Bridge (ID- 100 ) Inventory Report

Bridle Bridge Over Ganga river near Kailash Gate. On Chainage 0.300 of Narendernagar Muni ki Reti bridle road

Data finalized On 15 Jun 2024

By Er. Ashu Sajwan

Last Rated On 25 Nov 2023

Rating 0.00%

Categorized As

XXXXX on XX-XX-XXXX

In District : Tehri Under Division : CD Narendnagar

General

Bridge Type : Pedestrain Bridge
Structure No : 1/1
Feature Intersected : Ganga river
Name of Bridge : Bridle Bridge Over Ganga river near Kailash Gate.
Nearest Town : Munikireti, Narendra Nagar
Latitude (Northing) : 30.11649400
Longitude (Easting) : 78.30864900
Construction Year : 2020
Inventory Year : 2021

Geometric

Overall length (in meter) : 346.00
Total No of Span : 3
Maximuam Span (in meter) : 274.00
Span Arragment : 1x24+274+2x24
No of Lane : 1.000
Overall Width (m) : 3.900
Carriageway Width (m) : 3.900
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 4.250
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.5
Design Loading : Footpath Live Load
Load Rating : Footpath Live Load

Super-Structure

Superstructure Type : Suspension
Superstructure Material : Composite
Wearing Coat Type : Mastic asphalt
Expension Joint Type : Single Strip/Box Seal Joint
Railing/Crash Barrier type : Tubular steel
Bearing type : Neoprene

Sub-Structure

Founding Strata : Bouldery
Abutment Foundation Type : Well
Pier Foundation Type : Well
No of Piers : 2
Abutment Type : RCC buttressed type
Pier Type : RCC Hollow

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided