Bridge (ID- 1107 ) Inventory Report

Brar Bridge On Chainage 980.000 of Nagla Lalpur road

Data finalized On 10 Jun 2022

By Er. Sachin Kumar

Last Rated On 28 Nov 2024

Rating 0.00%

Categorized As

XXXXX on XX-XX-XXXX

In District : Udham Singh Nagar Under Division : PD Rudrapur

General

Bridge Type : Motor Bridge High Level
Structure No : 1/3
Feature Intersected : Brar River
Name of Bridge : Brar Bridge
Nearest Town : Aanandpur
Latitude (Northing) : 28.96591100
Longitude (Easting) : 79.46807800
Construction Year : 1990
Inventory Year : 2021

Geometric

Overall length (in meter) : 11.10
Total No of Span : 3
Maximuam Span (in meter) : 11.10
Span Arragment : 3*3.7
No of Lane : 2.000
Overall Width (m) : 8.000
Carriageway Width (m) : 5.500
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 5.500
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level : 118.000
OFL Ordinary Flood Level : 108.000
LWL Low Water Level : 102.000
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre : 120.000
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 0.0
Design Loading : Class B
Load Rating : Class B

Super-Structure

Superstructure Type : Solid slab
Superstructure Material : Reinforced concrete
Wearing Coat Type : Cement Concrete
Expension Joint Type : Not Provided
Railing/Crash Barrier type : Not Provided
Bearing type : Not Provided

Sub-Structure

Founding Strata : Soft clayey
Abutment Foundation Type : other
Pier Foundation Type : other
No of Piers : 2
Abutment Type : RCC buttressed type
Pier Type : RCC Solid

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided