Bridge (ID- 1030 ) Inventory Report

jaurasi culvert On Chainage 41.143 of Jyolikot Almora Karanprayag national highway

Data Yet Not Finalized

Last Rated On 19 Jun 2024

Rating 0.00%

Categorized As

XXXXX on XX-XX-XXXX

In District : Almora Under Division : NH Haldwani

General

Bridge Type : Motor Bridge High Level
Structure No : 42/2
Feature Intersected : local nala
Name of Bridge : jaurasi culvert
Nearest Town : jaurasi
Latitude (Northing) : 29.52047000
Longitude (Easting) : 79.52237220
Construction Year : 2017
Inventory Year : 2020

Geometric

Overall length (in meter) : 6.55
Total No of Span : 1
Maximuam Span (in meter) : 6.55
Span Arragment : 1x6.55
No of Lane : 1.000
Overall Width (m) : 11.400
Carriageway Width (m) : 7.000
RS Footpath Width (m) : 1.500
LS Footpath Width (m) : 1.200
Approch Width i/c Shoulders (m) : 11.400
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Class A
Load Rating : Class A

Super-Structure

Superstructure Type : Solid slab
Superstructure Material : Reinforced concrete
Wearing Coat Type : Cement Concrete
Expension Joint Type : Asphaltic Plug Joint
Railing/Crash Barrier type : Cast-in-situ concrete
Bearing type : Neoprene

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Open
Pier Foundation Type : Raft
No of Piers : 2
Abutment Type : RCC Box type
Pier Type : RCC Solid

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided