Bridge (ID- 1039 ) Inventory Report

Sukhi Nadi Bridge On Chainage 0.000 of Old Delhi Niti Pass state highway

Data finalized On 20 Sep 2022

By Rajesh Kumar

Last Rated On 20 May 2024

Rating 0.00%

Categorized As

XXXXX on XX-XX-XXXX

In District : Haridwar Under Division : PD Haridwar

General

Bridge Type : Motor Bridge High Level
Structure No : 2
Feature Intersected : Sukhi Nadi
Name of Bridge : Sukhi Nadi Bridge
Nearest Town : haridwar
Latitude (Northing) : 29.97068510
Longitude (Easting) : 78.17445260
Construction Year : 2021
Inventory Year : 2021

Geometric

Overall length (in meter) : 44.00
Total No of Span : 1
Maximuam Span (in meter) : 44.00
Span Arragment : 1*44
No of Lane : 2.000
Overall Width (m) : 12.500
Carriageway Width (m) : 7.500
RS Footpath Width (m) : 1.500
LS Footpath Width (m) : 1.500
Approch Width i/c Shoulders (m) : 7.000
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Class A
Load Rating : Class A

Super-Structure

Superstructure Type : T-beam and slab
Superstructure Material : Reinforced concrete
Wearing Coat Type : Cement Concrete
Expension Joint Type : Single Strip/Box Seal Joint
Railing/Crash Barrier type : Cast-in-situ concrete
Bearing type : Spherical and Cylindrical

Sub-Structure

Founding Strata : Sandy
Abutment Foundation Type : Open
Pier Foundation Type : Open
No of Piers : 0
Abutment Type : RCC counterfort type
Pier Type : RCC Solid

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided