Data finalized On 20 Sep 2022
By Arvind Rawat
Last Rated On 13 Nov 2024
Rating 0.67%
Categorized As
XXXXX on XX-XX-XXXX
In District : Haridwar Under Division : PD Haridwar
General
Bridge Type :
Motor Bridge High Level
Structure No :
1/15
Feature Intersected :
Retmew River
Name of Bridge :
Mujahidpur Sattiwala Bridge
Nearest Town :
Buggawala , and Roorkee
Latitude (Northing) :
30.03087800
Longitude (Easting) :
77.91711100
Construction Year :
2020
Inventory Year :
2021
Geometric
Overall length (in meter) :
450.00
Total No of Span :
12
Maximuam Span (in meter) :
37.50
Span Arragment :
12x37.50 Meter
No of Lane :
2.000
Overall Width (m) :
8.500
Carriageway Width (m) :
7.500
RS Footpath Width (m) :
0.000
LS Footpath Width (m) :
0.000
Approch Width i/c Shoulders (m) :
10.000
Gradient (%age) :
3
Skew Angle (degree) :
0.00
Radius of Curve in Plan (if Any) :
0.00
Design Data
HFL Highest Flood Level :
193.000
OFL Ordinary Flood Level :
192.400
LWL Low Water Level :
191.400
Design Velocity (m/Sec) :
1.67
Design Discharge (Cumecs) :
3000.00
Soffit Level at Centre :
196.925
Road Level at Centre :
200.000
Design Scour Level at Pier :
7.150
Design Scour Level at Abutments :
7.150
Exposure Condition :
Moderate
Seismic Importance factor :
1.2
Design Loading :
Class A
Load Rating :
Class A
Super-Structure
Superstructure Type :
T-beam and slab
Superstructure Material :
Reinforced concrete
Wearing Coat Type :
Cement Concrete
Expension Joint Type :
Single Strip/Box Seal Joint
Railing/Crash Barrier type :
Cast-in-situ concrete
Bearing type :
Elastomeric
Sub-Structure
Founding Strata :
Hard clayey
Abutment Foundation Type :
Well
Pier Foundation Type :
Well
No of Piers :
11
Abutment Type :
RCC counterfort type
Pier Type :
RCC Solid
Protection Work
Bank Protection Left Side of Up-stream :
no protection work provided
Bank Protection Right Side of Up-stream :
two No spur 20x6.0mx1.50 m wire create
Bank Protection Left Side of Down-stream :
no protection work provided
Bank Protection Right Side of Down-stream :
no protection work provided
Floor Protection on Up-stream :
no protection work provided
Floor Protection on Down-stream :
no protection work provided
Tratment for Corrosion Protection (if any) :
spur Required