Bridge (ID- 1148 ) Inventory Report

shivlok bridge On Chainage 5.350 of Ring Road of Dehradun(Jogiwala to Kirsali Chock) state highway

Data Yet Not Finalized

Last Rated On 15 Jun 2024

Rating 0.05%

Categorized As

XXXXX on XX-XX-XXXX

In District : Dehradun Under Division : TD Rishikesh

General

Bridge Type : Motor Bridge High Level
Structure No : 06/1
Feature Intersected : Nalapani shivlok nala
Name of Bridge : shivlok bridge
Nearest Town : Ladpur
Latitude (Northing) : 30.32069500
Longitude (Easting) : 78.07543400
Construction Year : 2018
Inventory Year : 2021

Geometric

Overall length (in meter) : 34.00
Total No of Span : 5
Maximuam Span (in meter) : 6.80
Span Arragment : 5x6.8
No of Lane : 2.000
Overall Width (m) : 15.000
Carriageway Width (m) : 12.000
RS Footpath Width (m) : 1.500
LS Footpath Width (m) : 1.500
Approch Width i/c Shoulders (m) : 12.000
Gradient (%age) : 2
Skew Angle (degree) : 30.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level : 100.000
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Class A
Load Rating : Class A

Super-Structure

Superstructure Type : Single/Multi-cell Box
Superstructure Material : Reinforced concrete
Wearing Coat Type : Cement Concrete
Expension Joint Type : Single Strip/Box Seal Joint
Railing/Crash Barrier type : Tubular steel
Bearing type : Roller & Rocker

Sub-Structure

Founding Strata : Sandy
Abutment Foundation Type : Open
Pier Foundation Type : Open
No of Piers : 4
Abutment Type : RCC counterfort type
Pier Type : other

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided