Bridge (ID- 1111 ) Inventory Report

Parthola Jhoola Pul On Chainage 43.300 of BhatraujKhan Ganai Chaukhutia state highway

Data finalized On 31 Oct 2022

By Er. Khajan Singh Rawat

Last Rated On 15 Nov 2023

Rating 0.00%

Categorized As

XXXXX on XX-XX-XXXX

In District : Almora Under Division : CD Ranikhet

General

Bridge Type : Pedestrain Bridge
Structure No : 44/1
Feature Intersected : Ram Ganga
Name of Bridge : Parthola Jhoola Pul
Nearest Town : Parthola
Latitude (Northing) : 29.79973333
Longitude (Easting) : 79.27429722
Construction Year : 1987
Inventory Year : 2021

Geometric

Overall length (in meter) : 67.00
Total No of Span : 1
Maximuam Span (in meter) : 67.00
Span Arragment : 1x67.00
No of Lane : 1.000
Overall Width (m) : 1.600
Carriageway Width (m) : 1.600
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 2.000
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level : 845.000
OFL Ordinary Flood Level : 842.000
LWL Low Water Level : 800.000
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Footpath Live Load
Load Rating : Footpath Live Load

Super-Structure

Superstructure Type : Suspension
Superstructure Material : Reinforced concrete
Wearing Coat Type : Bituminous Concrete
Expension Joint Type : Other
Railing/Crash Barrier type : Steel rolled section
Bearing type : Not Provided

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Raft
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided