Bridge (ID- 1169 ) Inventory Report

Steel girder Bridel Bridge mile 38 of Almora Jhulaghat beidle path

Data finalized On 14 Dec 2022

By Pradeep Kumar Joshi

Last Rated On 31 May 2024

Rating 9.66%

Categorized As

XXXXX on XX-XX-XXXX

In District : Pithoragarh Under Division : TD Berinaag

General

Bridge Type : Pedestrain Bridge
Structure No : 1/1
Feature Intersected : salikhet gadhera
Name of Bridge : Steel girder Bridel Bridge mile 38 of Almora Jhulaghat beidle path
Nearest Town : golayi
Latitude (Northing) : 29.65182900
Longitude (Easting) : 80.07108300
Construction Year : 2003
Inventory Year : 2021

Geometric

Overall length (in meter) : 12.50
Total No of Span : 1
Maximuam Span (in meter) : 12.50
Span Arragment : 1x12.5
No of Lane : 1.000
Overall Width (m) : 1.800
Carriageway Width (m) : 1.800
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 1.700
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : NA
Load Rating : NA

Super-Structure

Superstructure Type : Truss
Superstructure Material : Steel
Wearing Coat Type : Cement Concrete
Expension Joint Type : Other
Railing/Crash Barrier type : Steel rolled section
Bearing type : Roller & Rocker

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Open
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : Plum concrete work to be needed for protection work .
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : Painted