Bridge (ID- 1044 ) Inventory Report

KHEDI BRIDGE 630M On Chainage 3.500 of Fatehpur Khedi Shikohpur Sikroda Belki Haddiwala motor road

Data finalized On 20 Sep 2022

By Arvind Rawat

Last Rated On 20 Nov 2024

Rating 0.29%

Categorized As

XXXXX on XX-XX-XXXX

In District : Haridwar Under Division : PD Haridwar

General

Bridge Type : Motor Bridge High Level
Structure No : 1/4
Feature Intersected : Solani River
Name of Bridge : KHEDI BRIDGE 630M
Nearest Town : chutmalpur (U.P)
Latitude (Northing) : 30.04944444
Longitude (Easting) : 77.79777778
Construction Year : 2019
Inventory Year : 2021

Geometric

Overall length (in meter) : 630.00
Total No of Span : 21
Maximuam Span (in meter) : 30.00
Span Arragment : 21x30
No of Lane : 2.000
Overall Width (m) : 8.500
Carriageway Width (m) : 7.500
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 10.000
Gradient (%age) : 3
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level : 501.500
OFL Ordinary Flood Level : 500.000
LWL Low Water Level : 499.500
Design Velocity (m/Sec) : 1.67
Design Discharge (Cumecs) : 2944.50
Soffit Level at Centre : 504.500
Road Level at Centre : 506.500
Design Scour Level at Pier : 489.500
Design Scour Level at Abutments : 489.500
Exposure Condition : Moderate
Seismic Importance factor : 1.2
Design Loading : Class A
Load Rating : Class A

Super-Structure

Superstructure Type : T-beam and slab
Superstructure Material : Reinforced concrete
Wearing Coat Type : Cement Concrete
Expension Joint Type : Single Strip/Box Seal Joint
Railing/Crash Barrier type : Cast-in-situ concrete
Bearing type : Elastomeric

Sub-Structure

Founding Strata : Hard clayey
Abutment Foundation Type : Well
Pier Foundation Type : Well
No of Piers : 20
Abutment Type : RCC counterfort type
Pier Type : RCC Solid

Protection Work

Bank Protection Left Side of Up-stream : Guide Bundh
Bank Protection Right Side of Up-stream : Guide Bundh
Bank Protection Left Side of Down-stream : Guide Bundh
Bank Protection Right Side of Down-stream : Guide Bundh
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided