | Not Much Qty | 1 | |
| b) Damaged bedding mortar? | Yes | Not So Bad | Much Qty | 3 | |
| 7 | Right Side ABUTMENT, WING WALLS & RETAINING WALLS Component Weightage 10 | ||||
| A- GENERAL | |||||
| a) Erosion or scour at abutment? | Yes | Not So Bad | Much Qty | 3 | |
| b) Damage to foundation? | Yes | Not So Bad | Not Much Qty | 1 | |
| c) Movement of abutment? | NO Problem | -- | -- | 0 | |
| d) Debris against abutment? | Yes | Not So Bad | Some Qty | 2 | |
| e) Vegetation growing on-or in abutment? | Yes | Not So Bad | Some Qty | 2 | |
| f) Scour near to retaining walls? | NO Problem | -- | -- | 0 | |
| g) Movement of retaining walls? | NO Problem | -- | -- | 0 | |
| h) Water leaking down through the expansion joint? | NO Problem | -- | -- | 0 | |
| B- DRAINAGE SYSTEM | |||||
| a) Not enough weepholes? | NO Problem | -- | -- | 0 | |
| b) Weepholes not working? | NO Problem | -- | -- | 0 | |
| c) Water leaking through the abutment? | NO Problem | -- | -- | 0 | |
| C- CONCRETE WALLS | |||||
| a) Cracking? | NO Problem | -- | -- | 0 | |
| b) Spalling? | NO Problem | -- | -- | 0 | |
| c) Corrosion of reinforcement? | NO Problem | -- | -- | 0 | |
| d) Poor concrete? | NO Problem | -- | -- | 0 | |
| D- MASONRY WALLS | |||||
| a) Cracking? | NO Problem | -- | -- | 0 | |
| b) Bulging? | NO Problem | -- | -- | 0 | |
| c) Poor pointing? | NO Problem | -- | -- | 0 | |
| d) Deterioration of bricks or stones? | NO Problem | -- | -- | 0 | |
| E- EMBANKMENTS AND FILL IN FRONT OF ABUTMENT | |||||
| a) Scour at base of slopes? | NO Problem | -- | -- | 0 | |
| b) Slippage of fill? | NO Problem | -- | -- | 0 | |
| c) Erosion of fill? | NO Problem | -- | -- | 0 | |
| d) Cracking of road or embankment edge? | NO Problem | -- | -- | 0 | |
| e) Piping failure of fill? | NO Problem | -- | -- | 0 | |
| 8 | Left Side ABUTMENT, WING WALLS & RETAINING WALLS Component Weightage 10 | ||||
| A- GENERAL | |||||
| a) Erosion or scour at abutment? | Yes | Not So Bad | Much Qty | 3 | |
| b) Damage to foundation? | NO Problem | -- | -- | 0 | |
| c) Movement of abutment? | Yes | Not So Bad | Not Much Qty | 1 | |
| d) Debris against abutment? | Yes | Bad | Not Much Qty | 4 | |
| e) Vegetation growing on-or in abutment? | NO Problem | -- | -- | 0 | |
| f) Scour near to retaining walls? | NO Problem | -- | -- | 0 | |
| g) Movement of retaining walls? | NO Problem | -- | -- | 0 | |
| h) Water leaking down through the expansion joint? | NO Problem | -- | -- | 0 | |
| B- DRAINAGE SYSTEM | |||||
| a) Not enough weepholes? | NO Problem | -- | -- | 0 | |
| b) Weepholes not working? | NO Problem | -- | -- | 0 | |
| c) Water leaking through the abutment? | NO Problem | -- | -- | 0 | |
| C- CONCRETE WALLS | |||||
| a) Cracking? | NO Problem | -- | -- | 0 | |
| b) Spalling? | NO Problem | -- | -- | 0 | |
| c) Corrosion of reinforcement? | NO Problem | -- | -- | 0 | |
| d) Poor concrete? | NO Problem | -- | -- | 0 | |
| D- MASONRY WALLS | |||||
| a) Cracking? | NO Problem | -- | -- | 0 | |
| b) Bulging? | NO Problem | -- | -- | 0 | |
| c) Poor pointing? | NO Problem | -- | -- | 0 | |
| d) Deterioration of bricks or stones? | NO Problem | -- | -- | 0 | |
| E- EMBANKMENTS AND FILL IN FRONT OF ABUTMENT | |||||
| a) Scour at base of slopes? | NO Problem | -- | -- | 0 | |
| b) Slippage of fill? | NO Problem | -- | -- | 0 | |
| c) Erosion of fill? | Yes | Not So Bad | Some Qty | 2 | |
| d) Cracking of road or embankment edge? | NO Problem | -- | -- | 0 | |
| e) Piping failure of fill? | NO Problem | -- | -- | 0 | |
| 9 | Embankments Component Weightage 10 | ||||
| A- STONE PITCHING SLOPE PROTECTION | |||||
| a) Cracking? | Yes | Not So Bad | Much Qty | 3 | |
| b) Poor pointing? | NO Problem | -- | -- | 0 | |
| c) Scour or erosion at edge? | NO Problem | -- | -- | 0 | |
| d) Pieces broken off? | Yes | Not So Bad | Some Qty | 2 | |
| e) Piping failure of fill? | NO Problem | -- | -- | 0 | |
| B- SLOPE PROTECTION WITH CRATES | |||||
| a) Not much movement of crates? | NO Problem | -- | -- | 0 | |
| b) Damage to crates or ties? | NO Problem | -- | -- | 0 | |
| C- PITCHING SLOPE PROTECTION WITH CONCRETE BLOCKS | |||||
| a) Slope getting washed out? | NO Problem | -- | -- | 0 | |
| b) Settlement? | NO Problem | -- | -- | 0 | |
| 10 | RIVER BED Component Weightage 10 | ||||
| A- BED PROTECTION AND APRONS | |||||
| a) Large holes in the river bed? | Yes | Not So Bad | Much Qty | 3 | |
| b) Loss of material | NO Problem | -- | -- | 0 | |
| c) Crates broken away from pier or abutment? | NO Problem | -- | -- | 0 | |
| d) Damage to wires or ties? | NO Problem | -- | -- | 0 | |
| B- STONE PITCHING OR CONCRETE BED PROTECTION AND APRONS | |||||
| a) Scour at edge? | Yes | Bad | Not Much Qty | 4 | |
| b) Cracking? | NO Problem | -- | -- | 0 | |
| c) Spalling or stones missing? | Yes | Not So Bad | Not Much Qty | 1 | |
| d) Erosion of surface? | NO Problem | -- | -- | 0 | |
| e) Corrosion of reinforcement? | NO Problem | -- | -- | 0 | |
End of Report