Bridge (ID- 1109 ) Inventory Report

Rcc bridge On Chainage 107.350 of Bikhyasain Deghat Bungidhar Mehalchori Bachuwaban Chokhutiya state highway

Data finalized On 22 Nov 2023

By Er Amardeep

Last Rated On 27 May 2024

Rating 0.18%

Categorized As

XXXXX on XX-XX-XXXX

In District : Chamoli Under Division : CD Gairsain

General

Bridge Type : Motor Bridge High Level
Structure No : 108/5
Feature Intersected : KhoKhand Ghadeyra
Name of Bridge : Rcc bridge
Nearest Town : Taitura
Latitude (Northing) : 29.95530000
Longitude (Easting) : 79.39941000
Construction Year : 2016
Inventory Year : 2021

Geometric

Overall length (in meter) : 15.00
Total No of Span : 1
Maximuam Span (in meter) : 15.00
Span Arragment : 1x15
No of Lane : 1.000
Overall Width (m) : 6.000
Carriageway Width (m) : 4.250
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 6.000
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 0.0
Design Loading : Class B
Load Rating : Class B

Super-Structure

Superstructure Type : T-beam and slab
Superstructure Material : Reinforced concrete
Wearing Coat Type : Cement Concrete
Expension Joint Type : Single Strip/Box Seal Joint
Railing/Crash Barrier type : Cast-in-situ concrete
Bearing type : Roller & Rocker

Sub-Structure

Founding Strata : Sandy
Abutment Foundation Type : Raft
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided