Data finalized On 20 Sep 2022
By Mukesh Kumar Kotla
Last Rated On 16 Nov 2024
Rating 0.00%
Categorized As
XXXXX on XX-XX-XXXX
In District : Haridwar Under Division : PD Haridwar
General
Bridge Type :
Motor Bridge High Level
Structure No :
4
Feature Intersected :
Mayapur escape channel
Name of Bridge :
Vishvakalyan bridge
Nearest Town :
Kankhal
Latitude (Northing) :
29.91822360
Longitude (Easting) :
78.14411110
Construction Year :
2021
Inventory Year :
2021
Geometric
Overall length (in meter) :
80.00
Total No of Span :
1
Maximuam Span (in meter) :
80.00
Span Arragment :
1*80
No of Lane :
2.000
Overall Width (m) :
12.500
Carriageway Width (m) :
7.500
RS Footpath Width (m) :
1.500
LS Footpath Width (m) :
1.500
Approch Width i/c Shoulders (m) :
12.500
Gradient (%age) :
0
Skew Angle (degree) :
0.00
Radius of Curve in Plan (if Any) :
0.00
Design Data
HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition :
Moderate
Seismic Importance factor :
1.0
Design Loading :
Class A
Load Rating :
Class A
Super-Structure
Superstructure Type :
T-beam and slab
Superstructure Material :
Reinforced concrete
Wearing Coat Type :
Cement Concrete
Expension Joint Type :
Single Strip/Box Seal Joint
Railing/Crash Barrier type :
Tubular steel
Bearing type :
Spherical and Cylindrical
Sub-Structure
Founding Strata :
Bouldery
Abutment Foundation Type :
Well
Pier Foundation Type :
NA
No of Piers :
0
Abutment Type :
RCC counterfort type
Pier Type :
NA
Protection Work
Bank Protection Left Side of Up-stream :
no protection work provided
Bank Protection Right Side of Up-stream :
no protection work provided
Bank Protection Left Side of Down-stream :
no protection work provided
Bank Protection Right Side of Down-stream :
no protection work provided
Floor Protection on Up-stream :
no protection work provided
Floor Protection on Down-stream :
no protection work provided
Tratment for Corrosion Protection (if any) :
no special treatment provided