Bridge (ID- 1058 ) Inventory Report

Telpura Bridge 285M On Chainage 7.800 of Motor Road from Water Tank to Delhi Farm House in Mangolpura

Data finalized On 20 Sep 2022

By Arvind Rawat

Last Rated On 20 Nov 2024

Rating 0.31%

Categorized As

XXXXX on XX-XX-XXXX

In District : Haridwar Under Division : PD Haridwar

General

Bridge Type : Motor Bridge High Level
Structure No : 2/8
Feature Intersected : Mohondroh River
Name of Bridge : Telpura Bridge 285M
Nearest Town : Biharigarh (UP)
Latitude (Northing) : 30.06887100
Longitude (Easting) : 77.82170000
Construction Year : 2014
Inventory Year : 2021

Geometric

Overall length (in meter) : 285.00
Total No of Span : 1
Maximuam Span (in meter) : 26.33
Span Arragment : 2x25.18+ 9x26.33
No of Lane : 1.000
Overall Width (m) : 6.700
Carriageway Width (m) : 5.700
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 8.000
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier : 5.800
Design Scour Level at Abutments : 5.800
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Class A
Load Rating : Class A

Super-Structure

Superstructure Type : T-beam and slab
Superstructure Material : Pre-stressed concrete
Wearing Coat Type : Cement Concrete
Expension Joint Type : Single Strip/Box Seal Joint
Railing/Crash Barrier type : Cast-in-situ concrete
Bearing type : Elastomeric

Sub-Structure

Founding Strata : Soft clayey
Abutment Foundation Type : Well
Pier Foundation Type : Well
No of Piers : 11
Abutment Type : RCC counterfort type
Pier Type : RCC Solid

Protection Work

Bank Protection Left Side of Up-stream : Guide Bundh
Bank Protection Right Side of Up-stream : Guide Bundh
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided