Bridge (ID- 1124 ) Inventory Report

valley suspension bridge On Chainage 104.950 of Bikhyasain Deghat Bungidhar Mehalchori Bachuwaban Chokhutiya state highway

Data finalized On 25 Nov 2023

By Er Amardeep

Last Rated On 27 May 2024

Rating 3.10%

Categorized As

XXXXX on XX-XX-XXXX

In District : Chamoli Under Division : CD Gairsain

General

Bridge Type : Pedestrain Bridge
Structure No : 105/8
Feature Intersected : Ram Ganga River
Name of Bridge : valley suspension bridge
Nearest Town : Ojiya-Bagarh Latugair
Latitude (Northing) : 29.94725000
Longitude (Easting) : 79.38255500
Construction Year : 1978
Inventory Year : 2021

Geometric

Overall length (in meter) : 60.00
Total No of Span : 1
Maximuam Span (in meter) : 60.00
Span Arragment : 1x60
No of Lane : 1.000
Overall Width (m) : 1.800
Carriageway Width (m) : 1.800
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 2.000
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 0.0
Design Loading : Footpath Live Load
Load Rating : Footpath Live Load

Super-Structure

Superstructure Type : Suspension
Superstructure Material : Steel
Wearing Coat Type : Bituminous Concrete
Expension Joint Type : Other
Railing/Crash Barrier type : other
Bearing type : other

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Raft
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided