Bridge (ID- 1033 ) Inventory Report

KHOYA khud On Chainage 3.300 of Purodi Rawana Damta motor road

Data finalized On 23 Dec 2022

By Er . Anil Kumar Bhatt

Last Rated On 22 May 2024

Rating 1.90%

Categorized As

XXXXX on XX-XX-XXXX

In District : Dehradun Under Division : TD Chakrata

General

Bridge Type : Motor Bridge High Level
Structure No : 3/1
Feature Intersected : KHOYA KHUD
Name of Bridge : KHOYA khud
Nearest Town : TIGER FALL,
Latitude (Northing) : 30.70962600
Longitude (Easting) : 77.88471100
Construction Year : 1996
Inventory Year : 2022

Geometric

Overall length (in meter) : 8.60
Total No of Span : 1
Maximuam Span (in meter) : 8.60
Span Arragment : 1*8.60
No of Lane : 1.000
Overall Width (m) : 5.150
Carriageway Width (m) : 5.000
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 5.950
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Class B
Load Rating : Class B

Super-Structure

Superstructure Type : T-beam and slab
Superstructure Material : Reinforced concrete
Wearing Coat Type : Cement Concrete
Expension Joint Type : Single Strip/Box Seal Joint
Railing/Crash Barrier type : Cast-in-situ concrete
Bearing type : Not Provided

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Open
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided