ID :691
RCC Slabe Bridge at Jassari to Saijna Road Over Parveen River
on Chainage 2.000 of road unknown
In District Udham Singh Nagar Under CD Khatima Division
Critical Report on Bridge Condition
Form Filled By Ajeet Kumar Satsangi [42270313M01301]
Inspection Team
Detail Report
# | Parameter | Problem ? | How Bad? | How Much? | |
---|---|---|---|---|---|
1 | ROAD APPROCHES AND DECK Component Weightage 10 | ||||
A- ROAD SURFACE NEAR BRIDGE | |||||
a) Bumpy road surface near bridge? | Yes | Very Bad | Much Qty | 9 | |
B- DRAINAGE | |||||
a) Badly built road drainage near bridge? | Yes | Very Bad | Much Qty | 9 | |
b) Blocked or damaged road drains? | Yes | Very Bad | Much Qty | 9 | |
c) Water on the deck? | Not Applicable | -- | -- | -- | |
d) Blocked or damaged deck drains? | Yes | Bad | Much Qty | 6 | |
C- WEARING COAT | |||||
NOT APPLICABLE | |||||
D- KERBS & FOOTPATHS | |||||
a) Loose railing fixtures? | Not Applicable | -- | -- | -- | |
a) Damaged or loose kerbs? | Not Applicable | -- | -- | -- | |
2 | PARAPETS, RAILINGS AND CRASH BARRIERS Component Weightage 10 | ||||
a) Impact damaged? | Yes | Bad | Much Qty | 6 | |
b) Loose or damaged fixings? | Not Applicable | -- | -- | -- | |
c) Loose base of posts? | Yes | Bad | Much Qty | 6 | |
d) Damaged coatirig or paint on steel surface? | Yes | Bad | Much Qty | 6 | |
e) Corrosion on steel surface? | Not Accessible | -- | -- | -- | |
f) Cracking on Masonary Parapets? | Yes | Very Bad | Much Qty | 9 | |
g) Movement or bending of parapet? | Not Accessible | -- | -- | -- | |
h) Poor pointing/ Plaster on parapet? | Yes | Very Bad | Much Qty | 9 | |
i) Deterioration of bricks or stones? | Not Applicable | -- | -- | -- | |
3 | EXPANSION JOINT AT ABUTMENTS & PIERS Component Weightage 10 | ||||
a) Damage to concrete of deck end or dirt wall near joint? | Not Accessible | -- | -- | -- | |
b) Debris or vegetation in joint? | Not Applicable | -- | -- | -- | |
c) Loose or damaged fixtures? | Not Applicable | -- | -- | -- | |
d) Damage or corrosion to metal parts? | Not Accessible | -- | -- | -- | |
e) Damage to rubber waterseals? | Not Accessible | -- | -- | -- | |
4 | RIVER Component Weightage 10 | ||||
A- BLOCKAGES IN WATERWAY | |||||
a) Debris against piers or abutments? | Yes | Very Bad | Much Qty | 9 | |
b) Remains of old bridge under or upstream of the bridge? | Not Applicable | -- | -- | -- | |
c) Fencing or buildings under bridge? | Not Applicable | -- | -- | -- | |
d) Trees or bushes.growing under bridge? | Yes | Very Bad | Much Qty | 9 | |
B- CHANGE IN RIVER COURSE | |||||
a) River changing path upstream of bridge? | Yes | Very Bad | Much Qty | 9 | |
b) New islands forming upstream of bridge? | Not Applicable | -- | -- | -- | |
C- RIVER TRAINING WORKS | |||||
a) River attack beyond the upstream end of river training works? | Yes | Very Bad | Much Qty | 9 | |
b) Damage to walls? | Yes | Very Bad | Much Qty | 9 | |
c) Loss of pitching? | Not Applicable | -- | -- | -- | |
d) Damage to crates, timber, fencing, etc.? | Not Applicable | -- | -- | -- | |
e) Damage to trees? | NO Problem | -- | -- | 0 | |
5 | SUPERSTRUCTURE Component Weightage 60 | ||||
CONCRETE | |||||
General | |||||
a) Impact damage to girders, trusses or bracings? | Not Accessible | -- | -- | -- | |
b) Debris or vegetation on beams, girders, trusses bracings or joints? | Yes | Very Bad | Much Qty | 9 | |
c) Water coming through the deck? | Not Accessible | -- | -- | -- | |
d) Water from the deck drainage flowing on to girders, trusses, beams or bracings? | Not Accessible | -- | -- | -- | |
e) Not enough vertical & horizontal clearances? | Yes | Very Bad | Much Qty | 9 | |
CONCRETE BEAMS | |||||
a) Cracking? | Yes | Very Bad | Much Qty | 9 | |
b) Spalling? | Yes | Very Bad | Much Qty | 9 | |
c) Corrosion of reinforcement? | Not Accessible | -- | -- | -- | |
d) Poor concrete? | Yes | Very Bad | Much Qty | 9 | |
CONCRETE UNDERSIDE OF DECK | |||||
a) Cracking? | Yes | Very Bad | Much Qty | 9 | |
b) Spalling? | Yes | Very Bad | Much Qty | 9 | |
c) Reinforcement corrosion? | Not Accessible | -- | -- | -- | |
d) Poor concrete? | Yes | Very Bad | Much Qty | 9 | |
e) Less cover to reinforcement? | Not Accessible | -- | -- | -- | |
6 | BEARINGS Component Weightage 10 | ||||
NOT APPLICABLE | |||||
7 | Right Side ABUTMENT, WING WALLS & RETAINING WALLS Component Weightage 10 | ||||
A- GENERAL | |||||
a) Erosion or scour at abutment? | Yes | Very Bad | Much Qty | 9 | |
b) Damage to foundation? | Yes | Very Bad | Much Qty | 9 | |
c) Movement of abutment? | Yes | Very Bad | Much Qty | 9 | |
d) Debris against abutment? | Yes | Very Bad | Much Qty | 9 | |
e) Vegetation growing on-or in abutment? | Yes | Very Bad | Much Qty | 9 | |
f) Scour near to retaining walls? | Not Accessible | -- | -- | -- | |
g) Movement of retaining walls? | Not Applicable | -- | -- | -- | |
h) Water leaking down through the expansion joint? | Yes | Very Bad | Much Qty | 9 | |
B- DRAINAGE SYSTEM | |||||
a) Not enough weepholes? | Yes | Very Bad | Much Qty | 9 | |
b) Weepholes not working? | Yes | Very Bad | Much Qty | 9 | |
c) Water leaking through the abutment? | Yes | Very Bad | Much Qty | 9 | |
C- CONCRETE WALLS | |||||
a) Cracking? | Yes | Very Bad | Much Qty | 9 | |
b) Spalling? | Yes | Very Bad | Much Qty | 9 | |
c) Corrosion of reinforcement? | Not Accessible | -- | -- | -- | |
d) Poor concrete? | Yes | Very Bad | Much Qty | 9 | |
D- MASONRY WALLS | |||||
a) Cracking? | Yes | Very Bad | Much Qty | 9 | |
b) Bulging? | Yes | Very Bad | Much Qty | 9 | |
c) Poor pointing? | Yes | Very Bad | Much Qty | 9 | |
d) Deterioration of bricks or stones? | Not Accessible | -- | -- | -- | |
E- EMBANKMENTS AND FILL IN FRONT OF ABUTMENT | |||||
a) Scour at base of slopes? | Yes | Very Bad | Much Qty | 9 | |
b) Slippage of fill? | Not Accessible | -- | -- | -- | |
c) Erosion of fill? | Yes | Very Bad | Much Qty | 9 | |
d) Cracking of road or embankment edge? | Yes | Very Bad | Much Qty | 9 | |
e) Piping failure of fill? | Not Accessible | -- | -- | -- | |
8 | Left Side ABUTMENT, WING WALLS & RETAINING WALLS Component Weightage 10 | ||||
A- GENERAL | |||||
a) Erosion or scour at abutment? | Yes | Very Bad | Much Qty | 9 | |
b) Damage to foundation? | Yes | Very Bad | Much Qty | 9 | |
c) Movement of abutment? | Yes | Very Bad | Much Qty | 9 | |
d) Debris against abutment? | Yes | Very Bad | Much Qty | 9 | |
e) Vegetation growing on-or in abutment? | Yes | Very Bad | Much Qty | 9 | |
f) Scour near to retaining walls? | Not Accessible | -- | -- | -- | |
g) Movement of retaining walls? | Not Accessible | -- | -- | -- | |
h) Water leaking down through the expansion joint? | Yes | Very Bad | Much Qty | 9 | |
B- DRAINAGE SYSTEM | |||||
a) Not enough weepholes? | Yes | Very Bad | Much Qty | 9 | |
b) Weepholes not working? | Not Accessible | -- | -- | -- | |
c) Water leaking through the abutment? | Yes | Very Bad | Much Qty | 9 | |
C- CONCRETE WALLS | |||||
a) Cracking? | Yes | Very Bad | Much Qty | 9 | |
b) Spalling? | Not Accessible | -- | -- | -- | |
c) Corrosion of reinforcement? | Not Accessible | -- | -- | -- | |
d) Poor concrete? | Yes | Very Bad | Much Qty | 9 | |
D- MASONRY WALLS | |||||
a) Cracking? | Yes | Very Bad | Much Qty | 9 | |
b) Bulging? | Yes | Very Bad | Much Qty | 9 | |
c) Poor pointing? | Yes | Very Bad | Much Qty | 9 | |
d) Deterioration of bricks or stones? | NO Problem | -- | -- | 0 | |
E- EMBANKMENTS AND FILL IN FRONT OF ABUTMENT | |||||
a) Scour at base of slopes? | Yes | Very Bad | Much Qty | 9 | |
b) Slippage of fill? | NO Problem | -- | -- | 0 | |
c) Erosion of fill? | NO Problem | -- | -- | 0 | |
d) Cracking of road or embankment edge? | NO Problem | -- | -- | 0 | |
e) Piping failure of fill? | NO Problem | -- | -- | 0 | |
9 | Embankments Component Weightage 10 | ||||
A- STONE PITCHING SLOPE PROTECTION | |||||
a) Cracking? | Not Applicable | -- | -- | -- | |
b) Poor pointing? | Yes | Very Bad | Much Qty | 9 | |
c) Scour or erosion at edge? | Yes | Very Bad | Much Qty | 9 | |
d) Pieces broken off? | Not Accessible | -- | -- | -- | |
e) Piping failure of fill? | Not Accessible | -- | -- | -- | |
B- SLOPE PROTECTION WITH CRATES | |||||
a) Not much movement of crates? | Yes | Very Bad | Much Qty | 9 | |
b) Damage to crates or ties? | Yes | Very Bad | Much Qty | 9 | |
C- PITCHING SLOPE PROTECTION WITH CONCRETE BLOCKS | |||||
a) Slope getting washed out? | Yes | Very Bad | Much Qty | 9 | |
b) Settlement? | Yes | Very Bad | Much Qty | 9 | |
10 | RIVER BED Component Weightage 10 | ||||
A- BED PROTECTION AND APRONS | |||||
a) Large holes in the river bed? | Yes | Bad | Much Qty | 6 | |
b) Loss of material | Yes | Bad | Much Qty | 6 | |
c) Crates broken away from pier or abutment? | Yes | Very Bad | Much Qty | 9 | |
d) Damage to wires or ties? | Yes | Very Bad | Much Qty | 9 | |
B- STONE PITCHING OR CONCRETE BED PROTECTION AND APRONS | |||||
a) Scour at edge? | Not Applicable | -- | -- | -- | |
b) Cracking? | Not Applicable | -- | -- | -- | |
c) Spalling or stones missing? | Not Applicable | -- | -- | -- | |
d) Erosion of surface? | Not Accessible | -- | -- | -- | |
e) Corrosion of reinforcement? | Not Accessible | -- | -- | -- |
End of Report