Bridge (ID- 1023 ) Inventory Report

Local Gadhera at Sarso On Chainage 1.000 of Late Shri Geetaram Pokhriyal state highway (Marchula Saraikhet Baijro Pokhra Satpuli Pauri state highway)

Data Yet Not Finalized

Last Rated On 16 Jun 2024

Rating 0.09%

Categorized As

XXXXX on XX-XX-XXXX

In District : Almora Under Division : PD Ranikhet

General

Bridge Type : Motor Bridge High Level
Structure No : 1/1
Feature Intersected : Local Gadhera at Sarso
Name of Bridge : Local Gadhera at Sarso
Nearest Town : Sarso
Latitude (Northing) : 29.88165600
Longitude (Easting) : 79.13995300
Construction Year : 2017
Inventory Year : 2021

Geometric

Overall length (in meter) : 10.70
Total No of Span : 1
Maximuam Span (in meter) : 10.70
Span Arragment : 1x10.70
No of Lane : 1.000
Overall Width (m) : 1.830
Carriageway Width (m) : 1.830
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 6.000
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Class B
Load Rating : Class B

Super-Structure

Superstructure Type : Truss
Superstructure Material : Reinforced concrete
Wearing Coat Type : Cement Concrete
Expension Joint Type : Other
Railing/Crash Barrier type : other
Bearing type : other

Sub-Structure

Founding Strata : Bouldery
Abutment Foundation Type : Open
Pier Foundation Type : other
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : other

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided